Amends 88 & 50 to Licenses NPF-39 & NPF-85,respectively, Revising TS Table 1.2 & TS Bases 3/4.9.11 to Remove Average Reactor Coolant Temperature Requirement in Operational Condition Five,Refueling
ML20078J168
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 01/27/1995
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Philadelphia Electric Co
Shared Package
ML20078J172 List:
References
NPF-39-A-088, NPF-85-A-050 NUDOCS 9502070333
Download: ML20078J168 (10)


Text

..

po ucuq yo.

t UNITED STATES NUCLEAR REGULATORY COMMISSION f

WASHINGTON, D.C. 20555-0001

\\..../

PHILADELPHIA ELECTRIC COMPANY DOCKET NO. 50-352 LIMERICK GENERATING STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 88 License No. NPF-39 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Philadelphia Electric Company (the licensee) dated August 31, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in confo

'+y with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in acccreance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

9502070333 950127 PDR ADOCK 05000352 P

PDR

V

. 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-39 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.

88, are hereby incorporated into this license. Philadelphia Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days.

FOR UCLEAR REGULATORY COMMISSION bd for John F. Stolz, Director Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: January 27, 1995

Y 9

ATTACHMENT TO LICENSE AMENDMENT NO. 88 FACILITY OPERATING LICENSE NO. NPF-39 DOCKET NO. 50-352 Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.

Remnyg Insert 1-10 1-10 B 3/4 9-2 B 3/4 9-2

v-DEFINITIONS TABLE 1.2 OPERATIONAL CONDITIONS MODE SWITCH AVERAGE REACTOR CONDITION POSITION COOLANT TEMPERATURE

1. POWER OPERATION Run Any temperature
2. STARTUP Startup/ Hot Standby Any temperature
3. HOT SHUTDOWN Shutdown # ***

> 200'F

4. COLD SHUTDOWN Shutdown # ## ***

$ 200 F

5. REFUELING
  • Shutdown or Refuel ** #

NA 1

  1. The reactor mode switch may be placed in the Run or Startup/ Hot Standby position to test the switch interlock functions provided that the control rods are verified to remain fully inserted by a second licensed operator or other technically qualified member of the unit technical staff.
    1. The reactor mode switch may be placed in the Refuel position while a single control rod drive is being removed from the reactor pressure vessel per Specification 3.9.10.1.
  • Fuel in the reactor vessel with the vessel head closure bolts less than fully tensioned or with the head removed.
    • See Special Test Exceptions 3.10.1 and 3.10.3.
      • The reactor mode switch may be placed in the Refuel position while a single control rod is being recoupled provided that the one-rod-out interlock is OPERABLE.

LIMERICK - UNIT 1 1-10 Amendment No. 88

REFUELING OPERATIONS BASES 3/4.9.6 REFUELING PLATFORM The OPERABILITY requirements ensure that (1) the refueling platform will be used for handling control rods and fuel assemblies within the reactor pressure vessel, (2) each hoist has sufficient load capacity for handling fuel assemblies and control rods, (3) the core internals and pressure vessel are protected from excessive lifting force in the event they are inadvertently engaged during lifting operations, and (4) inadvertent criticality will not occur due to fuel being loaded into a unrodded cell.

3/4.9.7 CRANE TRAVEL - SPENT FUEL STORAGE P0OL The restriction on movement of loads in excess of the nominal weight of a fuel assembly and associated lifting device over other fuel assemblies in the storage pool ensures that in the event this load is dropped 1) the activity release will be limited to that contained in a single fuel assembly, and 2) any possible distortion of fuel in the storage racks will not result in a critical array. This assumption is consistent with the activity release assumed in the safety analyses.

3/4.9.8 and 3/4.9.9 WATER LEVEL - REACTOR VESSEL and WATER LEVEL - SPENT FUEL STORAGE POOL The restrictions on minimum water level ensure that sufficient water depth is available to remove 99% of the assumed 10% iodine gap activity released from the rupture of an irradiated fuel assembly.

This minimum water depth is consistent with the assumptions of the accident analysis.

3/4.9.10 CONTROL ROD REMOVAL These specifications ensure that maintenance or repair of control rods or control rod drives will be performed under conditions that limit the probability of inadvertent criticality.

The requirements for simultaneous removal of more then one control rod are more stringent since the SHUTDOWN MARGIN specification provides for the core to remain subcritical with only one control rod fully withdrawn.

3/4.9.11 RESIOVAL HEAT REMOVAL AND COOLANT CIRCULATION The requirements that at least one residual heat removal loop be OPERABLE or that an alternate method capable of decay heat removal be demonstrated and that an alternate method of coolant mixing be in operation ensures that 1) suf-ficient cooling capacity is available to remove decay heat and maintain the water in the reactor pressure vese 1 below 140 F, and 2) sufficient coolant circulation l

would be available through the reactor core to assure accurate temperature indication and to distribute and prevent stratification of the poison in the event it becomes necessary to actuate the standby liquid control system.

The requirement to have two shutdown cooling mode loops OPERABLE when there is less than 22 feet of water above the reactor vessel flange ensures that a single failure of the operating loop will not result in a complete loss of resid-ual heat removal capability. With the reactor vessel head removed and 22 feet of water above the reactor vessel flange, a large heat sink is available for core cooling. Thus, in the event a failure of the operating RHR loop, adequate time is provided to initiate alternate methods capable of decay heat removal or emergency procedures to cool the core.

LIMERICK - UNIT 1 B 3/4 9-2 Amendment No. 88

pm Etat, y -

t UNITED STATES

{

j NUCLEAR REGULATORY COMMISSION t

WASHINGTON, D.C. 20666 4001

\\**.,*/

PHILADELPHIA ELECTRIC COMPANY DOCKET N0. 50-353 LIMERICK GENERATING STATION. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 50 License No. NPF-85 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Philadelphia Electric Company (the licensee) dated August 31, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

. 2.

Accordingly, the license is amended by chnges to the Technical Specifications as indicated in the attachd.it to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-85 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.

50, are hereby incorporated into this license.

Philadelphia Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days.

FOR T CLEAR REGULATORY COMMISSION

$10 fikL PO' John F. Stolz, Director Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: January 27, 1995 i

ATTACHMENT TO LICENSE AMENDMENT NO. 50 FACILITY OPERATING LICENSE NO. NPF-85 DOCKET NO. 50-353 Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.

I Remove Insert 1-10 1-10 1

B 3/4 9-2 B 3/4 9-2 i

l l

i i

DEFINITIONS TABLE 1.2 OPERATIONAL CONDITIONS MODE SWITCH AVERAGE REACTOR CONDITION POSITION COOLANT TEMPERATURE

1. POWER OPERATION Run Any temperature
2. STARTUP Startup/ Hot Standby Any temperature
3. HOT SHUTDOWN Shutdown # ***

> 200*F

4. COLD SHUTDOWN Shutdown # ## ***

s 200*F

5. REFUELING
  • Shutdown or Refuel ** #

NA

  1. The reactor mode switch may be placed in the Run or Startup/ Hot Standby position to test the switch interlock functions provided that the control rods are verified to remain fully inserted by a second licensed operator or other technically qualified member of the unit technical staff.
    1. The reactor mode switch may be placed in the Refuel position while a single control rod drive is being removed from the reactor pressure vessel per Specification 3.9.10.1.
  • Fuel in the reactor vessel with the vessel head closure bolts less than fully tensioned or with the head removed.
    • See Special Test Exceptions 3.10.1 and 3.10.3.
      • The reactor mode switch may be placed in the Refuel position while a single control rod is being recoupled provided that the one-rod-out interlock is OPERABLE.

i LIMERICK - UNIT 2 1-10 Amendment No. 50 l

, REFUELING OPERATIONS BASES 3/4.9.6 REFUELING PLATFORM The OPERABILITY requirements ensure that (1) the refueling platform will be used for handling control rods and fuel assemblies within the reactor pressure vessel, (2) each hoist has sufficient load capacity for handling fuel assemblies and control rods, (3) the core internals and pressure vessel are protected from excessive lifting force in the event they are inadvertently engaged during lifting operations, and (4) inadvertent criticality will not occur due to fuel being loaded into a unrodded cell.

3/4.9.7 CRANE TRAVEL - SPENT FUEL STORAGE P00L The restriction on movement of loads in excess of the nominal weight of a fuel assembly and associated lifting device over other fuel assemblies in the storage pool ensures that in the event this load is dropped 1) the activity release will be limited to that contained in a single fuel assembly, and 2) any possible distortion of fuel in the storage racks will not result in a critical array. This assumption is consistent with the activity release assumed in the safety analyses-.

3/4.9.8 and 3/4.9.9 WATER LEVEL - REACTOR VESSEL and WATER LEVEL - SPENT FUEL STORAGE P0OL The restrictions on minimum water level ensure that sufficient water depth is available to remove 99% of the assumed 10% iodine gap activity released from the rupture of an irradiated fuel assembly. This minimum water depth is consistent with the assumptions of the accident analysis.

3/4.9.10 CONTROL R00 REMOVAL These specifications ensure that maintenance or repair of control rods or control rod drives will be performed under conditions that limit the probability of inadvertent criticality. The requirements for simultaneous removal of more than one control rod are more stringent since the SHUTDOWN MARGIN specification provides for the core to remain subcritical with only one control rod fully withdrawn.

3/4.9.11 RESIDUAL HEAT REMOVAL AND C00LAf6 CIRCULATION The requirements that at least one residual heat removal loop be OPERABLE or that an alternate method capable of decay heat removal be demonstrated and that an alternate method of coolant mixing be in operation ensures that 1) suf-ficient cooling capacity is available to remove decay heat and maintain the water in the reactor pressure vessel below 140'F and 2) sufficient coolant circulation l

would be available through the reactor core to assure accurate temperature indication and to distribute and prevent stratification of the poison in the event it becomes necessary to actuate the standby liquid control system.

The requirement to have two shutdown cooling mode loops OPERABLE when there is less than 22 feet of water above the reactor vessel flange ensures that a single failure of the operating loop will not result in a complete loss of resid-ual heat renoval capability.

With the reactor vessel head removed and 22 feet v eater above the reactor vessel flange, a large heat sink is available for core cooling.

Thus, in the event a failure of the operating RHR loop, adequate time is provided to initiate alternate methods capable of decay heat removal or emergency procedures to cool the core.

LIMERICK - UNIT 2 B 3/4 9-2 Amendment No. 50 4