Forwards Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval
ML20078R632
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/15/1995
From: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078R636 List:
References
TXX-95036, NUDOCS 9502230057
Download: ML20078R632 (6)


Text

,

e == Log # TXX 95036 79 File # 10010

._ .-- 905.4

_- _ Ref. # 10CFR50.55aCf) 1UELECTRIC 7 February 15, 1995 C. Immes Terry Groep Vke FrenMent,hdear P

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 .

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50 445 AND 50 446 UNIT 1/ UNIT 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES, REVISION 5 (1989 EDITION OF ASME CODE. SECTION IX, NO ADDENDA:

UNIT 1 INTERVAL START DATE: AUGUST 13, 1990 FIRST INTERVAL:

UNIT 2 INTERVAL START DATE: AUGUST 3, 1993. FIRST INTERVAL)

Gentlemen:

Enclosed is Revision 5 to the Comanche Peak Steam Electric Station (CPSES)

Unit 1 and 2 Inservice Testing Plan (IST) for Pumps and Valves in the first interval. The Plan is a combined Unit 1/ Unit 2 Plan, implementing the same requirements from the ASME Boiler and Pressure Vessel Code,Section XI,1989 Edition of Section XI (No Addenda) on Units 1 and 2. The effective date of this revision is February 22, 1995, at 12:01 AM CST.

The attachment provides a detailed description of the changes made by Revision 5 to the Plan in a format identical to that provided for changes to the Final Safety Analysis Report (FSAR). All changes described in the attachment have been evaluated for relative significance (i.e., the group number 1, 2, 3 or 4 corresponds to each change justification as discussed in TU Electric letter TXX 88467 dated June 1, 1988). In addition, all changes applicable to CPSES Units 1 and 2 have been reviewed under the TU Electric 10CFR50.59 process and found not to include any "unreviewed safety questions."

0 '

0 0

23002J l

\

9502230057 950215 fDR ADOCK 0500 5 negy Finn leon Bryan street paises Texas 75201 34 1

vn f

'- TXX 95036

Page 2 of 2

- If you have any questions, please call Mr. Carl Corbin at (214) 812 8859.

Sincerely, C. Lance Terry r

By:

D. R. Woodlan Docket Licensing Manager CBC

- Attachment Enclosure c- Mr. L. J. Callan, Region IV Hr. D. D. Chambeilain, Revion IV Resident Inspectors CPSES Mr. T. J. Polich, NRR Mr. G. Bynog. TOLR (clo)

Mr. J. C. Hair, Authorized Nuclear Inservice Inspector

Attachment to TKX-95036 February 15, 1995 Page 1 of 2 f CPSES - INSERVICE TEST PROGRAM ( IST )

AMENDMENT / REVISION 5 DETAILED DESCRIPTION IT Page (as amended) Group Description l l

Table 1- 3 See Sheet No(s) :2, 3, and 12 Adds note 2 to clarify testing requirements for check valves 1AF-0045, 1AF-0057, and 1AF-0069 due to the scheduled removal of the valve internals during the fourth refueling outage for Unit 1. ,

Update  : ,

The internals of the Unit 1 check valves are scheduled for removal during the fourth refueling outage for Unit 1. After Minor Modification 93-443 has been accepted by operations, testing is no longer required. Based on system configuration these valves are not required to perform a safety function.

Change Request Number . IT-94-3.1 Commitment Register Number : ,

Related SER : 3.9.6 SSER :23 3.9.6 SER/SSER Impact  : No Table 4- 3 See Sheet No(s) :6, 7, 8, &9 Delete references to Relief Request V-5 for several  !

valves.

Update  :

The NRC Safety Evaluation dated January 29, 1993, and NUREG-0797, SER Supplement 26 rejected Relief Request V-5 as originally submitted. On July 1, 1993, via TXX-93237 TU Electric committed to revise the IST Program Plan to withdraw the relief request.

The NRC allowed the substitute testing described in Relief Request V-5 to continue to be implemented until startup from the third refueling outage for Unit 1 and until startup from the first refueling outage for Unit 2. The third refueling outage for Unit 1 and the first refueling outage for Unit 2 >

have been completed. Therefore, the references to Relief Request V-5 are being deleted from Table 4.

Change Request Number  : IT-93-7.1 Commitment Register Number : i Related SER : 3.9.6 SSER :23 3.9.6 l SER/SSER Impact  : No I Table 14- 3 See Sheet No(s) :4 Revised note 4 to clarify testing requi.ements for check valves ISW-0016 and 1 SW-0017 due to the scheduled removal of the valve internals during the fourth refueling outage for Unit 1.

Update  :

The internals of the Unit 1 check vavles are scheduled for removal during the fourth refueling 1

j

i .

Attachment to TXX-95036 February 15, 1995 Page 2 of 2 IT Page (as amended) Group Description outage for Unit 1. After Minor Modification 93-442 has been accepted by operations, testing is no longer required. These valves are not required to perform a " closed" safety function.

Change Request Number  : IT-94-3.2 .

Commitment Register Number :

Related SER . 3.9.6 SSER :23 3.9.6 i SER/SSER Impact  : No p

n i

l i

l l

s ,-

' COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 I 2 l INSERVICE TESTING PLAN FOR PUMPS AND VALVES P

'FIRST INTERVAL  :

INSTRUCTION SHEET (Page 1_of 1) l The following instructional information and checklist is being furnished to'  !

help insert Revision 5 into the Comanche Peak Steam Electric Station IST. i Discard the old sheets and insert the new sheets, as listed below. .

Remove Insert

. Cover Sheet Cover Sheet

~

Table 1 Page 1 of 11 Page 1 of 12 l Page 2 of 11 Page 2 l Page.3 of 11 Page 3  :

Page 4 of 11 Page 4 Page 5 of 11 Page 5  ;

Page 6 of 11 Page 6 -!

Page 7 of 11 Page 7 i Page 8 of 11 Page 8  :

Page 9 of 11 Page 9 '

Page 10 of 11 Page 10 Page 11 of 11 Page 11 Notes, Page 1 Page 12 i Table 4 Page 1 of 12 Page 1 of 16 L Page 2 of 12 Page 2 i Page 3 of 12 Page 3  :

Page 4 of 12 Page 4 1 Page 5 of 12 Page 5- l Page 6 of 12 Page 6 l Page 7 of 12 Page 7 l Page 8 of 12 Page 8 Page 9 of 12 Page 9 Page 10 of 12 Page 10 j Page 11 of 12 Page 11 -!

Page 12 of 12 Page 12 d Notes Page 1 Page 13  !

Notes, Page 2 Page 14 Notes, Page 3 Page 15 Notes, Page 4 Page 16 Table 14 Page 1 of 3 Page 1 of 4 Page 2 of 3 Page 2 Page 3 of 3 Page 3 Notes, Page 1 Page 4 y

i

.G .

Effective Paae Listina EPL-1 thru EPL-5 EPL-1 thru EPL-5 'l

.w. . NOTE: Please complete the entry for insertion of Revision 5 on the " Record of-  !

Changes" form located at the beginning of the IST Plan. j I

i I

i t

i e

t i

i t

i I

I I

't i

i h

. -._ _.