Text
._
TOLEDO
%ss EDISON A Centerior Energy Company D
4 AVENUE TOLEDO. OHIO 43652-0001 November 14, 1994 KB-94-1997 Docket No. 50-346 License No. NPF-3 U.S. Nuclear Regulatory Commission Document Control Desk Vashington, D.C.
20555 Gentlemen:
Monthly Operating Report, October, 1994 Davis-Besse Nuclear Power Station Unit 1 Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit No. 1 for the month of October, 1994.
If you have any questions, please contact G. M. Wolf at (419) 321-8114.
Very truly yours,
/
- Y l
Jo n K. Vood Plant Manager Davis-Besse Nuclear Power Station
)
GMV/dmc Enclosures cc:
L. L. Gundrum NRC Senior Project Manager J. B. Martin Region III Administrator S. Stasek NRC Senior Resident Inspector, Stop 4030 b ' [ <].
g{
)
9^11170308 941031 j
8 PDR ADOCK 05000346
/
R PDR 0
i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-0346 UNIT Davis-Besse Unit 1 DATE 11 94 COMPLETED BY Gerry Wolf TELEPHONE 419 -321 -8114 MONTH OCTOBER 1994 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
24 0
14 0
30 0
15 0
31 0
16 0
OPERATING DATA REPORT DOCKET NO 50-0346 DATE 11 94 COMPLETED BY Gerry Wolf TELEPHONE 419 -321-8114 OPERATING STATUS
- 1. Unit Name: Davis-Besse Unit 1 Notes
- 2. Reporting Period October 1994
- 3. Licensed Thermal Power (MWt) 2772
- 4. Nameplate Rating (Gross MWe) 925
_5. Design Electrical Rating (Net MWe) 906
- 6. Maximum Dependable Capacity (Gross MWe) 913
- 7. Maximum Dependable Capacity (Net MWe) 868
- 8. If Changes Occur in Capacity Ratings (Items number 3 through 7) since last report, give reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, if Any (Net MWe):
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 745.00 7,296.00 142,489.00
- 12. Number Of Hours Reactor Was Critical 2.85 6,553.85 88,794.30
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 5,532.00
- 14. Hours Generator On-Line 1.00 6,552.00 86,575.73
- 15. Unit Reserve Shutdown Hours 0.00 0.00 1,732.50
- 16. Gross Thermal Energy Generated (MWH) 665 17,425,679 223,197,448 i
- 17. Gross Electrical Energy Generated (MWH) 139 5,759,961 72,099,982
- 18. Net Electrical. Energy Generated (MWH) 0 5,469,441 67,995,810
- 19. Unit Service Factor
- 20. Unit Availability Factor 0.13 89.80 60.76 0.13 89.80 61.98
- 21. Unit Capacity Factor (Using MDC Net) 0.00 86.37 54.98
- 22. Unit Capacity Factor (Using DER Net) 0.00 82.74 52.67 23._ Unit Forced Outage Rate 0.00 0.00 20.04
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
November 15,1994
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-346 UNIT NAhlE: Davis-Besse #1 '
DATE:
November 1.1994 Cempleted by:
G. hl. Wolf Report $1onth October 1994 Tdephone:
(419)321-8114
,.E]=p Licensee Cause & Corrective g_
y E "o y c.
52
=
Event js s :
y7 gd Action to p
's y j
y3 3
yg5 Report #
NU E 0 No.
Date s
j Prevent Recurrence e
8 94-10-01 S
0 11 5
N/A N/A N/A Reactor power reduction continued due to (cont.)
end of cycle coastdown 9
94-10-01 S
743 C
1 N/A N/A N/A Turbine-Generator taken off-line to begin scheduled maintenance and refueling outage.
I 2
3 4
F: Forced Reason; hiethod:
Exhibit G -Instructions for Preparation of Data S: Scheduled A-Equipment Failure (Explain) 1-hf anual Entry Sheets for Licensee Event Report (LER)
B-hlaintenance or Test 2-hf anual Scram File (NUREG-0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from 5
E-Operator Training & License Examination Previous hionth Exhibit I - Same Source F-Administrative 5-Load Reduction
- Report challanges to Power Operated Relief Valves G-Operational Error (Explain) 9-Other (Explain)
(PORVs and Pressurizer Code Safety Valves (PCSVs)
Il-Other (Explain)
4 OPERATIONAL
SUMMARY
The Ninth Refuelir.g Outage started at 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> on October I when the Main TurNne was tripped. The Reactor was fully shutdown at 0348 hours0.00403 days <br />0.0967 hours <br />5.753968e-4 weeks <br />1.32414e-4 months <br />. 'liis outage was still in progress through the end of the month.