Requests Approval to Perform Short Duration Integrated Leak Rate Test (Type A).Test Would Meet Criteria of Bechtel Topical Rept NB-TOP-1,Tech Specs,10CFR50,App J & ANSI Std N45.4-1972.Approval Requested by 840101
ML20078M150
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 10/20/1983
From: Howe P
CAROLINA POWER & LIGHT CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
References
LAP-83-452, NUDOCS 8310250036
Download: ML20078M150 (2)


Text

} uo Cp&L Carolina Power & Ught Company SERIAL: LAP-83-452 OCT 2 01983 Director of Nuclear Reactor Regulation Attention:

Mr. D. B. Vassallo, Chief Operating Reactore Branch No. 2 Division of Licensing United States Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 INTEGRATED LEAK RATE TEST

Dear Mr. Vassallo:

Carolina Power & Light Company (CP&L) hereby requests NRC approval to perform a short duration integrated leakage rate test (Type A) at the Brunswick Steam Electric Plant Units No. 1 and 2 (BSEP No. 1 and 2).

The short duration test will be performed to meet the test duration criteria contained in Section 2.0 of the Bechtel Topical Report NB-TOP-1, revi.wion 1, dated November 1, 1972, " Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Power Plants". The test will also be in conformance with BSEP Unit No. 1 and 2 Technical Specifications, 10 CPR 50 Appendix J and ANSI N45.4-1972, " Leakage-Rate Testing of Containment Structures for Nuclear Reactors."

In addition to meeting the above criteria, the mass point technique will also be used to calculate ths leakage rate. This technique is recommended in ANSI N56.8-1981, " Containment System Leatrage Testing Requirements" for short duration leak. rate tests. The neasured overall integrated containment leakage rate, defined in the BSEP Technical Specifications and required by 10 CFR 50, Appendix J, vill be used as the acceptance criteria.

CP&t, understands that the Bechtel Topical Report has been approved by the NRC. Changes to the BSEP Technical Specifications will not be required to perform a short duration integrated leakage rate test (Type A).

In order to facilitate scheduling for the March 1984 BSEP No. 2 outage, CP&L requests NRC approval of this request by January 1, 1984.

8310250036 831020 DR ADOCK 05000324 PDR P

.4,,,.... s,...... m e _,ss,..,. _c _

i e mm

Mr. D. B. Vassallo Should you have any questions regarding this issue, please contact a member of our Licensing Staff.

Yours very trul,

P. W. Howe Vice President Brunswick Nuclear Project PPC/tda (8029PPC) cc:

Mr. D. O. Myers (NRC-BSEP)

Mr. J. P. O'Reilly (NRC-RII)

Mr. S. D. MacKay (NRC)

,.