ML20078M875

From kanterella
Jump to navigation Jump to search
Forwards Response from South Carolina Dept of Health & Environ Control,Approving Revs to Groundwater Monitoring Program Around Conventional Treatment Ponds
ML20078M875
Person / Time
Site: Catawba  
Issue date: 11/10/1994
From: Estridge J
DUKE POWER CO.
To: Harris J, Peed C, James Reece
NRC
References
CN-702.05, NUDOCS 9412050184
Download: ML20078M875 (2)


Text

--

.4 e

d November 10,1994 C.T. Peed J.T. Harris J.E. Reece A.P. Jackson CNS NRC Document Distribution List

Subject:

Catawba Nuclear Station - Response From SCDHEC NPDES Groundwater Monitoring Plan for WC File:

CN-702.05 Attached please find the response from the South Carolina Department of Health and Environmental Control to our letter dated August 16,1994. This letter approves the revisions to the groundwater monitoring program around the conventional treatment ponds. The most significant change is to increase the timeframe between sample collection and reporting from 60 to 90 days. The original timeframe of 60 days was difficult to meet due to analytic:J and data review timeframes.

Should there be any questions with respect to this letter or the groundwater monitoring program please feel free to give me a call at 875-5965.

Sincerely, 1 QL ohn Estridge, Engmeer Environmental Division, Water Protection t

jte/386 l

cc:

M.A. Lascara 1

J J.S. Carter A.P. Jackson R. A. Santini R.W. Caccia W.J. Davis r

l' Q 0, L

n n..

,l' 9412050184 941110 PDR ADOCK 05000413 P

PDR

m m

u..

4 South Carolina commissioner: Dougtsa E.Brytnt Board: Richard E. Jabbour, DDS, Chairman John H. Burriss Robert J. Stripling, Jr., Vice Chairman William M. Hull, Jr., MD Departmere of Health and Environmental Control Burnet R. Maybank, lil 2f>00 Bull Street, Columbia, SC 29201 Promoting Health, Protecting the Environment ENVRONMENTALPROTECTION SECTION November 7, 1994 NOV 9 1994 Mr. John S.

Carter, Technical System Manager O FILE Duke Power Environmental Division O TICKLER DATE 1339 Hagers Ferry Road Huntersville, North Carolina 28078 Re:

Duke Power, Catawba Nuclear Station Groundwater Monitoring Program Modifications York County 0 ROUTE

Dear Mr. Carter:

The referenced modifications are approved by the Geohydrologic Section. The timeframe between sample collection and reporting the data is approved from 60 to 90 days.

The sampling frequency is to be on a semi-annual schedule.

Thank you for your cooperation in this matter.

If I can be of any additional assistance, please feel free to contact me at (803) 734-4897.

Best Wishes, kM\\,

Jim Ellis, Hydrologist Geohydrologic Section Bureau of Water Pollution Control cc:

Robin Foy Alex Amos Stacey Lomas Tim Eleazer Ms. Cheryl T.

Peed JE/jh O

e< > cupape,

,