OPERATING DATA REPORT 50-364 DOCKET NO.
DATE 9-1-83 COMPLETED BY W.G. Hairston, III TELEPHONE (?nsi R99-5156 OPERATING STATUS otes
- 1. Unit Name: _.Tosenh M.
Farlev - linie 7
- 2. Reporting Penod: August. 1983
- 1) Cumulative data since 2652 7/30/81, date of
- 3. Licensed Thermal Power (MWt):
860
- 4. Nameplate Rating (Gross MWe):
commercial operation.
829
- 5. Desagn Electrical Rating (Net MWe):
854.7
- 6. Maximum Dependable Capacity (Gross MWe):
813.7
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Numt er 3 Throesh 7) Since Last Report. Give Reasons:
N/A
'N/A
- 9. Power Level To Which Restricted,if An et MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr to.Date
'Cuniutative 744 5,831 18,312
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 744.0 5.A11.n 16,615.5 --
0.0 0.0 138.4
- 13. Reactor Reserve Shutdown Hours 744.0 5,831.0 16.411.4
- 14. Hours Generator On-Line 0.0 0.0 o,o
- 15. Unit Reserve Shatdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1,966,925 15.417.933 40,839,747
- 17. Gross Electrical Energy Generated (MWH) 606,464 4,865,032 13,538,266 576,210 4,627,998 12,844,048
- 18. Net Electrical Energy Generated (MWH)
'100 0 100.0 89.7
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor lonin 89.7
- 21. Unit Capacity Factor (Using MDC Net) 45 ?
97.5 86.2
- 22. Unit Capacity Factor iUsing DER Net) 93.4 95.7 84.6 0.0 0.0 5.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eacht:
Refueling outaget September 16. 1981-annrnv4mmu1 six voekm.
7 N/A 2S. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test StatusiPrior to Commercial Operationi:
Forecast Achieved 5/6/81 5/8/81 INITIAL CRITICALITY 5/24/81 5/25/81 INITIAL ELECTRICITY COMMERCIAL OPERATION R /1/R1 7/30/81 8310190071 830901 PDR ADOCK 05000364 R
PDR pu-i
, ' ~ ~ -
DOCXET NO.
50-364 2
9-1-83 4
COMPLETED 8Y W C Hairston. III (205) 899-5156 TELEPHONE August, 1983 Af0NTil DAY AVERAGE DAILY POWER LEVEL '
DAY
- AVERAGE DAILY POWER LEVEL (AlWe Net)
($1We-Net) 782 7RS 17 2
jg 779 785 3
781 39 37s 768 4
- 776 20 769 3
773 21 774 768 6
777 23 772 7
772 3
777 24 777 772 9
25-776 26 773 10 77l
((
774 27, 12
,3 768 773 I
13 760 29 770 775 771 14 30 781 3g 772 Ig 16 783 INSTRUCITONS On this form:t. fist the 2verige daily unit power Icvelin Mw*e Net for each d:y in the reporting month. Compute to
, the neare:r whole rnepwait.
(9(77) l
e-I DOCKETNO. 50-364 UNIT SilU1 DOWNS AND POWER REDUCTIONS IJNIT NAhlE J.M. Farley Unit,2,i.
DAIE 9-1-83,
COMPLETED BY W.G. liairston. III REPORT MON 1ll August. 1983 TEl.LPilONE _L205).899-5156 t
e*,
E E
,hg "g
[h Liccusec
,E *t, h4 Cause & Custective g
No s.
Dale g
3g 2s&
Event U
Q Action to H
fE 5
jigg Report
- g mO Prevent Recuricace 6
j TIIERE WERE NO UN LT S iUTDOWNS OR SIGNIFI :: ANT POWER R1 lDUCTIO iS IN Til: : MONTil 0F AUGUST.
i I
I 2
3 4
17: Irinted Reason:
Method:
Exhibit G. Insienction.
S: Sclieduled A l'iiuis. ment Failure (Explain) 1 Manual for Picparation or D se.
Il Maintenance of Test 2 Manual Scram.
Entry Slieces for I. iter. -
C.Refneling
- 3. Automatic Scram.
Etent Repost (l.ER)1 'I. INURI:G-l D Itegidatiny Restriction 4 Oslies (Explain) 0161) 1 E Operator Tealning A IJcense Examination l
F Administrative 5
G Opciational Essos (lixplain) lisinbie I-Same Sinn. -
I'l/ H) ll Ollies (Explain) 1
e w
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS AUGUST, 1983 During the month of August, there were no unit shutdowns or significant power reductions.
The following safety-related maintenance was performed in the month of August:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Replaced #6 river water pump.
3.
Overhauled #3 river water pump motor.
4.
Overhauled #7 river water pump.
5.
Cleaned out 2B charging pump lube oil cooler.
6.
Repaired 2B waste gas compressor unloader valve.
7.
Repaired control panel for post accident sampling system.
A*
- Malling Address Al!.bama Power Company 600 North 18th Street P;st Offic18ox 2641 Birmingham. Alabama 35291 Telephone 205 783-6081 b
F. L Clayton, Jr..
R O ' ; 2 ; g "'
AlabamaPbwer s
the southern ebctnc System September 12, 1983 Docket No. 50-364 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies,f the August, 1983 Monthly Operating Report for Joseph M.
f arley Nuclear Plant, Unit 2, requi red by Section 6.9.1.10 of the Unit 2 Technical Specifications.
As requested by letter f rom Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
j If you have any questions, please advise.