THE TOLEDO EDISON COMPANY
(
DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PLAN SUPPORTING PROCEDURES I
REVISION INDEX P_ age, Revision Procedures Revision Temporary Modification a
i 7
HP 1604.02 0
AD 1827.01 4
AD 1827.04 2
AD 1827.05 2
AD 1827.06 2
T-7248 AD 1827.07 3
AD 1827.08 2
AD 1827.09 2
AD 1C97.15 5
1 b/
AD 1827.16 2
AD 1827.17 5
AD 1850.04 6
AD 1850.05 7
AD 1850.06 2
T-7399 Administrative Memorandums Revision No. 37 ECS Pager and Telephone Numbers 30 No. 38 First Aid Team 12 No. 39 Fire Brigade 16 No. 41 Emergency Duty Officer (EDO) 28 No. 42 Radiation Monitoring Teams (RMT) 19 n
Revision 189
,I 4
September, 1983 Yi 8309270502 830919 PDR ADOCK 05000346 F
~
I TRl1UTioN
(
original, Responsible Section Head Action
/
_ File Copy, Mester File i
COPIES To BE MODIFIED FoR IMMEDIATE IMPLEMENTATION DAVIS BESSE NUCLEAR POWER STATION - UNIT 1 Technical Support Center TEMPORARY MODIFICATION REQUEST
, ED 6926 SECTION 1 PROCEDURE TITLE AND NUMBER Radiation, Containment & Airborne Radioactivity Monitoring During Emergencies at the REASON FoR CHANGE Davis-Besse Administration Building (DBAB)
AD 1850.06 NRC Connnitment, as per Toledo Edison response dated June 21, 1983 (Serial No. 1-358).
CHANGE (3
/
Page 3:
)
Add Section: 3.4.5 The Radeon Operations Manager (located in the Technical Support Center) shall, during radiological emergencies, ensure that personnel assigned to the Control Room and Operations Support Center are issued self-reading dosimetry as well as TLD's.
Qgg gg IS PROCEDURE REVISloN REQUIRED 64 6 :st, !
PREPARED BY DATE Ron Durdel 8/29/83
^
yL g-py_g3 j
APPROVED BY k l
DATE LJfituu I 9 2% 85 g)
SUBMITTED BY (
tion H
)
DATE PV 8
s/so /e3 RECOMMENDED BY (SRB Chelrman)
DATE ww
- 8) wl* a i
J oA APP o D (Men of Quellty A ence)
DATE l
l APPROVED BY (Station Superintendent)
OATE D
L/D
I DAVIS-BESSE REVISION COVER SHEET September 2, 1983 DATE l
/ d t.) 4d' 12./2 b TO:
FROM: E1ERC CY PLANNING & PREPAREDNESS SUPV.
1
SUBJECT:
Davis-Bessa EMERGENCY PLAN SUPPORTING PROCEDURES Manual Changes This letter transmits additions and revisions to the Davis-Besse Control Copy 8 d.
EMERGENCY PLAN SUPPORTING PROCEDURES Manual.
Instructions for the material are as follows:
REMOVE AND RETURN INSERT Revision Index, Revision 188 Revision Index, Revision 189 T-7399 in front of AD 1850.06 Date Revision Entered Addressee Signature RETURN TO THE OFFICE MANAGER STOP #3050
)(0*$
\\
ll>-
m__.._..
_ = _ _..
m, I'
THE TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PLAN SUPPORTING PROCEDURES REVISION INDEX Page Revision Procedures Revision Temporary Modification a
i 7
HP 1604.02 0
i AD 1827.01 4
AD 1827.04 2
AD 1827.05 2
AD 1827.06 2
T-7248 AD 1827.07 3
AD 1827.08 2
AD 1827.09 2
AD 1827.15 5
AD 1827.16 2
AD 1827.17 5
AD 1850.04 6
AD 1850.05 7
AD 1850.06 2
T-7399 Administrative Memorandums Revision No. 37 ECS Pager and Telephone Numbers 30 No. 38 First Aid Team 12 No. 39 Fire Brigade 16 No. 41 Emergency Duty Officer (EDO) 28 No. 42 Radiation Monitoring Teams (RMT) 19 t
Revision 189 September, 1983 I
\\
S6
)( O o I
~
.. a n...
ll TRIOUTION
~
origines., Responsible Section Head Action 9m
_ P,,. c.... M.- P,,.
COPIES TO BE MODIPIED PoR IMMEDI ATE IMPL5 MENTATION DAVIS BESSE NUCLEAR POWER STATION. UNIT 1 Technical Support Center TEMPORARY MODIFICATION REQUEST
, ED seas SECTION 1 PROCEDURE TITLE AND NUMBER Radiation, Containment & Airborne Radioactivity Monitoring During Emergencies at the REASON POR CHANGE Davis-Besse Administration Building (DBAB)
AD 1830.06 NRC Commitment, as per Toledo Edison response dated June 21, 1983 (Serial No. 1-358).
- ""' Page 3:
Add Section: 3.4.5 The Radeon Operations Manager (located in the Technical Support Center) shall, during radiological emergencies, ensure that personnel assigned to the Control Room and Operations Support Center are issued self-reading dosimetry as well as TLD's.
I f
f Q
{ ggg IS PROCEDURE REVISION REQUIRED w L:n,!
PREPARED 8Y DATE Ron Durdel 8/29/83 APPROVED BY DATE APPROVED 8Y DATE (1ruu T 2( 85 SUBMITTED BY (
on H
)
DATE 8
s/3o /e3 RECOMMENDED BY (SRS Chairman)
DATE l
f
)
b
[,lqf ^^' Y j '" N j 'f &
- " 9/y/g3 APPROVED BY (Stetton Superintendent)
DATE hW ' ' ' a U.3' D
DAVIS-BESSE REVISION COVER SHEET September 2, 1983 DATE I
l lhi ) 6-/ $$ 6 TO:
O FROM. EMERGENCY PLANNING & PREPAREDNESS SUPV.
SUBJECT:
Davis-Besse EMERGENCY PLAN SUPPORTING PROCEDURES Manual Changes This letter transmits additions and revisions to the Davis-Besse EMERGENCY PLAN SUPPORTING PROCEDURES Manual.
Control Copy 8 N.
i Instructions for the material are as follows:
REMOVE AND RETURN INSERT Revision Index, Revision 188 Revision Index, Revision 189
(
T-7399 in front of AD 1850.06 i
I Date Revision Entered Addressee Signature cof RETURN TO THE OFFICE MANAGER - STOP #3050 s
.-