ML20078Q332
| ML20078Q332 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 02/09/1995 |
| From: | Kofron K COMMONWEALTH EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20078Q335 | List: |
| References | |
| BW-95-0018, BW-95-18, NUDOCS 9502210209 | |
| Download: ML20078Q332 (1) | |
Text
(..
N Commonw2 lth Edison L
C.,.,} Brtidwood Nucbtr Powsr Station l
~
Routs #1, Box 84 V ~J Braceville, Illinois 60407 i
\\
Telephone 815/458-2801
{
)
February 9,1995 BW/95-0018 i
Office of Resource Management U.S. Nuclear Regulatory Commission r
).-
Washington, D.C. 20555 Attention:
Document Control Desk
Subject:
Braidwood Station's Unit 2 Reactor Containment
)
Type A Integrated Leakage Rate Test j
NRC Docket Nos. 50-456 and 50-457 Enclosed is Comed's report for the " Reactor Containment Building Integrated Leak Rate Test,"
j conducted from October 27 through November 9,1994, for Braidwood Unit 2. This report is to 3
be submitted to the NRC approximately three months after conducting the test in accordance with i
10 CFR 50, Appendix J, Section V.
l The report describes the second Unit 2 Type A containment leakage rate test performed using.
f Braidwood Technical Surveillance 2BwVS 6.1.2.a-1, " Unit 2 Primary Containment Type A
).
Integrated Leakage Rate Test (ILRT)," in accordance with the requirements of 10 CFR 50, Appendix J, Section III.A.
Should you have any questions, contact Allen Checca, Braidwood Systems Engineering Supervisor, at (815) 458-2801, extension 2243.
)
Yours truly, b
M u
K.L. Kofron
)
Station Manager Braidwood Nuclear Station j
KLK/AC/dia
)
Attachment ec:
J.B. Martin, NRC Regional Administrator, Rill R.R. Assa, Project Manager, NRR S.G. DuPont, Sr. Resident Inspector
)
9502210209 950209 o'I i
)
PDR ADOCK 05000457 I
I P
.