1 OPERATING DATA REPORT DOCKET NO. 50-364 DATE 11-6-83 COMPLETED BY W.G.Hairston, III TELEPHONE (?nsinog_s156 OPERATING STATUS Notes Joseph M. Farley - Unit 2
- 1. Unit Name.
- 1) Cumulative data since
- 2. Reporting Period.
October. 1983 7/30/81, date of commercial 2652
- 3. Licensed Thermal Power (MWt):
operation.
860
- 4. Nameplate Rating (Grom MWe):
829 S. Design Electncal Rating (Net MWe):
854.7
- 6. Maximum Dependable Capacity (Grom MWe):
813.7
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted. If Any (Net MWe):
N/A
- 10. Reasons For Restrictions.If Any:
N/A This Month Yr.-to-Date
' Cumulative 745 7.296 19.777
- 11. Hours In Reporting Period 176.6 6,390.7 17,175.2
- 12. Number Of Hours Reactor Was Critical i
0.0 0.0 138.4
- 13. Reactor Reserve Shutdown Hours f
- 14. Hours Generator On.Line 129.0 6,343.0 16.945.4 0.0
.0. 0 0.0
- 15. Unit Reserve Shutdown Hours
' 16. Grom Thermal Energy Generated (MWH) 163.398 16.519.200 41.941.014 47,902 5.201.582 13.874.816
- 17. Grom Electrical Energy Generated (MWH) 18.' Net Electncal Energy Generated (MWH) 34.258 4,931,914 13,147,964
- 19. Unit Semce Factor 17.3 86.9 85.7 17.3 86.9~
85.7
- 20. Unit Availability Factor s.7 83.1 81.7
.s. Unit Capacity Factor (Using MDC Net) 5.5 81.5 80.2
- 22. Unit Capacity Factor (Using DER Net) 25.1 0.7 5.2
. 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Eacht:
M/A l
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved 5/6/81 5/8/81 iNITIM CR: TIC.4un INITIAL ELECTRICITY 5/24/81 5/25/81 f
f COMMERCIAL OPER ATION 8/1/R1 7/in/gi f'
B311150305 831106 PDR ADOCK 05000364 R
PDR pu-
~
~--.
_-~
u DOCKET NO. 50-364 2
UNIT DATE 11/6/83 COS(PLETED BY W.G.Hairston, III TELEPHONE (205)899-5156 al0NTil October, 1983 DAY AVERAGE DAILY POWER LEVEL DAY' AVERAGE DAILY power LEVEL (AlWe-Net)
(&lWe-Net) 0 0
1 17 0
ja o
2 o
0 39 j
0 4'
O g
0 0
23 5
0 6
0 22 0
o 1
y 0
24,
0 g
93 0
25 9
192 0
26 10 O
87 II 27 0
12 0
23 0
305 13 29 459 0
30 14 IS 0
3g 617 16 0
MUCDONS On tiiis formst.!ist the sversge dsity umt power icvelin AtWe-Net for each d:y in the reporting month. Campute to
, the neare:t whole rne;swatt.
(9(77)
~ _. -
y l
y i
t o
DOCKET NO. 50-36.4 UNIT SilU1 DOWNS AND POWER RElH)CTIONS UNIT NAhlE J.M.Farlev-Unit 2 DATE 1146/81 ETED W W G -Hai en, III REPORT klONTil OCTORER TEl.I.PilONE J2&5). 899-5156 E
c
,_ g Y
1.icensee Eg jg Cause & Currective E
No.
I) ate h
5g 2 5 a:
Event gj pu Action to mo Prevent Recurrence t-fg g
cge Report a u
2
!6 001 831001 s
'572.8 C
1 NA NA NA Cycle II-III refueling outage continued from 9/16/83.
j 002 831024 F
11.7 II 3
NA IIA CKTBRK Generator output. breaker opened i'
due to error by non-operations personnel.
003
- 831027, F
31.6 II 3
NA ZZ ZZZZZZ Train A reactor trip breaker l,,.
opened due to an SSPS malfunc-tion.
I
/
1 i
1 2
3 4
F: I.uted Reason:
hiethml:
Exhibit G. Insieuccion i
S: Stheduled A. Equipment Failure (Explain) 1 -hlanual for Prcparation of D.o e Il-klaintenance <d Test 2 hfannal Scram.
Ent y Sheets for I.icen..-
C-Refueling
- 3. Autonutic Scram.
Event Repose (l.l!R)i A INURI:G-D Hegulatiny Resisittion 4-Othes (Explain) 0161)
I: Operator Training A license Examination F. Adminntiative S
G Opciational I.isor (lixplain) thinbie I - Same Som.
l
('s/17) ll Olhes (E mplain) i
~
JOSEPH M. FARLEY NUCLEAR PLMIT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS OCTOBER, 1983 e
The cycle.II-III refueling outage continued into the month of October.
During the month of October there were two (2) auto-matic shutdowns.
The first occurred on October 24, 1983 and the second occurred on October 27, 1983.
The following safety-related maintenance was performed in the month of October:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Repaired E'rsin Steam Isolation Valves.
3.
Overhauled A and B reactor coolant drain tank pumps.
4.
Repacked #6 river water pump.
5.
Loaded Cycle 3 core.
6.
Repaired seal leak on 2A charging pump.
7.
Repaired B RHR pump.
OPERATING DATA REPORT DOCKET NO. 50-364 DATE 11-6-83 COMPLETED BY W.G.Hairston, III TELEPflONE NORoo-5156 OPERATING STATUS Notes Joseph M. Farley - Unit 2
- 1. Unit Name.
- 1) Cemulative data since October. 1983 7/30/81, date of commercial
- 2. Reporting Period.
2652
- 3. Licensed Thermal Power (MWt):
operation.
860
- 4. Nameplate Rating (Grom MWe):
829
- 5. Design Electrical Rating (Net MWe):
854.7
- 6. Maximum Dependable Capacity (Grom MWe):
813.7
- 7. Maximum Dependable Capacky (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since.Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted.lf Any (Net MWe):
N/A N/A
- 10. Reasons For Restrictions.lf Any:
This Month Yr to.Date
' Cur'nulative 745 7.296 19.777
- 11. Hours in Reporting Period 176.6 6,390.7 17,175.2
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 138.4
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 129.0 6,343.0 16.945.4 0.0
.0.0 o.o
- 15. Unit Reserve Shutdown Hours
- 16. Geom Thermal Energy Generated (MWH) 163.398 16.519.200 41.941.014 47,902 5.201.582 13.874.816
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electncal Energy Genersted (MWH) 34.258 4,931,914 13.147,964 17.3 86.9 85.7
- 19. Unit Service Facter 17.3 86.9 85.7
- 20. Unit Availability Factor s7 83.I 81.7
- 21. Unit Capacity Factor (Using MDC Neti 5.5 81.5 80.2
- 22. Unit Capacity Factor (Using DER Net) 25.1 0.7 5.2
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Dete,and Duratica of Each t:
M/A N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status iPrior to Commercial Operation):
Forecast Achiesed 5/6/81 5/8/81 i.NITIAs. CR:TICAGTY 5/24/81 5/25/81 INITIAL ELECTRICITY COMMERCIAL OPERATION 8 /1/R1 7 l'40 / R 1 p-i
DOCKET NO. 50-364 2
UNIT DATI 11/6/83 W.G.11airston, III C03fPLETED SY TILIf!f0NE (205)899-5156 October. 1983 AIONTil DAY AVERACE DAILY POWER 1.EVEL '
DAY' AVERACE DAILY POWER LEVEL
(&lwe-Net)
(agwe. Net) 0 0
37 1
0 13 0
2 0
0 g9 3
0 4'
0
.a 0
0 21 5
0 0
3 4
~
0 0
7 23 0
0
- J 8
93 0
25~
9 192 0
26 10 87 O
27 II 0
0 23 12 0
305 33 3
459 0
30 34 l
617 0
33 lg 1
16 0
4 i
INSTRUCTIONS On this format. list the average daily unit power levelin MWe-Net for each d:y in the reporting month. Compute to
, the nearest whole mepwast.
(9p7) y
,,---,--a-
--,-,,,-,-----,,-.-~,e,---,---,,,.----+,e-,-,--,,,--,,----,.-,--,--,-.,,-~~,---,-n-,,
.,-nu.
,r,ne-,en,.,~,,,-m-e,
-,e-,,
DOCKET M. 50-36.4 UNIT SHUTDOWNS AND POWER REEMICTIONS UNIT NAME J.di,Farley-Unit,2 DAIE 11/6/81
\\
3 COMPLE1E13 BY hLG.HM n&rm III REPORT MONTil ocTnnu TELEPilONE.1205) 899-5156 "E
f*3 jp
'g E'l t,
Cause & Conseceive Licensee p,
Acehm to N...
paie k
E?
m s oc Event
=3 gu Pievent Recuesence jZ E gg c Repews e u
in U t-e 2
3 6
001 831001 S
572.8 C
1 NA NA NA Cycle II-III refueling outage continued from 9/16/83.
i 002 831024 F
11.7 H
3 NA HA CKTBRK Generator output. breaker opened I
due to error by non-operations e
personnel.
005 831027 F
31.6 H
3 NA ZZ ZZZZZZ Train A reactor trip breaker opened due to an SSPS malfunc-tion.
I I
l l
l 2
3 4
F: Fueced Reasem:
Method:
Exhibit G Instructi m.
S: Stlicifuled A-Equipment Failure (Emplain)
- 1. Manual for Picpaeasiim of D.is.
i ll Maintenance o(Test 2-Manual Scraen.
Entey Slieces for I.icen - f I
C Hefueling 3 Autuinatic Scrant.
Event Repuel(I.l!RII
- INUREG-D Hegniasmy Restoiction 4.Oslees (Emplain) 0161)
I..Opesaine Training A license Examinallem F Ailminisisative 5
G Opesali mal I. sine (Explain) lisinbis I - Same Sinn.
I'll17) ll Othes (E aplain)
Malling Address AI:bama Pow;r Company 600 North 18th Str::t Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 7834081 F. L. Clayton, Jr.
Senior Vice President Flintndge Building AlabamaPower the sou N m twinc svs!v'n November 10, 1983 Docket No. 50-364 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the October, 1983 Monthly Operating Report for Joseph M.
Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of the Unit 2 Technical Specifications.
As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a
" Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very truly,
@L F. L. Claytor., j r.
FLCJ r/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy)
Director, IE (10 copies)
Director, RII (1 copy)
[h
'lI
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS OCTOBER, 1983 The Cycle II-III refueling outage continued into the month of October.
During the month of October there were two (2) auto-matic shutdowns.
The first occurred on October 24, 1983 and the second occurred on October 27, 1983.
The following safety-related maintenance was performed in the month of October:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Repaired Main Steam Isolation Valves, 3.
Overbauled A and B reactor coolant drain tank pumps.
4.
Repacked #6 river water pump.
5.
Loaded Cycle 3 core.
6.
Repaired seal leak on 2A charging pump.
7.
Repaired B RHR pump.