Amends 31 & 22 to Licenses DPR-77 & DPR-79,respectively, Revising Diesel Generator Surveillance Requirements to Reflect Actual as-designed Logic
ML20078G295
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/30/1983
From: Adensam E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20078G298 List:
References
NUDOCS 8310120046
Download: ML20078G295 (8)


Text

e 4

c;%

n w

I- -

~~~

ne I*

4

'7 l

gh

  • 3r s

TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-327 SEQUOYAH fiUCLEAR PLANT, UNIT 1 AMENDMEliT TO FACILITY OPERATING LICEt4SE Amendment flo. 31 License No. DPR-77 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The applications for anendment to the Sequoyah fluclear Plant, Unit 1 (the facility) Facility Operating License No. DPR-77 filed by the Tennessee Valley Authority (licensee), dated June 15 and July 29, 1983, comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the license, as amended, the provisions of the Act, and the rules and regulations of the Com-mission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendnent is in accordance with 10 CFR Part S1 of the Commission's regulations and all applicable requirements have been satisfied.

7 2.

Accordingly, the license is hereby amended by page changes to the Appendix A Technical Specifications as indicated in the attachment to this license amend-ment and paragraph 2.C.(2) of Facility Operating License No. DPR-77 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 31, are hereby incorporated into the license.

8310120046 830930 PDR ADOCK 05000327 P

PDR

" "^"'>

N1C FORM 318110/80l NRCM O240 OFFICIAL RECORD COPY

  • U.S. GPO 1983-400-247

.~..,

=

.~m fe w' x.-y

.w,44'

~ g r@w,g, 4),

2-The licensee shall operate the facility in accordance with the Techinical Specifications.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/

Elinor G. Adensam, Chief Licensing Branch No. 4 Division of Licensing Attactusent :

Appendix A Technical Specification Change Date of Issuance: September 30, 1983

" c'> JAiQ -..f.4.... D L : LB.. #.4.......QELa...........

,,,, &h1 e

,,{g,A,,,,,,,,, E,,,,(,,,am,,,,,,,,f

~~~+.S "*.... !.hmc C

a

....../.q0 /.83 ous) 9%.. -/.83 9../.p. 83

....M...../. 8 39 83 9

9 unc ronu ais rio,soi nnen, o24o OFFICIAL RECORD COPY

  • u.s. m usa-4*247

- ~ ~ ~m1

~

.-n

I

,,,. - r 7-. :

.- - n

% Gs

%.- g,;;4

.: G,2

%'t

's.,,

-l

.Z

.+

e ATTACHMENT TO LICENSE AMENDMENT NO. 31 FACILITY OPERATING LICENSE NO. DPR-77 DOCKET NO. 50-327 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page.

The revised page is identified by Amendment number and contains vertical lines indicating the area of change.

kaended Page 3/4 8-5 omerp DATEk

  • "5. " "'8-4

-247 nac rocu mo no,somacu ouo OFFICIAL RECORD COPY

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

Within 5 minutes after completing this 24 honr test, perform Specifica' tion 4.8.1.1.2.c.4.

The generator voltage and fre-quency shall be 6900 590 volts and 60 i 1.2 Hz within 10 seconds after the start signal; the steady state generator voltage and frequency shall be maintained within these limits during this test.

9.

Verifying that the auto-connected loads to each diesel generator do not exceed the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating of 4000 kw.

10.

Verifying the diesel generator's capability to:

a)

Synchronize with the offsite power source while the generator is loaded with its emergency loads upon a simulated restoration of offsite power.

b)

Transfer its loads to the offsite power source, and c)

Be restored to its snutdown status.

11. Verifying that the automatic load sequence timers are OPERABLE with the setpoint for each sequence timer within + 5 percent of its design setpoint.
12. Verifying that the following diesel generator lockout features prevent diesel generator starting only when required:

a)

Engine overspeed b) 86 GA lockout relay e.

At least once per 10 years or after any modifications which could affect diesel generator interdependence by starting the diesel generators simultaneously, during shutcown, and verifying that the diesel generators accelerate to at least 900 rpm in less than or equal to 10 seconds.

f.

At least odt.e per 10 years

  • by:

p

~

1.

Draining each fuel oil storage tank, removing the accumulated sediment and cleaning the tank using a soditm hypoclorite solution, and 2.

Performing a pressure test of those portions of the diesel fuel oil system design to Section III, subsection ND of the ASME Code at a test pressure equal to 110 percent of the system design pressure.

"These requirements are waived for the initial surveillance.

SEQUOYAH - UNIT 1 3/4 8-5 Amendment No. 31

QLl' Q

5 NQv&"

TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-328 SEQUOYAH NUCLEAR PLANT, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 22 License No. DPR-79 1.

The Nuclear Regulatory Comission (the Corvaission) has found that:

A.

The applications for amenener.t to the Sequoyah Nuclear Plant, Unit 2 (the facility) Facility Operating License No. DPR-79 filed by the Tennessee Valley Authority (licensee), dated June 15 and July 29, 1983, comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the license, as amended, the provisions of the Act, and the rules and regulations of the Com-mission; C.

There 1:; reasonable assurance (1) that the activities authorized by this amendment can De conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2, Accordingly, the license is hereby amended by page changes to the Appendix A Technical Specifications as indicated in the attachments to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-79 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.22, are hereby incorporated into the license.

'"'C'>

NEC FolM 318 (10/80) NRCM O24 0 0FFICIAL RECORD COPY

  • u.s. m 19:3 4 00-247 m-xmmm n

.n n n. : n.

.,n.

n-n..

- ~.

U%

Dw v.y

)

'. @Ib -,

MQF K::s g

-y vg e g ya w4 2-The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION 6

Elinor G. Mensam, Chief Licensing Branch No. 4 Division of Licensing Attache nt:

Appendix A Technical Specification Change Date of Issuance: September 30, 1983 f

M t

.n'/w

/

(/

\\

M

  • 1

$0 g h

/2

/

C FFICE >.L..A..:.

f.4......D..L. :. 4........O..E.L..D.............

. ' iB 4 AD-E lam..........

a

.MD........... /..hmc

..1 e

... g..f A.

cu:NAMe)

......p.............

" P w 4 1 o.......... u 1 9.........ua. /.8a....... 9/gy.8 3..........9..... /8 3.........

i NIC FO2M 318 tlO/BOI NRCM O243 OFFICIAL RECORD COPY

  • U.S. GPO 1983-400 247 u.

~

__ __. + -t-j

-w

- e

y

v..
r. ',-

m.

--.7.

+

r s.

-.g3

~.;p v

%4

- e u

-aw e

ATTACliMENT TO LICENSE AMEN 0 MENT NO. 22 FACILITY OPERATING LICENSE NO. OPR-79 DOCKET NO. 50-328 Replace the following page of the Appendix "A" Technical SpecificatioM with the enclosed page.

The revised page is identified by Amendment number and contains vertical lines indicating the area of change.

Amended Page 3/4 8-5 omcE)

SURNAMEf DATEk NRC FOIM318110/80l NRCM O240 OFFICIAL RECORD COPY A m. c o n 34 %.247

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 8.

Verifying the diesel generator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

During the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generator shall be loaded to greater than or equal to 4400 kw and during the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, the diesel generator shall be loaded to greater than or equal to 4000 kw.

The generator voltage and frequency shall be 6900 1 690 volts and 60 i 1.2 Hz within 10 seconds after the start signal; the steady state generator voltage and frequency shall be maintained within these limits during this test.

Within 5 minutes after completing this 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> test, perform Specification 4.8.1.1.2.d.4.b 9.

Verifying that the auto-connected loads to each diesel generator do not exceed the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating of 4000 kw.

10.

Verifying the diesel generator's capability to:

a)

Synchronize with the offsite power source while the generator is loaded with its emergency loads upon a simulated restoration of offsite power.

b)

Transfer its loads to the offsite power source, and c)

Be restored to its shutdown status.

11.

Verifying that the automatic load sequence timers are OPERABLE with the setpoint for each sequence timer within 5 percent of its design setpoint.

12.

Verifying that the following diesel generator lockout features prevent diesel generator starting only when required:

Y a)

Engine overspeed b) 86 GA lockout relay e.

At least once per 10 years or after any modifications which could affect diesel generator interdependence by starting the diesel generators simultaneously, during shutdown, and verifying that the diesel generators accelerate to at least 900 rpm in less than or equal to 10 seconds.

SEQUOYAH - UNIT 2 3/4 8-5 Amendment No. 22

.