V"" a m. 87... q;g PACIFIC GAS AND E LE C T RI C C O 2vIPANY . 2'

}bEb f 77 BEALE STREET . SAN FRANCISCO, CALIFORNIA 94106 - (415) 781 4211

  • TWX 910 372-6587
i. ~ -

cp ws ,, e .

[,W %%dm,W s *V

, * . @c@dD*\d% /,

September ' 27,. '198 3 '

f h,

00CKETED USNRC Chairman Nunzio J. Palladino U.S. Nuclear Regulatory Commission 1717 H Street, N.W. T3' SEP 27 Pi:37 Washington, DC 20555

. . . OmCE OF SECRtIF Commisstoner James K. Asselstine 00CXETitiG & SERV; .

Commissioner Frederick M. Bernthal BRANCH Commissioner Victor Gilinsky Commissioner Thomas M. Roberts

Dear Mr. Chairman and Commissioners:

This letter is to respectfully request that the Commission restore at the earliest possible time Pac'ific Cas and Electric Company's low-power license for Diablo Canyon 1:wer Plant in accordance with the three-step licensing process approved by the Commission on December 8, 1982. PGandE has complied fully with all requirements imposed by the Commission for loading fuel and proceeding with Step 1 of the three-step licensing process.

As you know, PGandE, in conjunction with Bechtel Power Corporation, has been engaged in a massive verification of the design of Diablo Canyon. This effort has involved the expenditure of over 1100 man years of intensive technical review. Additionally, the Independent Design Verification Program (IDVP) has expended over 125 man years in the performance of its verification activities.

Throughout this program, the Commission and the Staff have afforded intervenors the opportunity to file comments, participate in meetings and briefings, and otherwise become

involved in the process. Furthermore, they have received l copies of all significant documents generated by the l verification program including Interim Technical Reports l (ITR's), Final Reports and Staff SER's. In short, they have l participated in and provided input to the verification process.

i l

s 0309280275 830927 PDR ADOCK 05000275 -

G PDR

]

o 1

Chairman Nunzio J. Palladino September 27, 1983 Page 2

, On September 13, 1983, the Commission was briefed by the Staff

( and the IDVP on the status of the verification effort. During its presentation, the Staff recommended that the Commission restore the license subject to certain enumerated conditions.

We concur with that recommendation. At this time, all of the IDVP analytical work has been completed. All that remains is for the IDVP to verify that the committed work has been completed and issue Revisions to the applicable ITR's documenting completion of this work. The last of the ITR's are scheduled to be issued on October 4, 1983.

We do not believe that an additional comment period by the parties is warranted as a condition for reinstatement of our license and for completion of Step 1 of the three-step licensing process. In approving the three-step licensing process, the Commission clearly indicated that fuel loading and cold system-testing could occur before all activities of the verification program were completed.

Accordingly, we request that the Commission restore, in accordance with the Staff recommendation,' our authority to load fuel and allow us to proceed with the test activities authorized in Step 1 of the three-step licensing process. We expect that the plant will be ready for fuel load on or before October 22, 1983. We will, of course, not proceed with fuel loading until we are satisfied that the plant is ready in all respects for fuel loading.

A timely decision in this matter would be greatly appreciated.

i Sincerely,

/s/ G. A. Maneatis G.A. Maneatis Executive Vice President Facilities 6 Electric Resources Development GAM:gdb cc: Service List