ML20078K253

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Aug 1983
ML20078K253
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 09/15/1983
From: Grant N, Williams J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PNS-LI-83-611, NUDOCS 8310190023
Download: ML20078K253 (17)


Text

.

? ),

AVERAGE DAILY UhlT POWER LEVEL DOCKETNO. 50-250 UNIT Turkey Point _ Unit 3 DATE 9-15-83 COMPLETED BY 'N. W. Grant TELEPilONE (305) 552-3675' MONT}{ Angnet 10M ,

DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) . (MWe-Net )

665 665 37

, 669 663

- 18 3 19 665 4 663 660 20 666 5 21 659 6 666 22 662 7 667 661 23 664 8 24 604 9 665 25 579 10 667 661 26 Il 27 661 12 661 28 658 13 667 6 61 9

663 662 I4 30

.j 663 660

) 15 33 16 664 -

f 1

INSTRUCTIONS On this fonnat.hst the aserage daily unit power leselin MWe Nei for caeh day in the reporting inonth. Compute to the nearest whole megawait.

(9/77) 8310190023 830915 PDR ADOCK 05000250 R PDR

1

.. )

8 l

l

~

OPERATI G DATA REPORT DOCKET NO.

DATE b1R R3 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 OPERATING STATUS Turkey Point 3 Notes

1. Unit Name:
2. Reporting Period: August 1983 Unit #3 operated at 2200 essentially full power.
3. Licensed Thermal Power (MWt): '
4. Nameplate Rating (Gross MWe). 760
5. Design Electrical Rating (Net MWe): 693
6. Maximum Dependable Capacity (Gross MWe):

700

7. Maximum Dependable Capacity (Net MWe): 666
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr to-Date . Cumulative 94,136.6

11. Hours in Reporting Period i 744 5,831
12. Number Of Hours Reactor Was Critical 744.0 5,783.7 65,584.0
13. Reactor Reserve Shutdown Hours 0 +0 - -

8M.t

14. Hours Generator On.Line 744.0 5.699.0 65.204.1

. 15. Unit Reserve Shutdown Hours '

0 0 121.8

16. Gross Thermal Energy Generated (MWH) 1,631,788 12,498,513 133;916,425 .
17. Gross Electrical Energy Generated (MWH) 514,740 _, 4,050,665 42,712,655
18. Net Electrical Energy Generated (MWH) ,

489.983 3.860.011 .40.447.563 ,

19. Unit Senice Factor 100 97.7 69.3
20. Unit Availability Factor 100 97.7 69.4
21. Unit Capacity Factor (Using MDC Net) . 98.9 101.2 66.b '
22. Unit Capacity Factor (Using DER Net) 95.0 95.5 62.0
23. Unit forced Outage Rate 0 1.8 5.4
24. Shutdowns Scheduled Over Next 6 Months (T3 pe. Date,and Duration of Each): "

Danml inn ; netnhor 19R3 2 monthe

25. If Shut Down At End Of Report Period. Estimated Date of Startup: "

t 26. Units in Test Status (Prior to Commercial Operation): Forecast Achioc I ,

INITIA L CRITICA LITY INITIA L ELECTRICITY __

COMMERCI AL OPERATION W/77)

'n .

4 e.

DOCKET NO. 50-250 UNIT SifUTDOWNS AND POWER REDUCTIONS Turkey-Point 3 UNIT NAME DATE 7 83 -'

August 1983 COMPLETED BY P. Pace REPORT MONTil (305) 552-3654 TELEPHONE

. "i es iw= .

-o .=2 _e s , .E X Licensee c-r, -8"t g- Cause & Corrective N" . Date i 5= 4 .s s 5 Event 7 ag Action to

  • 5 U

$E jig Report a rN C Prevent Recurrence 6

No unit shutdowns or significant

> power reductions.

I 2 3 4 f: Forced Reason: Method: Exhibit G - Instructions S Sched uled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data Il-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refuelin$ 3-Automatic Scram. Event Report (LE R) File (NUREG-D Regulatory Restrietion 9 Other (Explain) 0161) 1: Operator Training & Ucense Examination

, F Administrative Y ~ O '"* "" 5 G-Opera tional I.r ror (l% plain ) s /.oao euc u<.v. .ct Exhibit I - Same Source (9/77) Il-Ot her ( E xplain )

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO, 50-250 P

, UNIT _ Turkey Point 3 DATE _ September 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH Auaust 1983 Unit 3 operated at essentially full power for the entire month.

Ma,ior safety related maintenance ac.tivities included:

A primary sample valve was replaced.

A boric acid transfer pump was repaired.

The charging pumps were overhauled.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

I d

M

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50_251 UNIT Turkey Point Unit 4 DATE 9-15-83

'- COMPLETED BY 'N. W. Grant TELEPilONE (305) . 552-3675' MONTH August 1983 .

DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) - (MWe-Net) i 662 37 2

665 ___

82 3 9 l 4 657 20 ___

5 668 21 105 6 494 22 584 i

7 23 666 8 - 24 669 9 -

25 668 to ---

26 670 11 27 670 12 23 597 13

--- 668 l 29 I4 30 l 15 33 667 .

--- e 16 i

I INSTRUCTIONS .

On t!iis fonnat. hst the average daily unit power leselin MWe Nei for each day in the reporting month. Compute to l

the nearest whole rxgawart.

i (9/77) f i

OPERATING DATA REPORT DOCKET NO. 50-251 DATE 9-_15-83 COMPLETED fly N. W. Grant TELEPHONE (305) 552-3675 OPERATING STATUS

1. Unit Name:

Turkey Point #4 - -

Notes Annuet 14R'1 Unit #4 operated at 2* Reporting Period.

2200 essentially full power except

3. Licensed 'I nennal Power (MWt): as noted in.the. Unit Shutdowns
4. Nameplate Rating (Gross MWe): 760 593 and Power' Reductions Report.'
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 700
7. Maximum Dependable Capacity (Net MWe): 666
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Sinew Last Report, Give' Reasons:
9. Power LevelTo Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,if Any:

1

' This Month Yr..to-Date . Cumulative 11 Hours in Reporting Period i '744 5,831 87,864

,, ' 12. Number Of Hours Reactor Was Critical

~

389.7 2,237 62,092.3 0 ' -0 ' 16666

13. Reactor Reserve Shutdown Hours *
14. Hours Generator On-Line 373.7 2,043.8 59,939.8
15. Unit Reserve Shutdown Hours 0 0 31.2
16. Gross Thennal Energy Generated (MWH) 786,125 4,281,256 126,199,500 .
17. Gross Electrical Energy Generated (MWH)- 249,769_, 1,353,149 40,128,661 232,928 1,2/4,966 38;UUU,139 18.: Net Electrical Energy Generated (MWH), '

68.2

19. Unit Senice Factor 50.2 35.1
20. Unit Availability Factor 50.2 35.1 68.3 21.' Unit Capacity Factor (Using MDC Net) . 47.0 33.4 66.9
22. Unit Capacity Factor (Using DER Net) 45.2 31.6 62.4
23. Unit Forced Outage Rate 6.1 7.4 4 . 0'
24. ' Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each): * '
25. If Shut Down At End Of Report Period. Estimated Date of Startup: "
26. Units In Test Status (Prior io Commercial Operation): Forecast Achiesed ,

INITIA L CRITICALITY INITIA L ELECTRICITY COMM ERCIAL OPERATION (9/77 )

. . - l .

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT N AME Turkey Point 4 DATE 9-15-83 COMPLETED BY P_ Pace REPORT MONTH Aunust. 1083 TELEPHONE (305) RE7 1654 e.

- E E

, .[ p 3 4.E 5 Licensee ,Eg . Cause & Corrective No. Date e--

33 ij js& Event 3' Ql" Action to H

fE E jgg Report = EU f' Prevent Recurrence 6

830803 F 19.0 A 3 CH PUMPXX Unit tripped following a trip of a

, condensate pump. The pump was re-paired and the unit returned to service.

830806 F 0 A 5 RB CONROD Power reduced due to a dropped rod.

830806 s 346.3 B 1 XX XXXXXX Unit removed from service for repairs of primary and secondhry systems.

830821 F 4.0 H 2 HA TURBIN Unit manually tripped following 4 spurious loss of load indication -

830828 F 1.1 A 3 EB ELECON Unit tripped as a result of an inverter malfunction. Unit returned to service.

I 2 3 4 F Forced Reason: Method: Exhibit G - Instructions S. Scheduled A Lquipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram- Entry Sheets for Licensee C-Refueling 3 Automatic Scram- Event Report (LER) File (NUREG-D Regulatory Restriction 9-Other (Explain) 0161) 1:-Operator Training & License Examination

, F Administrative 5

.G-Operational Frror (Fsplam) c /.o ao 44c ue.a. . c/ Exhibit I - Same Source 19/77) il-Ot her i E splain )

SUM 61ARY OF OPERATING EXPERIENCE DOCKET NO _

50-251 _

UIiIT Turkey Point 4-DATE September 15,1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT 140 NTH _ August 1983

, Unit 4 operated at power.except as noted in the Unit Shutdowns Report.

Other major safety relate.d maintenance activities included:

A DC static inverter was replaced.

A control rod that had dropped was recovered.

An incore detector was replaced.

Two charging pumps were overhauled.

A motor operated pressurizer control valve was overhauled.

A process radiation monitor and an area radiation monitor were repaired.

A rod position indication indicator was replaced.

1

, s d

f I

l

=

M

~

AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-335 UNIT St. Lucie Unit 1

~ ~

DATE COMPLETED BY N. W. Grant TELEPilONE (305).552-3.675' August 1983 MONTH .

i DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL

( (MWe-Net) -(MWe Net) '

g  ;

2 I8 3 ,9

-" ~~~

4 20

"" "~

S 33 6 22 y

8 ---

24 9 73

"- ~~~

10 26 12 28

~" "-

13 39 14 ---

30

15 33

~" '

I6 INSTR UCTIONS On this format.!ist the aser.sge daily unit power lesel in MWe Net for each day in the reporting inonth. Compute to the nearest whole megawatt.

e)/771

~

OPERATING DATA REPORT DOCKET NO. 50-335 DATE _9-15-83 COMPLETED BY J. W. Grant TELEPHONE 1305) 552-3675 OPERATING STATUS St. Lucie' Unit #1 Notes

1. Unit Name:
2. Reporting Period: Auaust 1983 Unit I remained out of 2700 service for refueling and .
3. Licensed Thermal Power (MWt): scheduled maintenance.
4. Nameplate Rating (Gross MWe): 890 830
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 867
7. Maximum Dependable Capacity (Net MWe): 822
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions.If Any:

This Month Yr..to-Date . Cumulative 11; Hours In Reporting Period 744 5.831 58.679-

12. Number Of Hours Reactor Was Critical 0 1.366.9 44,466.1
13. Reactor Reserve Shutdown Hours 0 0 *205".3
14. Hours Generator On-Line 0 1,350.9 43,576.2
15. Unit Reserve Shutdown Hours 0 0 39.3
16. Gross Thermal Energy Generated (MWII)' 0 3,352,422 108,667,938 .
17. Gross Electrical Energy Generated (MWH) 0.. 1.160.280 35.373.875
18. Net Electrical Energy Generated (MWH), -3,764~ 1,082,705 33,346,896 ,
19. Unit Service Factor 0 23.2 74.2
20. Unit Availability Factor 0 -23.2 74.3
21. Unit Capacity Factor (Usir.g MDC Net)
  • 0 22.7 72.3,
22. Unit Capacity Factor ('Using DER Net) 0 22.4 70.3
23. Unit Forced Outage Rate 0 1.1 4.6'
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each): '
25. If Shut Down At End Of Report Period. Estimated Date of Startup: November 19. 1983 -e
26. Units In Test Status (Prior to Commercial Operation): Forecast A chies ed .

INITIA L CRITICALITY

~

INITI A L ELECTRICITY COMM ERCIAL OPERATION ~

(9/77)

h. _ _ _ _ _ _ _ . - - _ .

UNIT SilUTDOWNS ANDIOWER REDUCTIONS DOCF.ET NO. 50-335 UNIT NAME St. Lucie #1 DATE 9-15-R3 REPORT MON. fit August 1983 COMPLETED BY N U nrant TELEPilONE (305) 552-3675 -

~

= .a c

, 5? g

}5% Licensee ,E 't, {". Cause & Corrective No. Date i 5? i 255 Event 7 o- Action to H

$5 E 5 5 :f e

Report = 80 h'?

u s Prevent Recurrence b

3 830226 S 744 C 4 RC FUELXX Unit 1 remaining out of service for refbeling and scheduled maintenance.

i N

I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S Scheduled A Lyuipment Failure (Explain) 1 -Manual for Preparation of Data fl-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Autcmatic Scram. Event Report (LER) File (NUREG.

D Regulatory Restriction 9-Ot her ( Explain ) 0161) 1:-Operator Training & License Examination

, F. Administ rative b C * ** " "' 5 G-Operational Er ror ( F splain) c yo,qo ezsove. ..d Exhibit I Same Source 01/77) Il-Ot her (1:xplain)

SUMMARY

OF OPERATING EXPERIF.NCE DOCKET NO. 50-335 UNIT St.'Lucie Unit'l DATE September 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT IiONTH Augnet 1983 St. Lucie Unit I remaine'd'out of service for a refueling and maintenance outage.

Major safety related maintenance included:

A 120-140VDC battery was replaced.

An area radiation monitor power supply was replaced.

A volume control tank valve was repaired.

A containment spray control valve indication was rep' aired.

Inspections and requirements.of IE Bulletin and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month.

See correspondence between FPL and NRC for information concerning the thermal shield.

summmmmmmf*'

AVEllAGE DAILY UNIT POWER LEVEL DOCKET NO.53-389 l UNIT St. Lucie Unit 2 .

DATE 9-15-83 COMPLETED BY 'N. W. Grant TELEPilONE (305)S52-3675 MONG August 1983 * .

DAY AVER AGE DAILY POWER LEVEL '

DAY AVER AGE DAILY POWER LEVEL tMWe Net) -(MWe Neil I 777 37 811 2

802 ig 811 3 740 39 810 4 10 20 810 5 777 2, 811 804 6 22 811 7 23 808 805 8 806 24 804 809 9

808 to 26 812 809 808 37 0

12 28 808 13 814 29 805 14 815 30 808 815 15 33 16 810 INSTRUCTIONS On this format, hst the average daily unit power lesel in MWe Nei for each day in the reporting month. Compute to the nearest whole megawait.

(9/77)

._..,1 - _ _ - , _ _ . - . . . _ _ _ , . , _ . _ _ - . . _ . . _ . . - , . , _ . . . - __ . , . _ .

s .

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-389 UNIT NAME St. Lucie 2 DATE 9-15-83 COMPLETED BY P Pup REPORT MONTil August 1983 TELEPHONE (305) 552-3654

. "i -

c ri 3 :o -

-o .I _:: E , .s % Licensee g *, 5"o c Cause & Corrective No. Date g 3g j ,j g $ Event u7 83' Action to

  • $ r$ 0

$E j di :j Report a Prevent Recurrence C

NA*

830803 F 11.1 A 1 CB PUMPXX Unit removed from service to in-vestigate and repair oil leakage from a reactor coolant pamp.

NA* 830804 F 8.9 H. 1 ID INSTRU Unit removed from service while returning to power due to axial shape index limits.

  • unit not commercial until 8-8-83 1 2 3 4 l~ : Forced Reason: Method: Exhibit G - Instructions S. Scheduled A Lyuipment Failure (Explain) 1 Manual for Preparation of Data Il-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) Fde (NUREG-D Regulatory Restriction 9-Other (Explain) 0161)

I'.-Operator Training & License Examination

, F Administrative 5 G-Operational I r ror (F xplain I c. /.oao aJove.;,.. J Ex!ubit ! - Same Source (9/77) Il-Ot her (1:xplain)

SUMMARY

OF OPERATING Ey.PERIENCE DOCKET NO. _

50-389 UNIT - St. Lucie Unit"2 DATE September 15, 1983 COMPLETED BY P. L . Pace TELEPHONE (305) 552-3654 REPORT MONTH August 1983

~

Unit 2 dc;1ared commercial August 8, 1983.

See the Unit Shutdowns and Power Reductions report for details on unit outages.

Major safety related maintenance included:

A reactor incore instrumentation amplifier was replaced.

An area radiation monitor was repaired.

' Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report month.

+

N k

4 M-

. +

OPERATING DATA REPORT DOCKET NO. 50-389 DATE 9-15-83 COMPLETED BY N. W. Grant TEl.EPHONE .(305) 55f-3675 OPERATING STATUS St. Lucie Unit #2- Notes

1. Unit Name:
2. Reporting Period: August 1983 Unit 2 commenced 2,560 commercial operation on.
3. Licensed Thennal Power (MWt): -
4. Nameplate Rating (Gross MWe): 850 August 8, 1983.
5. Design Electrical Rating (Net MWe): R0d
6. Maximum Dependable Capacity (Gross MWe): 832

, 7. Maximum Dependable Capacity (Net MWe): 7A6

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report Give Reasons:
9. Power Level To which Restrided,if Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr to-Date* . Cumulative

  • 11; Hours In Reporting Period 744 576 576-
12. Number Of Hours Reactor Was Critical 744 576 576
13. Reactor Reserve Shutdown Hours 0 !0 '

0*

14. Hours Generator On Line 724.0 576.0 576.0
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1,837,085 1,473,160 1,473,160 .
17. Gross Electrical Energy Generated (MWH) 612,590 491,990 491,990

~

18. Net Electrical Energy Generated (MWH) 579.657 466.280 466.280
19. Unit Senice Factor 97.3 100.0 100.0
20. Unit Availab;Iity Factor 97.3 100.0 100.0 99.1
21. Unit Capacity Factor (Using MDC Net) -

103.0 1 03 .0,

22. Unit Capacity Factor (Using DER Net) 96.9 100.7 100.7

~23. Unit forced Outage Rate 0 0 'O

24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):
25. If Shut Down At End Of Report Period, Estirtated Date of Startup:
26. Units in Test Status (Prior Io Commercial Operation): Forecast Achiesed ,

INITIA L CRITICA LITY 5-27-83 2-83 INITI A L ELECTRICITY 6 -83 6-13-83 COMMERCIAL OPERATION Late July 10R3 S-8-E3.

  • These columns contain data from' date of ~

commercial operation only.

(9/77) w

y- .*

FLORID A POWER & LIGHT COMPANY September 15, 1983 PNS-LI-83-611 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Attached are the August 1983 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. 1 and 2.

Very truly yours,

<ea I

,h. W. Williams, Jr.

)Vicefresident Nuclear Energy JWW/NWG/js l

Attachraent cc: J. P. O'Reilly, Region II l

=

'It i

PEOPLE. . SERVING PEOPLE