ML20078C830
| ML20078C830 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 01/20/1995 |
| From: | Public Service Enterprise Group |
| To: | |
| Shared Package | |
| ML20078C817 | List: |
| References | |
| NUDOCS 9501270122 | |
| Download: ML20078C830 (2) | |
Text
...
j l
l l
l ATTACHMENT 2 TECHNICAL SPECIFICATION PAGES WITH PEN AND INK CHANGES LICENSE AMENDMENT APPLICATION REVISIOJ OF CONTROL ROD MOVEMENT TEST REQUIREMENT HOP 3 CREEK GENERATING STATION 1
FACILITY OPl. RATING LICENSE NPF-57 NLR-N94233 DOCKET NO. 50-354 LCR 94-33 1
l The following Technical Specification for Facility Operating License No. NPF-57 is affected by this License Amendment Request:
Technical Specification Pace 4.1.3.1.2.b 3/4 1-5 i
l l
1 l
l l
t 9501270122 950120 PDR ADDCK 05000354 P
4 REACTIVITY CONTROL SYS_TEMS i
SURVEILLANCE REQUIREMENTS (Continued) i electrically or hydraulically shall be demonstrated OPERABLE by moving each control red at least one notch:
1 At least once per 7 days, and b.
(At least once peh24 hours when any control rod is immovable as a p;gf9 result of excessive friction or mechanical interference.
j J
4.1.3.1.3 All control rods shall be demonstrated OPERABLE by performance of Surveillance Requirements 4.1. 3. 2, 4.1. 3. 4, 4.1. 3. 5, 4.1. 3. 6 and 4.1. 3. 7.
4.1.3.1.4 The scram discharge volume shall be determined OPERABLE by l
demonstrating:
j r,
The scram discharge volume drain and vent valves OPERABLE at least a.
once per 18 months, by verifying that the drain and vent valves:
3 Close within 30 seconds after receipt of a signal for control 1.
rods to scram, and 2.
Open when the scram signal is reset.
i h
t i
I i
I 4
HOPE CREEK 3/41-5 4