Corrected Pages 3/4 3-12 & 3/4 7-5 to Amend 100 to License NPF-49
ML20078G247
Person / Time
Site: Millstone 
Issue date: 01/27/1995
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20078G234 List:
References
NUDOCS 9502030034
Download: ML20078G247 (2)


Text

.

'M i

2*

"O TABLE 4.3-1 (Continued)

DF >O M 08 REACTOR TRIP SfSTEM INSTRUNENTATION SURVEILLANCE REQUIRDENTS g Ru TRI?

04 ANALOG ACTUATING N00ES FOR

! o-88 CHANNEL DEVICE WHICH CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION SURVEILLANCE

'20 FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST LOGIC TEST IS REQUIRED u Eruu

18. Reactor Trip Breaker N.A.

N.A.

N.A.

N(7,11)

N.A.

2,3*,

g

19. Automatic Trip and N.A.

N.A.

N.A.

N.A.

N(7) 4,$*3*,

1 2 3

Interlock Logic

20. Three Loop Operation N.A.

N.A.

N.A.

R N.A.

1, 2 Bypass Circuitry NQ7RLIE)15) 4g,$*3*,

N.A.

I 2

21. Reactor Trip Bypass N.A.

N.A.

N.A.

Breaker

22. Shutdown Margin Monitor M.A.

N.A Q(19)

N.A.

N.A.

3,4,5 u.)

YG a

F s.

F' o

PUWIT SYSTEMS SURVEILLANCE REQUIRENENTS (Continued) b.

At least once per 92 days on a STAGGERED TEST BASI! by:

l 1)

Verifying that on recirculation flow each motor-driven pump l

develops a differential pressure of greater than or equal to 1460 psid when tested pursuant to Specification 4.0.5; 2)

Verifying that on recirculation flow the steam turbine-driven l

pump develops a differential pressure of greater than or equal to 1640 psid when the secondary steam supply pressure is greater than 800 psig. The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.

c.

At least once per 18 months during shutdown by verifying that each l

auxiliary feedwater pump starts as designed automatically upon receipt of an Auxiliary Feedwater Actuation test signal.

For the steam turbine-driven auxiliary feedwater pump, the provisions of Specification 4.0.4 are not applicable for entry into MODE 3.

4.7.1.2.2 An auxiliary feedwater flow path to each steam generator shall be demonstrated OPERABLE following each COLD SHUTDOWN of greater than 30 days prior to entering MODE 2 by verifying flow to each steam generator.

i l

MILLSTONE - UNIT 3 3/47-5 Amendment No. M, 100 0268

-. - - - -