GeroW R. Rainey V6c3 Pr2ddent Perch Bottom Atomic Power Staton l
m
' ECO ENERGY P
eccoe 'avce-a"r f1D 1, Box 208 Detta, PA 173r 9739 717 456 7014 December 14, 1994 U.S. Nuclear Regulatory M uion Wma'1t Control Desk Washington, D.C.
20555 Docket Nos. 50-277 and 50-278 Gentlemen:
Enclosed are twelve copies of the monthly operating Laru.L for Peach Bottom Units 2 arxi 3 for the month of November 1994 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.
Sincerely, ld R. Rainey l
Vice President, i
Peach Bottcan Power Station 41 at&
GRR/ M /GHG/TJN/MSH wjj enclosures oc:
R.A. Burricelli, Public Service Electric & Gas W.P. Dornsife, Conanonwealth of Pennsylvania R. I. WT anti, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident Inspector H.C. Schwe m, Atlantic Electric A.F. Kirby, III, Delmarva Power & Light INPO Records Center ocn 94-14180 gm 9412210129 941130 k
l PDR ADOC..: 05000277 v
R PDR
PERDI BQFITM MGEIC poler SMFIGi letc 30pmEX OPERMPIGES RES9dW NOVEMBER 1994 IBIIT 2 Unit 2 began the month of November at the rerated 100% runinal power. On Novenber 5th power was rdv'ad to perform a rod pattern adjustment and the ARIS/MELIA POD. 'Ibe unit was returned to 100% naminal power later the same day and operated at that level until Novenber 18th when power was rdM to perform waterbox cleaning. 'Ibe unit was returned to 100% naminal power on the 19th and operated at that level for the remainder of the month.
IMIT 3 Unit 3 began the month of November at naminal 100% power. 'Ihe Unit operated at that power level until the November loth when power was reduced to perform waterbox cleaning. 'Ibe unit was returned to 100% nominal power on November lith arri operated at that level for the remairxler of the month.
4 1
Docket No. 50-277 Attadment to Monthly Operating Report for Novw=mhar 1994 IMIT 2 REFUELDG INPGGEKIGi i
1.
Name of facility:
Peadt Bottan thit 2 5
2.
Scheduled date for next refueling shutdown:
l Reload 11 scheduled for September 20, 1996.
3.
Scheduled date for restart following refueling:
Restart following refueling forecast for November 2, 1996.
4.
Will refueling or resunption of operation therefore require a technical f
specification change or other license amendment?
l 4
N/A i
If answer is yes, what, in general, will these be?
I 5.
Scheduled date(s) for subnitting supered licensing action and supporting information:
N/A 6.
Inportant licensing considerations aelated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis ii=U. ids, significant changes in fuel design, new operating s vcudares:
i N/A 7.
'1he number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2420 Fuel Assemblies, 59 Fuel Rods
i Docket No. 50-277 Attactunent to Monthly Operating Report for November 1994 Page 2 IMIT 2 REFUELING INFGGEEEN (Continued) 8.
'Ibe present licensed spent fuel pool storage capacity ar,d the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel amaamblies h spent fuel pool storage capacity has been relicensed for 3919 fuel assemblies.
9.
h projected date of the last refueling that can be discharged to the spent fuel pool assaming the present capacity:
September 2002 without full core offload mP ility.
h
\\
September 1998 with full core offload mPhility.
.- ~ -
i Docket No. 50-278 Attactzment to Monthly operating Report for November 1994
)
IMIT 3 REFUELING INPG09LTI(N 1.
Name of facility:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdown:
Reload 10 scheduled for September 11,1995 3.
Scheduled date for restart following refueling Restart following refueling scheduled for November 13, 1995 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license siir.Aic-M.?
No If answer is yes, what, in general, will these be?
5.
Scheduled date(s) for subnitting proposed licensing action and supporting information:
N/A 6.
Iltportant licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or perforstance analysis methods, significant charges in fuel design, new operating g uculures:
N/A 7.
'Ihe number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Ebel Assemblies (b) Fbel Pool - 2201 Ibel Assemblies, 6 Fuel Rods 8.
h present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
h spent fuel pool storage capacity has been relicensed for 3819 fuel acte:amblies.
1 Docket No. 50-278 d
Attactment to Mont.hly Operating Report for Novest.'m 1994 page 2 IMIT 3 REFUELING INEGWWEI(M (Cbntinued) i 9.
'Ihe projected date of the last refueling that can be discharged to the spent fuel pool a==ing the present capacity:
September 2003 without full care offload capability.
September 1997 with full core offload capability.
6 E
1 h
l l
i j
__-.__e
AVERAGE DOILY UNIT POWE3 LEVEL DOCKET NO. 50 - 277 UNIT PEACH 8OTTOM UNIT 2 DATE DECEMBER 12, 1994 COMPANY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 MONTH NOVEMBER 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 1109 17 1103 2
1117 18 1090 3
1118 19 983 4
1116 20 1118 5
1004 21 1118 6
1108 22 1122 7
1115 23 1122 8
1115 24 1122 9
1118 25 1124 10 1114 26 1124 11 1109 27 1128 12 1109 28 1128 13 1105 29 1130 14 1126 30 1130 15 1101 16 1121
AVERAGE DAILY UNIT power LEVEL -
DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE DECEMBER 12 1994 COMPANY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND dELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 MONTH NOVEMBER 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MwE-NET)
(MWE-MET) 1 1049 17 1047 2
1048 18 1063 3
1054 19 1049 4
1052 20 1049 5
1052 21 1053 6
1045 22 1057 7
1049 23 1057 8
1044 24' 1057 9
1044 25 1058 10 991 26 1067 11 935 27 1063 12 1037 28 1067 13 1042 29 1067-14 1066 30 1067 15 1041 16 1061
... ~.
OPEROTING DATO REPORT DOCKET NO. 50 - 277 DATE DECEMBER 12, 1994 COMPLETED 8V PECO ENERGV COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 OPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM UNIT 2 NOTES: THERE WERE TWO LOAD DROPS
- 2. REPORTING PERIOD: NOVEMBER. 1994 GREATER THAN 20% THIS
- 3. LICENSED THERMAL POWER (MWT):
3458 MOsTH FOR ARTS MELLA MOD 4 NAMEPLATE RATING (GROSS MWE):
1152 AND ROD PATTERN ADJUSTMENT
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1065 AND WATER BOX CLEANING
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1051 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUM8ER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
93-12 POWER RERATE CHANGED LICENSED THERMAL POWER FROM 3293 TO 3458 MWT
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PFRIOD 720 B.01C 178.896
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7.107.0 113.219.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 720.0 7.039.0 109.259.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWM) 2.466.828 21.259.327 325.748,820
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 825.100 6.866.900 107.018.390
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 797.943 6.611.637 102.602.439 PAGE 1 OF 2
OPEQQTING DATA CEPORT (CONTINUED)
DOCKET NO. 50 - 277 DATE DECEMBER 12, 1994 THIS MONTH VR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 87.8 61.1
- 20. UNIT AVAILABILITV FACTOR 100.0 87.8 61.1
- 21. UNIT CAPACITV FACTOR (USING MDC NET) 105.4 78.5 54.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 104.1 77.4 53.9
- 23. UNIT FORCED OUTAGE RATE 0.0 1.7 13.2 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DAYE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TC COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITV 09/16/73 INITIAL ELECTRICITY O2/18/74 COMMERCIAL OPERATION 07/05/74 PAGE 2 OF 2
k OPERATING DATA REPORT 1
i DOCKET NO. 50 - 278
[
}
DATE DECEMBER 12, 1994 l
COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITV i
SITE ENGINEERING PEACH 90TTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 i
OPERATING STATUS 1 UNIT NAME: PEACH BOTTOM UNIT 3 NOTES - THERE WAS ONE LOAD DROP
- 2. REPORTING PERIOD: NOVEMBER, 1994 GREATER THAN 20% THIS
- 3. LICENSED THERMAL POWER (MWT):
3293 MONTH FOR WATER BOX i
4 NAMEPLATE RATING (GROSS MwE):
1152 CLEANING.
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1065 l
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1035 l
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH VR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 8.016 174.792
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7.844.0 112.515.4 l
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 8
14 HOURS GENERATOR ON-LINE 720.0 7.844.0 109.135.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 j
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2.357.628 25.361.550 324.135.027
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 780.400 8.345.000 106.335.732
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 754.411 8.077.722 102.051.729 4
PAGE 1 OF 2 J
OPERATING DQTO CEPORT (CONTINUED)
DOCKET NO. 50 - 278 DATE DECEMBER 12, 1994 THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 97.9 62.4 62k
- 20. UNIT AVAILABILITY FACTOR 100.0 97.9
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.2 97.4 56.4
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.4 94.6 54.8
- 23. UNIT FORCED OUTAGE RATE O.0 2.1 11.7 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: 11/14/95
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 PAGE 2 OF 2
?
il s
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT NAME PEACH BOTTOM UNIT 2 DATE DECEMBER 12 1994 REPORT MONTH NOVEMBER, 1994 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (7172 456-7014 EXT. 4027 TYPE lDUQATIONREASON METHOD OF l LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE SHUTTING DOWNl EVENT CODE CODE ACTION TO NO.
DATE (1)l (HOURS)
(2)
REACTOR (3) l REPORT a (4)
(5)
PREVENT RECURRENCE I
28 941105 Sl 9.0 B
4 RC COMROD ARTS MELLA MOD & ROD PATTERN ADJUSTMENT I
29 941118 S
9.0 8
4 HF HTEXCH WATER BOX CLEANING 8.0 (1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER) 0 - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE
- ~. -.......
.4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 UNIT MAME PEACH BOTTOM UNIT 3 DATE DECEMBER 12, 1994 REPORT MONTH NOVEMBER. 1994 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH tsOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 l METHOD OF l LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TVP5 DURATION REASON l SHUTTING DOWNl EVENT CODE CODE ACTION TO NO.
DATE (1)
(HOURS)
(2) l REACTOR (3) l REPORT #
(4)
(5)
PREVENT RECURRENCE I
I 20 941110 S
12.0 e
4 i
HF HTEXCH WATER BOX CLEANING I
I i
12.0 l
l 1
l (1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
I D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION I
F - ADMINISTRATIVE
-(5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE l
m w-i - - + - e v.w--
U-w
?
eu+cMWy-T--g 7'wg--a rW9-'T-V T
Fw pg-ewe-m r4~~g*-gupe
--mv--y-+
e
-em,-w----ewemi2 m -
a a
e> -
wwm
___,,____J