Southem Nucktar Opsrating Company Post Offica Box 1295 Bsrman0 ham Altbama35201 Telephone (205) 868-5131 Southem Nudear Operating Company
- n. e umer Vice President Farley Project the Southem electnC System l
!i l
February 10, 1995 i
Docket Nos.
50-348 50-364 I
r U. S. Nuclear Regulatory Commission
[
A'ITN: Document Control Desk l
Washington, D.C. 20555 l
s Joseph M. Farley Nuclear Plant l
Monthly Operating Data Report l
l Gentlemen:
i Attached are the January 1995 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.
[
If you have any questions, please adsisc.
}
Respectfully submitted, I
(fl ) W '
Dave Morey RWC:jgp(mor)
Attachments I
f cc:
Mr. S. D. Ebneter Mr. B. L. Siegel Mr. T. M. Ross
'700. 1 i
J 9502170269 950131 gi DR ADOCK 0500 8
/ q
>,e--
--+
w
p Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations January 1995 At 0935 on January 7,1995, with the Unit in mode I and operating at 100 percent reactor power, a ramp to 80 percent reactor power was commenced. The unit was ramped down to perform maintenance on the 1C condensate pump.
The unit was returned to 100 percent reactor power at 2105 on January 7,1995.
At 0758, on January 13,1995, with the unit in mode 1 operating at 100 percent reactor power, the reactor tripped due to a turbine trip in response to a loss of digital electro-hydraulic control (DEllC) overspeed protection. An evaluation of the DEllC system design indicated a vulnerability of the DEHC system to minor voltage transients. Modifications were performed to the DEHC system in ord:r to reduce the vulnerability to minor voltage transients.
The unit was retumed to power operation at 2203 on January 17,1995.
The following major safety-related maintenance was performed during the month:
Modifications were performed to the DEllC system in order to reduce the i
vulnerability of the DEliC system to minor voltage transients.
j i
l l
L l
1
OPERATING DATA REPORT DOCKET NO.
50-348 DATE February 8,1995 COMPLETED BY R. D.11i11 TELEPilONE (334) 899-5156 OPERATINGETATUS 1.
Unit Name:
Joseph M. Farley - Unit 1 Notes 2.
Reporting Period:
January 1995
- 1) Cumulative data sincel2-01-77, 3.
Licensed Thermal Power (MWt)-
7,652 date of commercial operation.
4.
Nameplate Rating (Gross MWe):
860 5.
Design Electrical Rating (Net MWe):
829 6.
Maximum Dependable Capacity (Gross MWe):
855.7 7.
Maximum Dependable Capacity (Net MWe):
812 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A l
9.
Power Level To Which Restricted,if Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
N/A
]
This Month Yr.to Date Cumulative
- 11. Ilours in Reporting Period 744.0 744.0 150,504.0
- 12. Number OfIlours Reactor Was Critical 653.7 653.7 119,910.5
- 13. Reactor Reserve Shutdown llours 0.0 0.0 3,650.0
- 14. Ilours Generator On-line 633.9 633.9 118,087.8
- 15. Unit Reserve Shutdown llours 0.0 0.0 0.0
- 16. Gross Thennal Energy Generated (MWil) 1,668,639.2 1,668,639.2 303,804,356.2
- 17. Gross Electrical Energy Generated (MWil) 548,987.0 548,987.0 97,962,692.0
- 18. Net Electrical Energy Generated (MWil) 517,455.0 517,455.0 92,517,444,0
- 19. Unit Service Factor 85.2 85.2 78 1
- 20. Unit Availabilty Factor 85.2 85.2 78.5
- 21. Unit Capacity Factor (Using MDC Net) 85.7 85.7 75.5
- 22. Unit Capacity Factor (Using DER Net) 83.9 83.9 74.2
- 23. Unit Forced Outage Rate 14.8 14.8 6.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
4 N/A
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior To Commercial Operation):
Forceast Achieved initial Criticality 08/06/77 08/09/77 Initial EIcetricity 08/20/77 08/18/77 Commercial Operation 12/01/77 12/01/77
DOCKET NO.
50-348 UNIT 1
DATE February 8,1995 1
COMPLETED BY R. D. Ilill TELEPIIONE (334) 899-5156 l
MONTil Januag i
i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 830 17 0
i 1
2 834 18 715 j
19 829 3
835 4
835 20 831 5
835 21 832 6
829 22 833 7
771 23 833 8
833 24 834 9
829 25 834 10 827 26 833 824 27 832 11 12 826 28 828 13 251 29 833 14 0
30 833 15 0
31 833 16 0
4 INSTRUCTIONS On this fbrmat, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-348 UNIT NAME J. M. Farley - Unit 1 DATE February 8,1995 COMPLETED BY R. D. Ilill REPORT MONTil January TELEPilONE (334)899-5156
=
METilOD OF LICENSEE CAllSE ANDCORRfCTIVE g
DURATION StilTITING EVENT SYSTEM COMPONENT ACTION TO h
} NO.
DATE TYPE 11) llOI RS REASON (2ht_)OWN REACTOR (3), REPORTS CODE {4)
CODE (5)
PREVtMT RFCURRENCI'
_ __ _ h "0Ti2'950113 F
110.08 l'1 3
93-~001 -00' JJ 77777 At 0758, on January 13,1995, with the unit in mode 1
~
. operating at 100 percent power, the reactor tripped due to a j
l turbine trip in response to a loss of digital electro-hydraulic
]
' control (DEIIC) overspeed protection. An evaluation of the
]
DEllC system design indicated a vulnerability of the DEllC 1
system to minor voltage transients. Modifications were J
! performed to the DEllC system in order to reduce the i
suinerability of the DEllC system to minor voltage transients. g e
The unit was returned to power operation at 2203 on January 17,1995.
1 u
___2 1:
2:
3-4:
5:
F: Forced Reason Method Exhioit G-Instructicas for I xhibit 1 - same Source S: Scheduled A - Equipment f ailure (Explain) 1 - Manual Preparations of Date Entry B - Mamtenance or Test 2 - Manual Scrarn Sheets for Licensee Esent C - Refucimg 3 - Automatic Scram Report (LER) File (NURfG-016I)
D - Regulatory Restricten 4 - Other (Explam)
E - Operator Training & License Examination F-Administratisc
, G - Operatioral Error (Explam)
Ii - Other (Explain)
-e
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-348 UNIT NAN 1E J. A1. Earley - Unit i DATE February 8,1995 COh1FLETED BY R. D. Ilill REPORT h10NTil January TELEPHONE (334) 899-5156
]
MElllOD OF LICENSEE CAUSE AND CORRECllVE DURATION SilUTIING EVENT SYSTEM COMPONENT ACTION TO h
NO _ DATE TYPE (1)i ilOURS REASON p) DOWN REACTOR Q)
REIORT #
CODE (4)
CODE _(5) l PREVFhT RFCURRENCE 001 950107 S
0 B
4
" N/A SD P
At 0935 on January 7,1995, with the Unit in mode I and l
operating at 100 percent reactor power, a ramp to 80 percent reactor power was commenced. The unit was h
ramped down to perform maintenance on the IC ll condensate pump.
N O
i The unit was returned to 100 percent reactor power at 2103 on January 7,1995.
g h
il l1 4
a l
1 1
lb I:
2:
3-4.
5 F: Forced Reason Method Eshibit G-Instructions for Exhibit 1 - Sune Source 3: Scheduled A - Equipment Failure (Esplam) 1 - Manual Preparations of Date Entry II - Maintenance or Test 2 - Manual Scram Sheets for Licensee Esent C - Refueling 3 - Automatic Scram Repon iLER) File (NUREG416I)
D-Regulatory Restncuon 4 - Other (Esplam)
E -Operator Training & License Examination F-Administrative
, G -Operational Frror (Esplain) 11 -Other tExplain) s
4 Joseph M. Farley Nuclear Plant Unit 2 l
Narrative Summary of Operations January 1995 At 2100, on January 27,1995, with Unit 2 in mode 1 operating at 100 percent reactor power, a ramp to mode 3 commenced. An evaluation of the digital electro-hydraulic (DEllC) system design had indicated a vulnerability of the DEllC system to minor voltage transients. The unit was manually shut down to perform modifications to the DEllC system in order to reduce the vulnerability of the DEllC system to minor voltage transients.
The unit was returned to power operation at 2132 on January 31,1995.
The following major safety-related maintenance was performed during the month:
j Modifications were performed to the DElIC system in order to reduce the vulnerability of the DEIIC system to minor voltage transients.
]
l
OPERATING DATA REPORT DOCKET NO.
50-364 DATE February _8,1995 COMPLETED BY R. D. Hill TELEPHONE (334) 899-5156 OPERATING STATUS
~
1.
Unit Name:
Joseph M. Farley - Unit 2 3.
Licensed Thermal Power (MWt)-
January 1995_
Notes 2.
Reporting Period:
- 1) Cumulative data since 07-30-81,
'652 date of commercial operation.
4.
Nameplate Rating (Gross MWe):
860 5.
Design Electrical Rating (Net MWe):
829 6.
Maximum Dependable Capacity (Gross MWe):
863.6 7.
Maximum Dependable Capacity (Net MWe):
822 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
N/A i
This Month Yr.to Date Cumulative
- 11. Ilours in Reporting Period 744.0 744.0 118,417.0
- 12. Number OfIlours Reactor Was Critical 666.4 666.4 102,324.1
- 13. Reactor Reserve Shutdown Ilours 0.0 0.0 138.0
- 14. Ilours Generator On-line 654.8 654.8 100.877.4 0.0 0.0 0.0 j
- 15. Unit Reserve Shutdown llours 1,728,025.4 _
1,728,025.4 258,067,731.1
- 16. Gross Thennal Energy Generated (MWII)
- 17. Gross Electrical Energy Generated (MWil) 571,692.0 571,692.0 84,626.234.0
- 18. Net Electrical Energy Generated (MWil) 542.634.0 542,634.0 80,264,932.0
- 19. Unit Service Factor 88.0 88.0 85.2
]
- 20. Unit Availabilty Factor 88.0 88.0 85.2
- 21. Unit Capacity Factor (Using MDC Net) 88.7 88.7 82.7
- 22. Unit Capacity Factor (Using DER Net) 88.0 88.0 81.8 12.0 12.0 4.0
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Rdueling/ Maintenance outage, March 10,1995. Approximately 39 days.
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved initial Criticality 05/06/81 05/08/81 05/25/81 05/24/81 Initial Electricity 08/01/81 07/30/81 Commercial Operation
_=. -.
DOCKET NO.
50-364 UNIT 2
DATE February 8,1995
~
COMPLETED BY R. D.11111 TELEPHONE (334) 899-5156 MONTli January DAY. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
)
(MWe-Net)
(MWe-Net)
I 838 17 840 2
842 18 837 3
843 19 837 4
844 20 842 5
836 21 841 6
839 22 843 1
7 843 23 842
-i 8
841 24 843 9
837 25 842 10 835 26 842 11 835 27 827 12 833 28 28 13 833 29 0
14 838 30 0
15 838 31 0
16 839 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net Ihr each day in the reponing period. Compute to the nearest whole megewatt.
-+--+t
'8-M-9" w-e
-r
-.=-e-dN
-m*
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-364 UNIT NAME J. M. Farley - Unit 2 4
DATE Febmary 8,1995 j
COMPLETED BY R. D. Ilill REPORT MONTil January TELEPilONE (334) 899-5156 METilOD OF LICENSEE CAUSE AND CORRECTIVE DURATION SIIUTTING EVENT SYSTEM COMPONENT ACTION TO NO.
DATE TYPE (1)'
HOURS REASON (2) DOWN REACTOR (3)
REPORT #
CODE (4)
CODE (5)
PREVENT RECURRENCE 001 950127 S
89.2 B
1 N/A JJ Z77777 At 2100, on January 27,1995, with Unit 2 in mode 1 operating at 100 percent power, a ramp to mode 3 was 1
commenced. An evaluation of the digital electro-hydraulie (DEIIC) system design had indicated a vulnerability of the DEllC system to minor voltage transients. The unit was manually shut down to perform modifications to the DEllC l
system in order to reduce the vulnerability of the DEllC system to minor voltage transients.
The unit was returned to power operation at 2132 on January 31,1995.
l
. I:
2:
3:
4:
5:
F: Forced Reason Method Exhibit G-Instructions for Eshibit I - Same Source S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations of Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Esent C - Refueling 3 - Automatic Scram Report (LER) File (NUREG4161)
D - Regulatory Restriction 4 -(kher (Explain)
E - Operator Training & License Examination F-Administratisc
., G-Operational Error (Explain)
II-Other (Explain)
I
-