ML20078G230
| ML20078G230 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/27/1995 |
| From: | Rooney V Office of Nuclear Reactor Regulation |
| To: | Opeka J CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20078G234 | List: |
| References | |
| GL-93-05, GL-93-5, TAC-M89653, NUDOCS 9502030026 | |
| Download: ML20078G230 (2) | |
Text
_
c# "49 5
g*.
t UNITED STATES g
j NUCLEAR REGULATORY COMMISSION o
2 WASHINGTON, D.C. 20606 4001 January 27, 1995 Mr. John F. Opeka Executive Vice President, Nuclear Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company Post Office Box 270 Hartford, CT 06141-0270
Dear Mr. Opeia:
SUBJECT:
CORRECTION TO AMENDMENT N0. 100 (TAC NO. M89653)
On January 3, 1995, the Commission issued Amendment No. 100 to Facility Operating License No. NPF-45 for the Millstone Nuclear Power Station, Unit 3, in response to your applicat.' ion dated June 2,1994, as supplemented August 25, 1994.
The amendment revised the Technical Specifications (TS) to remove expired one-time extensions of surveillance, removed an obsolete definition of charging pump o)erability, and incorporated 11 line item improvements in accordance with t1e guidance provided in Generic Letter 93-05. Several editorial changes were made to renumber TS pages and delete the blank pages from the TS.
It has been brought to our attention that TS pages 3/4 3-12 and 3/4 7-5 issued with Amendment 100 did not incorporate changes made by Amendments 79 and 96, respectively, faclosed are corrected TS pages 3/4 3-12 and 3/4 7-5.
We are sorry for any inconvenience this may have created.
Sincer r"
y Vernon L. Rooney, Sr. Project Manager Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-423
Enclosure:
Technical Specification Pages 3/4 3-12 and 3/4 7-5 cc w/ encl: See next page 9502030026 950127 PDR ADOCK 05000423
o 2
Mr. Joh'n F. Opeka-Millstone Nuclear Power Station Northeast Nuclear Energy Company Unit 3 cc:
Ms. L. M. Cuoco, Senior Nuclear Counsel Regional Administrator Northeast Utilities Service Company Region I Post Office Box 270 U.S. Nuclear Regulatory Commission Hartford, Connecticut 06141-0270 475 Allendale Road King of Prussia, Pennsylvania 19406 J. J. LaPlatney Haddam Neck Unit Director First Selectmen Connecticut Yankee Atomic Power Company Town of Waterford l
362 Injun Hollow Road Hall of Records i
East Hampton, Connecticut 06424-3099 200 Boston Post Road Waterford, Connecticut 06385 Kevin T. A. McCarthy, Director.
1 Monitoring and Radiation Division P. D. Swetland, Resident Inspector Department of Environmental Protection Millstone Nuclear Power Station 79 Elm Street c/o U.S. Nuclev Regulatory Commission 4
Hartford, Connecticut 06106-5127 Post Office Bo: W Niantic, Conneu.icut 06357 Allan Johanson, Assistant Director t
Office of Policy and Management Donald B. Miller, Jr.
Policy Development and Planning Division Senior Vice President 80 Washington Street Millstone Station Hartford, Connecticut 06106 Northeast Nuclear Energy Company Post Office Box 128 S. E. Scace, Vice President Waterford, Connecticut 06385 Nuclear Operations Services Northeast Utilities Service Company F. R. Dacimo, Nuclear Unit Director Post Office Box 128 Millstone Unit No. 3 Waterford, Connecticut 06385 Northeast Nuclear Energy Company l
Post Office Box 128 Nicholas S. Reynolds Waterford, Connecticut 06385 Winston & Strawn 1400 L Street, NW Burlington Electric Department
)
Washington, DC 20005-3502 c/o Robert E. Fletcher, Esq.
271 South Union Street R. M. Kacich, Director Burlington, Vermont 05402 Nuclear Planning, Licensing & Budgeting Northeast Utilities Service Company M. R. Scully, Executive Director Post Office Box 128 Connecticut Municipal Electric Waterford, Cadectkut 06385 Energy Cooperative 30 Stott Avenue I
J. M. Solymossy, Director Norwich, Connecticut 06360 Nuclear Quality and Assessment Services i
Northeast Utilities Service Company David W. Graham Post Office Box 128 Fuel Supply Planning Manager Waterford, Connecticut 06385 Massachusetts Municipal Wholesale Electric Company t
Post Office Box 426 Ludlow, Massachusetts 01056
.. -