Containment Purge Sys Interim Operation Plan
ML20078P069
Person / Time
Site: Byron  Constellation icon.png
Issue date: 10/27/1983
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20078P057 List:
References
7510N, PROC-831027-02, NUDOCS 8311030186
Download: ML20078P069 (2)


Text

.

4 ATTACHMENT C CONTAINMENT PURGE SYSTEM INTERIM OPERATION PLAN 71 l

i l-l-

l l

l October 27, 1983 l-

-7510N-l 8311030186 831027

~ ~ ~

PDR ADOCK 05000454 A

PDR

f v

]

jIIIb Primary Containment Purge System The Primary Containment Purge System'is subdivided into three

- non-safety-related subsystems, (1) miniflow purge, (2) normal purge and-(3) post-LOCA purge.

These~subsysters serve the containment (1) during normal plant operating conditio.'s. (2)-during planned

- reactor' shutdowns, and (3) during post-LOCA operating conditions, p

respectively..

-A_ separate purge system is provided for each unit.

A complete system description is provided-in Section19.4.9 of the Byron /Braidwood FSAR.,Preoperational test requirements are

~

provided in-FSAR' Table 14.2-39.

These requirements call'for the

. Purge System to be operational and tested prior to Unit 1 Fuel' Load.

~

During Fuel Loa'd and during low power startup' testing the. fission L

product inventory in the. reactor core 11s trivial by comparison with the inventories. employed by the FSAR safety. analyses.

There will-

~

be no significant release of-radioactivity resulting from either normal operation,1 from. a loss-of-coolant-accident or from a core unloading event.. As a result, there is no need-for the Purge

' System-to be operational during this perico.

Only containment

- isolation needs to be verified prior to core loadEto contain the small amounts ~ of radioactivity which may be released,

Consequently the startup and. testing plan for the Unit 1 Primary Containment Purge: System has been changed.to the following:'

l.

Prior to Unit 1 Fuel Load:

All Unit 1 containment purge isolation valves will be leak tested.

c

. 2.

Prior-to Unit 1-Operation above 5% power:

p i

.a)

The"42" containment purge valves will not be opened during oepration.

If any of the other purge isolation valves need to'be" opened:

1)-'the automatic actuation circuitry testing will be

_ complete.

2)

.the structural integrity of the purge duct will be

-verified to assure that there are no unmonitored leak

paths.

.b.

'The entire purge system will be operational, balanced, and preoperationally tested prior to operation above approximately 5% power.

L, This-startup plan will allow low power testing to be performed without causing.any unacceptable levels of risk to the public s<

health and safety.