At.tachment I to CO 94-0039 Page 1 of 1
)
PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
- b. At least once per 31 days by:
- 1) Verifying that each non-automatic valve in the flow path that is not locked, sealed or otherwise secured in position is in its correct position; and
- 2) Verifying that each automatic valve in the flow path is in the fully open position whenever the Auxiliary Feedwater System is placed in automatic control or when above 10% RATED THERMAL POWER
- c. At least once per 18 month during4Ntdown ay:
- 1) Verifying that each automatic valve in the ESW supply to the auxiliary feedwater pumps actuates to its full open position upon receipt of an Auxiliary Feedwater Pump Suction Pressure-Low test signal,
- 2) Verifying that each auxiliary feedwater pump starts as designed automaticall on recelot F
ar
~
test siana
-or e steam turbine-driven ruxiliary feedwater pump, the provisions of Specification 4.0.4 are not applicable m
for entr*/ Into MODE 3, and v
- 3) Venfying that each auxiliary feedwater motor-operated discharge valve limits the flow to each steam generator from the motor-driven pump to less than or equal to 320 gpm.
4.7.1.2.2 An auxiliary feedwater flow path shall be demonstrated OPERABLE following each COLD SHUTDOWN of greater than 30 days prior to entering MODE 2 by verifying normal flow to at least two steam generators from one auxiliary feedwater pump.
t WOLF CREEK - UNIT 1 3/4 7-5 Amendment No. 77 9412050196 941202 PDR ADOCK 05000482 P