Monthly Operating Rept for Aug 1983
ML20078K372
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/01/1983
From: Clayton F, Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8310190071
Download: ML20078K372 (5)


Text

q Q

OPERATING DATA REPORT 50-364 DOCKET NO.

DATE 9-1-83 COMPLETED BY W.G. Hairston, III TELEPHONE (?nsi R99-5156 OPERATING STATUS otes

1. Unit Name: _.Tosenh M.

Farlev - linie 7

2. Reporting Penod: August. 1983
1) Cumulative data since 2652 7/30/81, date of
3. Licensed Thermal Power (MWt):

860

4. Nameplate Rating (Gross MWe):

commercial operation.

829

5. Desagn Electrical Rating (Net MWe):

854.7

6. Maximum Dependable Capacity (Gross MWe):

813.7

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Numt er 3 Throesh 7) Since Last Report. Give Reasons:

N/A

'N/A

9. Power Level To Which Restricted,if An et MWe):
10. Reasons For Restrictions.If Any:

This Month Yr to.Date

'Cuniutative 744 5,831 18,312

11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical 744.0 5.A11.n 16,615.5 --

0.0 0.0 138.4

13. Reactor Reserve Shutdown Hours 744.0 5,831.0 16.411.4
14. Hours Generator On-Line 0.0 0.0 o,o
15. Unit Reserve Shatdown Hours
16. Gross Thermal Energy Generated (MWH) 1,966,925 15.417.933 40,839,747
17. Gross Electrical Energy Generated (MWH) 606,464 4,865,032 13,538,266 576,210 4,627,998 12,844,048
18. Net Electrical Energy Generated (MWH)

'100 0 100.0 89.7

19. Unit Service Factor 100.0
20. Unit Availability Factor lonin 89.7
21. Unit Capacity Factor (Using MDC Net) 45 ?

97.5 86.2

22. Unit Capacity Factor iUsing DER Net) 93.4 95.7 84.6 0.0 0.0 5.1
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eacht:

Refueling outaget September 16. 1981-annrnv4mmu1 six voekm.

7 N/A 2S. If Shut Down At End Of Report Period. Estimated Date of Startup:

26. Units In Test StatusiPrior to Commercial Operationi:

Forecast Achieved 5/6/81 5/8/81 INITIAL CRITICALITY 5/24/81 5/25/81 INITIAL ELECTRICITY COMMERCIAL OPERATION R /1/R1 7/30/81 8310190071 830901 PDR ADOCK 05000364 R

PDR pu-i

, ' ~ ~ -

DOCXET NO.

50-364 2

UNIT DA"IT.

9-1-83 4

COMPLETED 8Y W C Hairston. III (205) 899-5156 TELEPHONE August, 1983 Af0NTil DAY AVERAGE DAILY POWER LEVEL '

DAY

  • AVERAGE DAILY POWER LEVEL (AlWe Net)

($1We-Net) 782 7RS 17 2

jg 779 785 3

781 39 37s 768 4

  • 776 20 769 3

773 21 774 768 6

777 23 772 7

772 3

777 24 777 772 9

25-776 26 773 10 77l

((

774 27, 12

,3 768 773 I

13 760 29 770 775 771 14 30 781 3g 772 Ig 16 783 INSTRUCITONS On this form:t. fist the 2verige daily unit power Icvelin Mw*e Net for each d:y in the reporting month. Compute to

, the neare:r whole rnepwait.

(9(77) l

e-I DOCKETNO. 50-364 UNIT SilU1 DOWNS AND POWER REDUCTIONS IJNIT NAhlE J.M. Farley Unit,2,i.

DAIE 9-1-83,

COMPLETED BY W.G. liairston. III REPORT MON 1ll August. 1983 TEl.LPilONE _L205).899-5156 t

e*,

E E

,hg "g

[h Liccusec

,E *t, h4 Cause & Custective g

No s.

Dale g

3g 2s&

Event U

Q Action to H

fE 5

jigg Report

  • g mO Prevent Recuricace 6

j TIIERE WERE NO UN LT S iUTDOWNS OR SIGNIFI :: ANT POWER R1 lDUCTIO iS IN Til: : MONTil 0F AUGUST.

i I

I 2

3 4

17: Irinted Reason:

Method:

Exhibit G. Insienction.

S: Sclieduled A l'iiuis. ment Failure (Explain) 1 Manual for Picparation or D se.

Il Maintenance of Test 2 Manual Scram.

Entry Slieces for I. iter. -

C.Refneling

3. Automatic Scram.

Etent Repost (l.ER)1 'I. INURI:G-l D Itegidatiny Restriction 4 Oslies (Explain) 0161) 1 E Operator Tealning A IJcense Examination l

F Administrative 5

G Opciational Essos (lixplain) lisinbie I-Same Sinn. -

I'l/ H) ll Ollies (Explain) 1

e w

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS AUGUST, 1983 During the month of August, there were no unit shutdowns or significant power reductions.

The following safety-related maintenance was performed in the month of August:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Replaced #6 river water pump.

3.

Overhauled #3 river water pump motor.

4.

Overhauled #7 river water pump.

5.

Cleaned out 2B charging pump lube oil cooler.

6.

Repaired 2B waste gas compressor unloader valve.

7.

Repaired control panel for post accident sampling system.

A*

  • Malling Address Al!.bama Power Company 600 North 18th Street P;st Offic18ox 2641 Birmingham. Alabama 35291 Telephone 205 783-6081 b

F. L Clayton, Jr..

R O ' ; 2 ; g "'

AlabamaPbwer s

the southern ebctnc System September 12, 1983 Docket No. 50-364 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies,f the August, 1983 Monthly Operating Report for Joseph M.

f arley Nuclear Plant, Unit 2, requi red by Section 6.9.1.10 of the Unit 2 Technical Specifications.

As requested by letter f rom Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

j If you have any questions, please advise.

l Yours very tr 1 F. L. Cl ayton, J r.

k FL CJ r/ KWM : na c 99hb Enclosures p.

xc:Ifr. Ted Cintula 3kW (1 copy) 9gs9 Director, IE (10 copies)

Director, RII (1 copy) g 31 ced

.