Monthly Operating Rept for Aug 1983
ML20078K323
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 09/01/1983
From: Kelly W, Thornberry R
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
DC0044, DC44, NUDOCS 8310190051
Download: ML20078K323 (5)


Text

- - _ _ . . . - . . - __ - _ _ _ - - -

1 MONTHLY NARRATIVE REPORT OF OPERATION AND MAJOR MAINTENANCE EXPERIENCE l

This report describes the operating and major maintenance experience for the month of August 1983. This narrative report was prepared by the plant staff and 4

is submitted in accordance with Section 6.9.1.10 of the plant Technical 3 Specifications.

There is no significant operating experience of major safety related maintenance to report.

No challenges to the PORV's or safety valves have been made. Furthermore, no

- changes have been made in the Offsite Dose Calculation Procedure, the Environmental Radiological Monitoring Procedure, or any radioactive waste

treatment systems.

i 4

t t

i i

l l

l

\

t 8310190051 830901

[ PDR ADOCK 05000 ,

i gd DC0044 3

. - --.. - _ . . _ _ . . . . . . . - . - , . - _ . . _ _ _ . - _ - - _ - . _ . . . . , - . _ , ~.-.-, ..

OPERATING DATA REPORT DOCKET N0. 50-275 DATE 09/01/83 *

COMPLETED BY W.J. Kelly TELEPHONE (805)S95-7351 l

4 OPERATING STATUS

1. Unit Name
Diablo Canyon Unit 1
2. Reporting Period: August 1983 Notes
3. Licensed Thermal Power (MWt): 166.9
4. Nameplate Rating (Gross MWe): 1170
5. Design Electrical Rating (Net MWe): 1084
6. Maximum Dependable Capacity (Gross MWe): 1134
7. Maximum Dependable Capacity (Net MWe): 1084
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe): 10. Reasons For Restrictions, If Any: Suspended Low Power Test License l This Month Yr-to-Date Cumulative
11. Hours In Reporting Period 0 0 0

)

12. Number Of Hours Reactor Was Critical 0 0 0
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 0 0 0 l 15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 0 0
17. Gross Electrical Energy Generated (MWH) 0 0 0 l
18. Net Electrical Energy Generated (MWH) 0 0 0
19. Unit Service Factor N/A
20. Unit Availability Factor N/A
21. Unit Capacity Factor (Using MDC Net) N/A ,
22. Unit Capacity Factor (Using DER Net) N/A
23. Unit Forced Outage Rate N/A
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End Of Report Per.iod, Est. Date of Startup: Sept., 1983 (fuel load) l
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved ,

INITIAL' CRITICALITY November 1983 INITIAL ELECTRICITY November 1983 COMMERCIAL OPERATION February 1984 l

l l DC0044 4

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-275 UNIT Diablo Canyon Unit 1 DATE 09/01/83 COMPLETED BY W.J. Kelly TELEPHONE (805)S95-7351 MONTH August 1983 DAY AVERAGE DAILY P0hER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 0 17 0 2 0 18 0 3 0 19 0 _

4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0, 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 _.

0 30 0 15 0 31 0 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

DC0044 5

l .

UNIT SHllTDOWNS AND POWER REDUCTIONS

! DOCKET NO. 50-275 UNIT NAPE DIA3LO CANYON UNIT DATE 09/L)1/85 C&PLETED BY W.J. KELLY

(805)57;-/351 TELEPHOE
REPORT N)NIli AUGUST 1983
Method of Licensee Cause & Corrective

! Duration Shutting Event System Component Action to

! No. Date Typel (Hours) Reason 2 Down Reactor Report # Code" Codes Prevent Recurrence t

810928 F 0 H 4 81-002/01T ZZ ZZZZZZ Halted fuel loading preparations j upon discovery of seismic j calculation errors. Reanalysis i and reviews are being conducted 4

in accordance with Commission's instructions.

i l

i a

I

1 2 3 4 i

F: Forced Reason: Method: Exhibit G - Instructions j S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data i B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee i C-Refueling 3-Automatic Scram. Event Report (LER) File

! D-Regulatory Restriction 4-Other (Explain) (NUREG-0161) i E-Operator Training & License Examination

{ F-Administrative 5 j G-Operational Error (Explain) Exhibit I - Same Source

! H-Other (Explain) i DC0044 6

l m o

PACIFIC GAS AND E LE C T RIC C O M PANY pgg  ; DIABLO CANYON POWER PLANT I RO. Box 56 Avila Beach, Ca!:fornia 93424 - (805) 595-7351 R.C. THORNBERRY PLANT MANAGER September 1, 1983 Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 RE: Docket No. 50-275 License No. DPR-76 Monthly Operating Report for August,1983 Gentlemen:

Enclosed are the completed monthly operating report forms for Diablo Canyon Unit 1 for August 1983. This report is submitted in accordance with Section 6.9.1.10 of our Technical Specifications.

Sincerely, r

R. C. THORNBERRY RCT:pim Enclosures cc Mr. J. B. Martin, Regional Aaministrator Region V - USNRC I I i

DC0044 1