| Site: | Vogtle |
| Issue date: | 01/20/1995 |
| From: | Berkow H, Harold Denton Office of Nuclear Reactor Regulation |
| To: | City of Dalton, GA, Georgia Power Co, Municipal Electric Authority of Georgia, Oglethorpe Power Corp |
| Shared Package | |
| ML20078C420 | List: |
| References | |
| NPF-68-A-081 NUDOCS 9501260307 | |
| Download: ML20078C417 (5) | |
Text
r-v
]
$5 %q A
UNITED STATES E
E NUCLEAR REGULATORY COMMISSION f
WASHINGTON, D.C. 20066 4001
]
\\...../
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTH9RITY OF GEORGIA CITY OF DALTON. GEORGIA V0GTLE ELECTRIC GENERATING PLANT. UNIL1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 81 License No. NPF-68 1.
The Nuclear Regulatory Comission (the Commission) has found that:
A.
The application for amendment to the Vogtle Electric Generating Plant, Unit 1 (the facility) Facility Operating License No. NPF-68 filed by the Georgia Power Company, acting for itself, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia (the licensees), dated August 16, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Correnission's regulations and all applicable requirements have been satisfied.
I PDR
)
r.
4,
a l
2.
Accordingly, Facility Operating License No. NPF-68 is hereby amended by deletion of License Condition 2.C.(6) and the associated Attachmnt 1 of the license. The affected licensing pages are attached.
1 3.
The license amendment is effective as of the date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMISSION I
H rbert N. Berkow, Director Project Directorate 11-3 4
j Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Attachmeist:
l License pages 4, 7, and Date of Issuance: January 20, 1995 l
i
)
I i
f
)
~_
- )
J i
l '
\\
(4)
Emeraency Plannina (Section 13.3, SER and SSERs 2, 3, 4, and 5) j i
In the event that the NRC finds that the lack of progress in completion of the procedures in the Federal Emergency Management i
Agency's final rule, 44 CFR Part 350, is an indication that a i
major substantive problem exists in achieving or maintaining an adequate state of emergency preparedness, the provisions of 10 CFR j
Section 50.54(s)(2) will apply.
1 (5)
Steam Generator Tube Ruoture (Section 15.6.3, SER and SSER 3)
By March 1,1988, GPC shall submit for NRC review a revised plant-specific steam generator tube rupture analysis based on the i
Westinghouse Owner's Group generic resolution, which includes radiological consequence analyses, analysis of steamline static i
load in the event of overfill, and justification that systems and components credited in the analysis to mitigate accident consequences are safety related.
(6)
DELETED i
j (7)
NUREG-0737 Items a.
Compliance with NUREG-0737, Item II.F.2 (Section 4.4.8, SER and SSERs 1 and 4)
}
In accordance with NUREG-0737, Item II.F.2, GPC shall submit the proposed reactor vessel level instrumentation system (RVLIS) report by June 1, 1987.
b.
Supplemental Report on Safety Parameter Display System j
(Section 18.2, SSER 6)
GPC shall submit by March 1,1988, a supplemental report on l
the safety parameter display system as discussed in Section 18.2 of SSER 6.
c.
Supplemental Summary Report on Detailed Control Room Design Review (Section 18, SSER 5)
GPC shall submit by March 1,1988, a Supplemental Summary J
Report on the detailed control room design review discussing:
1.
the final results of the remaining control room surveys (ambient noise; illumination; heating, i
ventilation, and air conditioning; plant safety monitoring system computer survey; automatic turbine supervisory instrumentation computer survey; and communications) and the resolution of any human engineering discrepancies (HEDs) resulting from these surveys Amendment No. 81
'n I
l.
r,
t H.
Reporting to the Commission Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, GPC shall report any violations of the requirements contained in Section 2.C. of this license in the following manner:
initial notification shall be made within twenty-four (24) hours to the NRC Operations Center via the Emergency Notification System with written follow-up within 30 days in accordance with the procedures described in 10 CFR 50.73(b), (c), and (e).
I.
The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall. require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
J.
This license is effective as of the date of issuance and shall expire at midnight on January 16, 2027.
FOR THE NUCLEAR REGULATORY COMISSION ORIGINAL SIGNED BY:
Harold R. Denton, Director Office of Nuclear Reactor Regulation Enclosures-l
- 1. - DELETED 2.
Appendix A - Technical Specifications 3.
Appendix B - Environmental Protection Plan 4.
Appendix C - Antitrust Conditions Date of Issuance:
March 16, 1987 i
l i
Amendment No. 81
l) 1o 1
i i
l ATTACHMENT 1 TO LICENSE NPF-61 1
TDI DIESEL ENGINE REQUIREMENTS t
l (DELETED) j I
1 l
i i
I d
i 1
i e
i i
i 1
J t
1 1
s 4
4 4
.i i
1 1
4 i
i A
l 1
i l
1 i
i i
kp 1
i Amendment No. 81 i
J
.,, -.,,. _,,..,.,,,,.,,. -.