MONTHYEARHL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5493, Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5447, Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5416, Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5393, Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5364, Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 2 HL-5332, Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant1997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant HL-5314, Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant1997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 HL-5237, Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20116J3821996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20112J0661996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Ehnp ML20116J3971996-05-31031 May 1996 Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1 ML20112J0691996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant ML20116J3901996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1 ML20111B0061996-04-30030 April 1996 Monthly Operating Repts for April 1996 for Ei Hatch Nuclear Plant HL-5144, Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant1996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant ML20111B0131996-03-31031 March 1996 Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2 ML20101B1911996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5111, Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant ML20101B2001996-01-31031 January 1996 Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1 HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
OPERATING DATA REPORT DOCKET NO. 50-321 10-10-83
'M DATE g COMPLETED BY: C. M. Curtis Q TELEPHONE (912) 367-7851 g OPERATING STATUS Notes
- 1. Unit Nane: E. I. Hatch Wclear Plant Unit 1
- 2. -Reporting Period: 09-83
- 3. Licensed Thermal Power (MWt): 2436
- 4. temeplate Rating (Gross MWe): 809.3 ,
- 5. Design Electrical Rating (Net MWe): 777.3
- 6. Maximum Dependable Capacity (Gross MWe'): 801.2
- 7. Maximum Dependable Capacity (Net MWe): 764.7
- 8. If 01anges occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which R?stricted, If Any (Net MWe) 5\5 MWe.
- 10. Reasons for Restrictions, If Any: Wgh OW p Qehdy This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 720 6551 67919
- 12. mmber of Hours Reactor was Critical 709.5 5209.5 48162.0
- 13. Reactor Reserve Shutdown Hours 0 0 0
-z 14. Hours Generator On-Line 699.7 4956.7 45107.0 oNA 15. Unit Reserve Shutdown Hours 0 0 0 co' 16. Gross Thermal Energy Gcnerated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 1207872 379650 10718549 3470960 94966912 30740450 58 mn 18. Net Electrical Energy Generated (MWH) 358380 3300005 29186220 O 97.2 75.7 66.4 e 19. Unit Service Factor
- 20. Unit Availability Factor 97.2 75.7 66.4 56 oo 21. Unit Capacity Factor (Using MOC Net) 65.1 65.9 56.2
%t 22. Unit Capacity Factor (Using DER Net) 64.0 64.8 55.3 0,g 23. Unit Forced Outage Rate 2.8 6.2 18.8
- 24. Shutdowns Scheduled Over Next 6 m nths (Type, Date, and Duration of Each):
QQ g
- 25. If Shutdown at End of Report Period, Estimated Oate of Startup:
- 26. lklits in Test Status (Prlor to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERA E DAILY UNIT POWER LEVEL 4
00CKET NO. 50-321 DATE: 10-10-83 COMPLETED BY: C. M. Curtis TELEPHONE (912) 367-7851 1
MONTH 09-83 DAY AVERAE DAILY POWER LEVEL
- DAY AVERAE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1 122 17 497 2 247 18 499 l 3 591 19
- 4 499 722 20 5 501 739 21 6 502 600 22 7 518
' 338 23 8 506 491 24 9 511 496 25 10 515
- 498 26 11 514 4
' 499 27 12 514 498 28 13 494 3 501 29
) 14 504 504 30 508 15 506 31
] 16 498 -
1 .
3 (9/77) i I
I.
O d
O', __
. NARRATIVE REPORT UNIT 1 September 1st 0318 Unit tied to system grid.
September 1st 1536 Reactor scram on turoine trip due to stop valve fast closure.
September 2nd 0205 Reactor critical.
September 2nd 0837 Unit tied to system grid.
September 6th 1335 Reduced load for rod sequence exchange.
September 8th 0000 Load held due to leaking fuel problems.
September lith 0030 Reduced loac for weekly turbine
- testing.
September 16th 2120 Reduced load for weekly turbine testing.
September 23rd 2102 Reduced load for rod pattern adjustment.
September 23rd 2217 Reduceo load for weekly turbine testing.
September 28th 1014 Reduced load due to loose bolts in bearing retainer on "A" cire.
water pump.
.3
- 21 ,
DOCKET NO.
UNIT N AME au-/-u; One
. Hatch UNIT SI:UTDOWNS AND POWER REDUCTIONS ,j y
DATE COMPLETED BY C.M. Curtis SE N ben ,a REPORT MONT11 TELEPHONE 912-367-7Rs1 Ext.-2882 c *
. I c n % e4 5 LI' "5CC * .,- 'Cause & Corrective
- 1
~
S3 gjg No. Date E. 5_s j 6
Event $*3 Action to I 0 Report # g p,cvent Recurrence
$M g Q- y o 1 83-63 83-09-01 F 3.3 A 3 IVA HB Valvex Rx. scram while performing daily stop valve & control intermxliate valve .
testing due to pressure transient in ,
EHC system. q r.
83-64 83-09-01 S 12.3 H 5 N/A !!B Valvex Power ascension from above outage. L 83-65 83-09-01 F 17.0 A 3 N/A HB Valvex Rx. scram on turb. trip due to stop I
. valve fast closure. j 83-66 83-09-02 S 39.4 A 5' N/A HB Valvex Power ascension from abow outage. '
l 83-67 83-09-06 S 14.4 H 5 ?VA RB Conrod Load reduction for rod sequence exchancy .
83-68 83-09-07 S 20 H 5 N/A RB Conrod Recomry from above reduction. l 83-69 83-09-08 F 552.0 H 5 N/A IC Fuelxx Inad reduction due to leaking fuel problems. > 4
.. 1 2 3 4
- 1 Reason: Method: Exhibit G -Instructions J F: Forced for Preparation of Data 't i A Equipment' Failure (Explain) 1. Manual .
S: Scheduled
- Entry Sheets for Licensee . - ' '
B Maintenance or Test
- 2. Mar.ual Scram.
c.Refu: lina, .
- 3. Automatic Scram, j Event R port (LER) File (NUREG-:
4 -Continuations 016I) ...
D Regulatory Rest:.c; ion .,
E Operator 1 raining & License Examination 5-Icad Feduction 3 i y*
F. Adminis.ra:!ve 9-Other (Explain) Exhibit 1-Same Source , .
G Operational Errer(.ixplain) ,, g Il Other (Explain) ;{
N/M) i- ; , ,
, s '
t l
50-321 DOCKET NO UNIT SI;UTDOWNS AND POWER REDUCTIONS UNIT N A'.lE DATE COMPLETED BY .
REPORT MONTil SN TELEP110NE c
u e -
EO 5%, "Cause & Corrective
}n $ .Y ~
3s5 Licensec Event g ${"., - Action to No. Date E-
- 3l mU Prevent Recurrence O ~c
=-
e 1 tgc 's Report # uo ,
S 83-70 83-09-11 S 2.5 B 5 lyA !!A Turbin Ioad reduction due to weekly turbine test. ,
83-71 83-09-16 S 5.7 B 5 IVA IIA Turbin load reduction due to weekly turbine test.
83-72 83-09-23 S 3.0 11 5 N/A IU Conrod load reduction for rod pattern adjust-ment.
83-73 83-09-23 S 3.0 B 5 IMA IIA 'Iurbin Ioad reduction due to weekly turbine test.
83-74 83-09-28 F 3.8 A 5 N/A .3 Purquoc Ioad reduction due to loose bolts in bearing retainer on "A" cire, water -
pmp.
4 I 2 3 ,
Method: Exhibit G -Instructions F: Forced Reason: - for Preparation of Data A Equipment' Failure (Explain) 1 -Manual S: Scheduled '
Entry Sheets for Licensee . -
B4taintenance of Test 2-Manual Scram.
3-Automatic Scram. } Event Report (LERI File (NUREG -
C-Refuelian .
0161)
D Regulatory ilest:.e. ion 4 -Continuations i E-Operator Training & Ucense Examination 5-Inad Peduction 5 F Adminis.r.i:ive 9 -Oh (Mlain) Exhibit 1 Same Source .
G-Operational Erre (dxplain) ,
Il-Other(Explain) t ;3 -
. ro/77) ,
h",, ,
s
~
. v v
. HATCH 1 SAFETY-RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR SEPTEMBER 1983 NUMBER DATE COMPLETED DESCRIPTION 83-6740 9-le-83 Replace existing camaged cryogenic valve on nitrogen storage tank.
83-5805 7-31-83 Removed present gauges &
snubber. Installeo WeKsler compound liquid filled gcuges with diaphragm as per DCR 83-174.
82-6779 3-09-83 Replaced needle & calibrated tne floor drain filter pressure indicator gauge.
82-1444 8-30-83 Cut opening in masonry wall 16A(B) between rooms C20 &
C21. Installed H.M. door &
. frame (C-2A). Removed existing door & frame between rooms C20 & C23.
Installed new grill & closed opening.83-683 6-24-83 Fabricated & installeo conduit supports. Hemoved cable from ESS-II-320 & 321.
Rerouted conduit. Pulled in cables H11-P654-E58-C074A &
C075A per DCR 80-348 &
terminated cables.
I
OPERATING DATA REPJRT DOCKET NO. 50-366 DATE 10-10-83 COMPLETED BY: C. M. Curtis TELEPHONE 2 367-7851 (91')
OPERATING STATUS
- 1. Notes
- 2. Unit mme:
Reporting E. I. Hatch Period: 09-83 Nclear Plant thit 2 3.
- 4. Licensed Thermal Power (MWt): 2436 mmeplate Ratirig (Gross MWe): 817.0
- 5. Design Electrical Rating (Net MWe): 784.0 6.
- 7. Maximum Dependable Capacity (Gross MWe): 803.9
' Maximum Dependable Capacity (Net MWe): 774.5 8.
If Changes Occur in Capacity Ratings (Items Wmber 3 through 7) Since, Give LastReasons:
Report 9.
Power Level to Which Restricted, If Any (Net MWe):
- 10. Reasons for Restrictions, If Any:
- 11. Hours In Reporting Period This Month Yr-to-Date 720 Cumulative
- 12. mmber of Hours Reactor was Critical 6552 35689
- 13. Reactor Reserve Shutdown Hours 664.0 3908.2 4 0 25059.3 '
- 14. Hours Generator On-Line 0 0
- 15. Unit Reserve Shutdown Hours 644.3 3633.7 0 23788.8
- 16. Cross Thermal Energy Generated (MWH) 0 0
- 17. Cross Electrical Energy Generated (MWH) 1460664 6994220 50599903
- 18. Net Electrical Energy Generated (MWH) 482710 2335180 3 460332 16611650 19.. Unit Service Factor
- 20. Unit Availability Factor 89.5 55.5 66.7
- 21. Unit Capacity Factor (Using MDC Net) 89.5 55.5 66.7
- 22. Unit Capacity Factor (Using DER Net) 82.6 43.5 81.5 57.1
- 23. Unit Forced Outage Rate 42.9 56.4 10.5 21.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): 14.0
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
f 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY b INITIAL ELECTRICITY COMMERCIAL OPERATION e
AVERAE DAILY UNIT POWER LEVEL DOCKET NO. 50-366 DATE: 10-10-83 >
COMPLETED BY: C. M. Curtis TELE.; HONE (912) 367-7851 MONTH 09-83 DAY AVERAE DAILY POWER LEVEL DAY AVERAE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 765 17 773 2 765 18 758 3 750 19 771 4 767 20 769 5 766 21 769 6 767 22 775 7 766 23 425 8 765 24 -16 9 767 25 154 10 753 26 571 11 767 27 726 12 768 28 305 13 769 29 -18 14 770 30 163 15 775 31 16 775 *
(9/77) 8 4 8 -
- t. ._ a_
i NARRATIVE REPORT UNIT 2 Saptember 3ro 0025 Reduceo loao for weekly turoine testing.
0039 Recuced loao for weekly turbine September 10th testing.
2335 Recuced loao for weekly turbine September 17th testing.
1320 Reactor scram on false high September 23rd containment pressure signal caused by bumped instrument rack.
September 23rd. 1600 Extendeo shutdown for maintenance on E32 valve motor.
September 24th 1313 Reactor critical.
0115 Unit tied to system gria.
September 25th :
September 28th 1013 Eeactor manual scram oue to trips on both reactor recirc pumps.
September 29th 1818 Reactor critica.'.
0159 Unit tieo to systein grid.
Sep& ember 30th l
l l
I t
~ -- .- _ _ _ . . _ , . _
50-366 DOCKET NO.
UNIT S!!UTDOWNS AND POWER REDUCTIONS NM N UNIT N A.'.t E DATE 10-7-83 ,
COMPLETED By C.M. Curtin
- SEPTEPEER 912-367-7851 REPORT MONTil TELEP110NE Ext.-2882 q C *
- s. C E4-9- 4 o yt Licensee Ev "Cause & Corrective N
~
E. jk 3jS Event Action tu No. Date $
$ y .U mU Prevent Recurrence g gc
=
O=- Report # o u ,
^$
b W
83-26 83-09-03 S 4.6 B 5 N/A IIA Turbin Inad reduction due to weekly turbine testing. .
83-27 83-09-10 S 4.4 B 5 N/A IIA Turbin Inad reduction due to weekly turbine testing..
83-28 83-09-17 S' 5.4 B 5 N/A !!A Turbin- Inad reduction due to wmkly turbine testing.
83-29 83-09-23 F 35.9 11 3 N/A IB Instru Rx. scram on false high cont. press signal caused by btmped instr. rack.
83-30 83-09-23 S 10 A 9 N/A CD FbtorX Extended shutdown for maintem on E32 valve notor. .
83-31 83-09-25 S 44.8 11 5 N/A IB Instru Power ascension from above outage.
3 4 i 2 .
Method: -
Exhibit G . Instructions
! F: Forced Reason: for Preparation of Data A Equipment' Failure (Explain) 1-Manual -
S: Scheduled ! Entry Sheets for Licensee . -
B-Maintenance of Test 2. Manual Scram.
- 3. Automatic Scram. j Event Report (LER) Fila (!JUREG -
C Refueling . '
D Regulatory ilest:.c: ion 4 -Continuations .
016I)
E-Operator ' training & License Examination 5-Icad Feduction 3
' F Adminis.ra:!ve 9-Oh (Explain) Exhibit 1-Same Source , .
G-Operatwnal Erre:(.:xplain) ,.g ro/77) Il Other (Explain) . i. ,
(,
s
~
50-366 DMET NO.
UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N A'.1E DATE {
COMPLETED BY REPORT MON 111 SN TELEPl!ONE w.
n., - 'Cause & Corrective
-, ,$? };; ) .Y Licensee [ *,,
- n. Action to Nii. Date g 3g js5 Event g'3 v I l-dE $ j;$ Report # to u
[3 ,
Prevent Recurrence a
83-32 83-09-28 F 39.8 A 2 N/A CD PtunEacc Manual scram due to trips on both Ibc. recirc punps.
83-33 83-09-30 S 22 II 5 N/A CB Piirpxx Ibwer ascension from above outage.
i l
3 4 I 2 .
Reason: Method: Exhibit G -Instructions
. F: Forced for Preparation of Data S: Scheduled A Equipment' Failure (Explain) 1 Manual -
2 Manual Scram. ! Entry Sheets for Licensee -
B Maintenance of Test Event Report (LER) Fi!* (NUREG. -
C-Refueling . 3 Automatic Scram. }
D Ret ,ulatory F.est:.sion 4 -Continuations .
0161) -
E Operator T raining & License Examination '
5-Icad Feduction 3
~
F Adminis.ra:!ve 9-Other (Explain) Exhibit ! Same Souree .
G-Operat:ena! Erret(.:xplain) ,.3 i , 8cl??) Il Other (Explain) ,
i y . . , ,
. ?)
L , y
o HATCH 2 SAFETY-RELATED MAINTENANCE REQUEST 5 TO 6E REPORTED FOR SEPTEM6ER 1983 NUMBER DATE COMPLETE DESCRIPTION 83-4201 6-04-83 Provided drain lines for reactor feedpump loop seal level indicators.
83-2211 6-09-63 Conduit installed & core drills made in accordance with design sketches per DCR 80-157 & FDR 80-157-70.
f 83-2202 7-02-83 Use LW&J 2-83-32. Lifted wires & removed soler.oids.
Reattacheo wires as per LW&J sheet.
82-5714 3-31-83 Disconnected &,recannected as necessary circJits UCX706C16/B01 &
UCA90F20A/H01 from the B2 switch (2U43-N061) on the #
Unit 2 east cableway alarm valve, el. 112'-0" per DCR 82-133.
82-5713 3-16-83 Calibrated the 2 gauges (2043-R002A) & 2U43-R0028) the B2 pressure switch (2U43-N061) on the alarm valve - el. 112' turbine buildin per SM 82-133-3 Rev. A Ref. DCR 82-133).
83-3553 7-07-83 Reorient the flex hose shown on FDR 82-76-199 to a norizontal plane to eliminate the existing pocket.
83-1325 5-26-83 Prepare floor & construct equipment pads. Refer to design documents listed on attached continuation sheet.
(Ref. DCR 81-174).
83-1324 5-27-83 Fabricated mounting sub-plate, weloed plate to pad & bolted panel 2H21-P051 in place. Refer to sketches 5M-81-174-14, SM-81-174,15, and FDR 61-174-11.
c l l
83-1323 5-27-83 Fabricated mounting sub-plate, weloed plate to pad and bolted panel -
2H21-P050 in place. Refer to sketches SM 81-174-14, SM-81-174-15, and FDR 81-174-11.
l l
82-1616 6-09-83 Installed insulation around Unit 2 D/W hangers &
installed tread pads in areas of high traffic.
83-2044 4-25-83 Remove 0 torus outboard purge valve from line, decontaminated, prepared valve & actuator for shipping to Wyle Lab.
Removed old Tee ring, 0-ring gland & o-rings, installed new Tee ring.
83-4514 8-25-83 Removed present plant service water pump discharge pressure gauges & snubbers iristalled Weksler compound liquia filled with diaphgram seals per DCR 83-124.
l l
T D
i
,~
Georgia Powtr Ccmptny Post Offica Box 439 3
Brxisy, Georgia 31513 Telephone 912 367-7781 912 537-9444 -
Edwin 1. Hatch Nuclear Plant September 10, 1983 GM-83-996 PLANT E. I. HATCH NRC Monthly Operating Report Director Office of Inspection and Enforcement United States NL: lear Regulatory Commission Washington, D. C. 20555
Dear Sir:
Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for liatch Unit 1, Docket #50-321, and for Hatch Unit 2, Docket #50-366.
b C.
H.