ML20078P693

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures PEP-02.4 Re Emergency Control - Site Emergency & PEP-03.5.3 Re Plume Tracking by Actual Measurement
ML20078P693
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/03/1983
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20078P684 List:
References
LAP-83-203, NUDOCS 8311080193
Download: ML20078P693 (2)


Text

._.a SERIAL: LAP-83-203 Carolina Power & Light Company JUN 031993 Mr. James P. O' Reilly, Regional Mainistrator United States Nuclear Regulatory Commission Regica 11 101 ?tarietta Street, N.U., Suite 3100 Atlanta, CA 30303 BRUNSWICK STEAtt ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 A'ID 50-324 LICENSE NOS. DPR-71 AND DPR-62 EMERGENCY PLAN' LING

Dear Mr. O'Reilly:

In accordance with 10CFR50, Appendix E, Carolina Power & Light Company (CP&L) hereby transmits one copy of recent revisions to the Brunswick Steam Electric Plant Emergency Procedures.

A list of the revisions to the Plant Emergency Procedures is attached f or your use.

If you have any questions on this subject, please contact our staf f.

Yours very truly, em S.

L mmerman Manager Licensing & Permits WRM/ccc (695 5WRM)

Enclosures cc:

Mr. D. O. Myers (NRC-BSEP)

Mr. S. D. MacKay (NRC) y 1MtVUt contra 2 ueYk ( C gies) 7 O U. S. Nuclear Regulatory Commission Washington, DC 20555 8311080193 831103

{DRADOCK 05000324 PDR

/

N 4sO 411 Faye".eville Street P. O. Box 155:

  • Aaieign, N. C. 27602 f$/

=

= =:...

-m w

_~

~ -

.4 i

i i

CAROLINA POWER & LIGHT COMPANY BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 I

l i

l REVISED PLANT EMERGENCY PROCEDURES i

SECTION NUMBER TITLE REVISION NUMBER 1.0*

Plant Emergency Procedures Introduction 5

2.2*

Emergency Control - Unusual Event 4

2.3*

Emergency Control - Alert 4

2.5*

Esergency Control - General Emergency 4

3.4.1*

Initial Dose Projections 4

3.4.2*

Whole Body Dose Projections 4

3.4.3*

Thyroid Dose Projections 4

3.4.5*

Automation of Dose Projection Procedures 2

Using the HP-9830A Tabletop Computer 3.4.7 Automation of Dose Projection Procedure 0

i Using the IBM Personal Computer i

3.5.1*

Confirmation of Initial of f-site Dose 3

l Projections 3.5.3 Plume Tracking By Actual Measurement 2

I 3.6.1*

Release Estimates Based Upon Stack / Vent 2

Readings 3.7.1*

Radiation Work Permits and Exposure Control 3

1 3.7.2*

Emergency Personnel ibnitoring and Dosimetry 3

App. A*

Emergency Response Resources 7

I l

  • Partial instructions or nodification.

l

. -. -.. -. - -. -