e

$Vg, 31 [

T elephone (412) 393-6000 Nuclear Group P.O Don 4

$ruppingport, PA E07T4)OD4 November 7,1994 13eaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. MPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

In accordance with Appendix A,

Technical Specifications, the Monthly Operating Report is submitted for Unit I and Unit 2 for the month of October,1994.

Respectfully, T. P.

oonan Division Vice President, Nue: car Operations /

Plant Manager DTJhnmg linclosures cc: NRC Regional Office King of Prussia, PA TheNbMOfessionals 9411100204 941031

[DR ADOCK csooo334 L[I 8

PDR

!@PSATIVE SUMMAPJ OF 110tIIHLY OPERATIIK; EXPERIDICE UNIT 1 OCIOBER 1994 October 1 The Unit operated at a nominal value of 100% cLtput for the through entire report period.

October 31 c"%

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-334-UNIT BVPS Unit 1 DATE Nov. 2, 1994 COMPLEIID BY David T. Jones TEI2 PHONE (412) 393-7553

!Otml October 1994 DAY AVERAGE DAILY PbNER LEVEL DAY AVERAGE DAILY PCMER LEVEL

(!Ne-Net)

(MWe-Net) 1 808 17 826 2

821 18 825 3

825 19 829 4

833 20 817 5

825 21 825 6

825 22 813 7

816 23 813 8

825 24 833 9

813 25 833 10 829 26 833 11 821 27 821 12 815 28 817 13 821 29 825 14 825 30 816 15 821 31 829 16 817 INSTRUC110NS ori this fom, list the average daily unit power level MWe-Net for each day in the reporting renth. Compute to the nearest whole megawatt.

~.

=.

.~

OPERATING DATA REPORT DOCRET NO.:

50-334 REPORT DATE:

11/02/94 COMPLETED BY: DAVID T. JONES TELEPHONE:

(412) 393-7553 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: OCTOBER 1994
3. LICENSED THERMAL POWER (MWt):

2652

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

835

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

860

7. MAX. DEPENDABLE CAPACITY (Net MWe):

810

8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

745.0 7296.0 162192.0

12. NO. OF HRS REACTOR WAS CRITICAL:

745.0 5561.9 105092.8

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LINE:

745.0 5530.5 103073.7

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

1968574.0 14294322.0 247699798.5

17. GROSS ELECT. ENERGY GEN. (MWH):

648764.0 4670194.0 79827717.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

612684.0 4374874.0 74594394.0

19. UNIT SERVICE FACTOR: (PERCENT) 100.0 75.8 65.4
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 75.8 65.4
21. UNIT CAPACITY FACTOR (MDC): PCT 101.5 74.0 59.2
22. UNIT CAPACITY FACTOR (DER): PCT 98.5 71.8 57.5
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 24.2 16.3
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE.DATE,AND DURATION OF EACH):

THE UNIT IS SCHEDULED TO SHUTDOWN FOR ITS TENTH REFUELING OUTAGE ON E UARY 2.

1995.

THE REFUELING 037 AGE IS SCHEDULED TO IAST FOR 60 DAYS.

25. IF SHUT DOWN AT END OF REPOP.f PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

UNIT SHUTDOWh5 A4D POWER REDUCTIONS (220%)

Docket No.

50-334 Unit Name BVDS Unit #1 Date November 2 1994 Completed By David T.

Jones REPORT MONTH OCTOBER 1994 Telephone (412) 303-7553 Method of Licensee Duration Shutting Event System Component Action to Cause & Corrective No.

Date Typel (Hours)

Reason 2 Down Reactor 3 Report

  • Code 4 Codes Prevent Recurrence NONE 1

2 3

F-Forced Reason:

4 Method:

S-Scheduled A-Equipment failure (Explain) 1-Manual Exhibit F-Instructions for 2-Manual Scram Preparation of Data Entry Sheets B-Maintenance or Test C-Refueling for Licensee Event Report (LER) File 3-Automatic Scram D-Regulatory Restriction (NUREG0161).

4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction F-Administrative S

9-Other G-Operational Error (Explain)

Exhibit H-Same Source.

H-Other (Explain)

NARRATIVE SIEMARY OF l

MONIHLY OPERATING EXPERIH1CE UNIT 2 OCIOBER 1994 October 1

'Ihe Unit operated at a nominal value of 100% output for through the entire report pericd.

October 31 l

e

AVERAGE DAILY UNIT POWER LEVEL 4

DOCKET NO.

50-412 UNIT BVPS Unit 2 DATE Nov. 2, 1994 CCMPLEITD BY David T. Jones TELEPHONE (412) 393-7553 MOlmi October 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY FOWER LEVEL (MWe-Net)

(MWe-Net) 1 824 17 832 2

832 18 828 3

834 19 826 4

836 20 826 5

834 21 830 6

833 22 829 7

828 23 832 8

823 24 834 9

826 25 835 10 835 26 836 11 835 27 835 12 832 28 833 13 831 29 829 14 828 30 829 4

15 831 31 831 16 832 INSTRUCTIONS On this form, list the average daily unit power level MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

=-

OPERATING DATA REPORT DOCKET NO.:

50 412 REPORT DATE: -11/02/94 COMPLETED BY: DAVID T. JONES TELEPHONE:

(412) 393-7553 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: OCTOBER 1994
3. LICENSED THERMAL POWER (MWt):

2652 4 NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

870

7. MAX. DEPENDABLE CAPACITY (Net MWe):

820

8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE'

11. HOURS IN REPORTING PERIOD:

745.0 7296.0 60975.0

12. NO. OF RRS. REACTOR WAS CRITICAL:

745.0 7030.2 52360.5

13. REACIOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR WAS ON LINE:

745.0 7017.0 52013.6

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

1962873.0 18433237.0 128665122.0

17. CROSS ELECT. ENERGY GEN. (MWH):

651627.0 6118848.0 41770853.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

619062.0 5806125.0 39456404.0

19. UNIT SERVICE FACTOR: (PERCENT) 100.0 96.2 85.3
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 96.2 85.3
21. UNIT CAPACITY FACTOR (MDC): PCT 101.3 97.0 78.5
22. UNIT CAPACITY FACTOR (DER): PCT 99.4 95.2 77.4
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 3.8 3.1
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH)*

_Tff, UNIT IS SCHEDULED TO SHUTDOWN FOR ITS TIFTH REFUELING OUTAGE ON MARCH 24. 1995.

THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 60 DAYS.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i

l l

e UNIT ShuTD0uws AND power REDUCTIONS (12D%)

Dockat No.

50-412 Unit Name BVPS Unit #2 Date November 2. 1o94 Completed By David T.

Jones REPORT MONTH OCTOBER 1994 T elephone (412) 393-7553 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.

Date Typel (Hours)

Reason 2 Down Reactor 3 Report #

Code 4 Code 5 Prevent Recurrence kONE l

l l

l l

l l

l t

1 2

3 4

F-Forced Reason:

Method:

Exhibit F-Instructions for S-Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets B-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueling 3-Automatic Scram (NUREGD161).

D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam S-Reduction 5

F-Administrative 9-Other Exhibit H-Same Source.

G-Operational Error (Explain)

H-Other (Explain)

-._