vice Presicent Peach Bottom Atomic Power Station
-:3EE.
GY ecco c erov ce-a v RD 1. Box 208 Delta. PA 17314-9739 717 456 7014 February 13,1995 U.S. Nuclear Regulatory Comm!asion Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of January 1995 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.
Sincerely, (g
Gerald R. Rainey Vice President, Peach Bottom Atomic Power Station
& Jbis GRR G/TNM/JGH:wjj enclosures cc:
R.A. Burricelli, Public Service Electric & Gas W.P. Domsite, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region 1. USNRC W.L Schmidt, USNRC, Senior Resident inspector H.C. Schwemm, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center 1'7003J ccn 95-14014
/{
9502170271 950131
8 DR ADOCK 0500 7
PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS
SUMMARY
JANUARY 1995 UNIT 2 Unit 2 began the month of January at 100% nominal power and operated at that level until January 7th when power was reduced to perform a rod pattem adjustment. The unit was returned to 100%
nominal power later the same day and operated at that level until January 12th when power was reduced to repair MSIV 86A. After repairs the unit was retumed to 100% nominal power later on the 12th. On January 19th power was reduced due to Reactor Water Oean-Up being in the dump mode.
RWCU remained in the dump mode until the 28th. The unit retumed to 100% nominal power and operated at that level for the remainder of the month.
UNIT 3 Unit 3 began the month of January at nominal 100% power. The Unit operated at that power level until the January 20th when power was reduced to remove the "B" Circ Pump from service due to screen problems. The unit was retumed to 100% nominal power on the 22nd and operated at that level for the remainder of January.
t l
Docket No. 50-277 Attachment to Monthly Operating Report for January 1995 UNIT 2 REFUEUNG INFORMATION 1.
Name of facility:
f Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdown:
Reload 11 scheduled for September 20,1996.
3.
Scheduled date for restart following refueling:
Restart following refueling forecast for November 2,1996.
4.
Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
N/A If answer is yes, what, in general, will these be?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or I
supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A
)
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies i
(b) Fuel Pool 2420 Fuel Assemblies. 59 Fuel Rods l
~
Docket No. 50-2T1 Attachment to Monthly Operating Report for January 1995 Page 2 UNIT 2 REFUELING INFORMATION (Continued) 8.
The present licensed spent fuel pool storage capacity and the size of any increase storage capacity that has been requested or is plannsd, in number of fuel assemblies:
t The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
l 9.
The projected date of the last refueling that can be discharged to the spent fuel present capacity:
September 2002 without full core offload capability.
September 1998 with full core offload capability.
i
i Dockit No. 50-278 Attachment to Monthly Operating Report for January 1995 UNIT 3 REFUELING INFORMATION t
1.
Name of facility:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdown:
Reload 10 scheduled for September 11,1995 3.
Scheduled date for restart following refueling Restart following refueling scheduled for November 13,1995 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes If answer is yes, what, in general, will these be?
93-12 Power Uprate 93 18 SRM/lRM improvements 94 08 TIP System Enhancements
(
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
93-12 Submitted 6/23/93 93-18 Submitted 1/17/95 9448 Submitted 1/13/95 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A 1
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
)
, (a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2201 Fuel Assemblies,6 Fuel Rods i
~
Docket No. 50-278 Attachment to Monthly Operating Report for January 1995 Page 2 UNIT 3 REFUELING INFORMATION (Continued) 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capac2y that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2003 without full core offload capability.
September 1997 with fu!I core offload capability.
1 e
i P
6 m
.-~m
l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE FEBRUARY 13,1995-COMPANY PECO ENERGY COMPANY W. J. JEFFREY l
PERFORINueCE AND RELIABILITY SITE ENGINEERING 1
PEACM BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027
)
I MONTH JANUARY 1995 l
I DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET)
I 1
1126 17 1123 4
2 1130 18 1131 I
I 3
1130 19 1119 4
1126 20 1131 1
5 1126 21 1119 i
i 6
1130 22 1127 l
7 1082 23 1126 i
8 1127 24 1115 l
9 1131 25 1127 i
1 10 1131 26 1126 1
11 1131 27 1121 i
12 1050 28 1131 13 1131 29 1127 14 1127 30 1127 t
15 1131 31 1132 16 1136 i
l
?
I h
?
I F
)
y we
-r q
w
... ~..
l i
l r
AVERAGE DA!LY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE FEBRUARY 13,1995 COMPANY PECO ENERGY COMPANY j
W. J. JEFFREY l
PERFORMANCE AND RELIABILITY
$1TE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION j
TELEPHONE (717) 456-7014 EXT, 4027 I
MONTH JANUARY 1995 i
i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE NET)
(MWE NET) 1 1068 17 1055 2
1064 18 1063 i
3 1068 19 1059 J
4 1064 20 1055 l
5 1068 21 575 6
1064 22 1019 7
1064 23 1061 l
8 1068 24 1041 9
1064 25 1054 10 1068 26 1059 i
11 1064 27 1060 12 1068 28 1056 13 1063 29 1060 14 1064 30 1060 1
15 1067 31 1060 16 1072
k L
DPERATING DATA REPORT DOCKET NO. 50 - 277 DATE FEBRUARY 13,1995 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY
$1TE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 4027 DPERATING STATUS l
- 1. UNIT NAME: PEACH BOTTOM UNIT 2 NOTES:
- 2. REPORTING PERIOD: J ANUARY, 1995
- 3. LICENSED THERMAL POWER (MWT):
3458 I
- 4. NAMEPLATE RATING (GROS $ MWE):
1221
- 5. DESIGN ELECTRICAL RATING (NET MWE):
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
093
- 8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
THE NEW RERATED VALUE FOR ITEM #5 HAS NOT YET BEEN DETERM!NED.
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR-TO DATE CUMULATIVE I
- 11. HOURS IN REPORTING PERIOD 744 744 180,384
- 12. KUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 114,707.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE 744.0 744.0 110,747.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS !HERMAL ENERGY GENERATED (MWM) 2,562,593 2,562,593 330,883,476
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 856,200 856,200 108,735,590
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 835,865 835,865 104,278,321 PAGE 1 0F 2 i
I r
I r
y 4
I OPERATlWG DATA REPORT (CONTINUED)
DOCKET No. 50 277 DATE FEBRUARY 13,1995 THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 100.0 61.4
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 61.4 r
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 102.8 102.8 52.9 l
- 22. UNIT CAPACITY FACTOR (USING DER NET) 1 05.5 105.5 54.3
- 23. UNIT FORCED DUTAGE RATE 0.0 0.0 13.0
- 24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
j
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERAfl0N):
FORECAST ACHIEVED l
INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 i
COMMERCIAL OPERATION 07/05/74 4
I f
i PAGE 2 0F 2 r
I
E. -
I i
j l
I OPERATING DATA REPORT DOCKET No. 50 - 278
)
DATE FEBRUARY 13,1995 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY I
$1TE ENGINEERING j
PEACH BOTTOM ATOMIC POWER STAfl0N i
TELEPHONE (717) 456 7014 EXT. 4027 I
I OPERATING STATUS
}
- 1. UNIT NAME: PEACH BOTTOM UNIT 3 NOTES:
{
- 2. REPORTING PERIOD:
JANUARY, 1995
- 3. LICENSED THERMAL POWER (MWT):
3293
- 4. NAMEPLATE RATING (GROSS MWE):
1152
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1065
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098 l l
l
- 7. KAXIMUM DEPENDABLE CAPACITY (NET MWE): 1035 l j
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (!TEMS NUMBER 3 THROUGH 7) $1NCE LAST REPORT, GIVE REASON $:
- 9. POWER LEVEL To WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
1 THIS MONTH YR-To-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 744 176,280
- 12. NUMBER OF HOURS REACTOR WAS CRIT!tAL 744.0 744.0 114,003.4
[
i
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
[
- 14. HOURS CENERATOR DN LINE 744.0 744.0 110,623.2
-l
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
?
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,412,888 2,412,888 328,986,831
- 17. GROSS ELECTRICAL ENERGY GEhERATED (MWH) 798,200 798,200 107,944,232
- 18. NET ELECTRICAL EhERGY GEWERATED (MWH) 777,483 777,483 103,618,B42
(
l t
PAGE 1 0F 2 a
i a
_. =. - -
f OPERATING DATA REPORT (CONTINUED)
DOCKET NO. 50 - 278 h
l DATE FEBRUARY 13,1995 THIS MONTH YR-TO-DATE CUMULATIVE f
i
- 19. UNIT SERVICE FACTOR 100.0 100.0 62.8
- 20. UNIT AVAILABILITY FACTOR.
100.0 100.0 62.8 t
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.0 101.0 56.8 l
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.1 98.1 55.2
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 11.5
- 24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACM):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 11/14/95 i
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 1
COMMERCIAL OPERATICN 12/23/74 j
l PAGE 2 0F 2 1
a
.e n
- ~
-n
,n
I f
UNIT SHUTDOWNS AND POWER REDUCT!DNS DOCKET NO. 50 277 UNIT NAME PEACH BOTTOM UNIT 2 DATE FEBRUARY 13,1995 REPORT MONTH JANUART, 1995 COMPLETED BY PECO ENERGY COMPANY
[
W. J. JEFFREY I
PERFORMANCE AND RELIABILITY i
SITE ENGINEERING I
PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO No.
DATE (1)
(HOURS)
(2) ;
REACTOR (3)
REPORT #
(4 PREVENT RECURRENCE
...................................................................).......(5) 1 950107 5
7.0 N
4 RC CONROD ROD PATTERN ADJUSTMENT. REACTOR NOT SHUTDOWN 3
950112 F
7.0 8
4 HB VALVEX REPAIR A0-86A LEAK. REACTOR NOT SHUTOOWN l
3 950119 F
212.0 H
4 CG DEMINX RWCU SYSTEM IN DUMP MODE. REACTOR NOT SHUTDOWN I
1 226.0 i
1 l
c (1)
(2)
(3)
(4)
F FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLA!N)
FILE (NUREG-0161) j E OPERATOR TRA!NING + LICENSE EXAMINATION F ADMINISTRATIVE i
(5)
G OPERATIONAL ERROR (EXPLAIN)
H OTHER(EXPLAIN)
EXHIBli ! - SAME SOURCE l
l i
.m
+v v
1 l
.=,
1 i
I i
i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50 - 278
{
UNIT NAME PEACH BOTTOM UNIT 3 DATE FEBRUARY 13,1995 REPORT MONTH JANUARY,1995 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY
$1TE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 4027 i
METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE I
TTPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO I
NO.
DATE (1)
(HOURS).
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURREN
..............................................,................................................CE 1
950120 F
31.0 N
4 HF PUMPXX CIRC WATER PUMP REMOVED FROM SERVICE. REACTOR NOT SHUTDOWN 31.0 (1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBli G INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B MAINTENANCE OR TEST 2 MANUAL SCRAM.
ENTRY SHEETS FOR LICENS!!
C - REFUELING 3 AUTOMATIC SCRAM.
EVENT REPORT (LER)
D REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161) l E - OPERATOR TRAINING + LICENSE EXAMINAT!DN F - ACMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE 1
l l
i
-.