PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

-b. At least once per 92 days by verifying that a sample of diesel fuel '

from the fuel storage tank, obtained in accordance with ASTM-D270-65, is within the acceptable limits specified in Table 1 of ASTM D975-74 when checked for viscosity, water and sediment.

E

c. At least once per 18 months, " " , 2 _^ t , by subjecting the l diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for the class of service.

4.7.11.1.3 The fire pump diesel starting 24-vol. battery bank and charger shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying that: ,
1. The electrolyte level of each battery is above the plates, and
2. The overall battery voltage is greater than or equal to 24 volts.
b. At least once per 92 days by verifying that the specific
  • gravity is y appropriate for continued service of the battery.
c. At least once per 18 months by verifying that:

1.

The batteries, cell olates and battery racks show no visual indication of physical damage or abnormal detarieration, and

2. The battery-to-battery and terminal connections are clean, l tight, free of corrosion and coated with anti-corrosion I

material.

l .

i n

8309270250 830826 PDR ADOCK 05000348 P PDR FARLEY-UNIT 1 3/4 7-84 AMENDMENT NO.

PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

b. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank, obtained in accordance with ASTM-D270-65, is within the acceptable limits specified in Table 1 of ASTM D975-74 when checked for viscosity, water and sediment,
c. At least once per 18 months, f_:' ; :r_ti , by subjecting the l diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for the class of service.

4.7.11.1.3 The fire pump diesel starting 24-volt battery bank and charger shall be demonstrated OPERABLE:

a. At least once per 7 days by verifying that:
1. The electrolyte level of each battery is above the plates, and
2. The overall battery voltage is greater than or equal to 24 volts.
b. At least once per 92 days by verifying that the specific gravity is appropriate for continued service of the battery.
c. At least once per 18 months by verifying that:
1. The batteries, cell plates and battery racks show no visual indication of physical damage or abnormal deterioration, and i
2. The battery-to-battery and terminal connections are clean,

' tight, free of corrosion and coated with anti-corrosion material.

l l

h 1

l FARLEY-UNIT 2 3/4 7-51 f

. .o TABLE 3.7-5

( LIST OF SPRINKLER SYSTEMS Location Sprinkler e (Room No.) Description Elevation System 1'

2160 Hatch Area 100'-0" 2A-25 2161 South Corridor 100'-0" 2A-25 2172 Hallway 100'-0" 2A-101 2175 Hallway 100'-0" 2A-118 2135 CCW Heat Exchanger and Pump Room 100'-0" 2A-27 2190 MCC Panel Room 100'-0" 2A-62 2209 Hallway 121'-0" 2A-35 2210 -South Corridor 121'-0" 2A-36 2223 Mechanical Penetration Room 121'-0" 2A-45 2227 West Cable Chase 128'-0" 2A-23 2244 Mezzanine 131'-0" 2A-36 2245 Mezzanine 131'-0" 2A-36 2300 West Cable Chase 139'-0" 2A-23 2312 Corridor 139'-0" 2A-48 2316 Corridor 139'-0" 2A-48 2318 Cable Spreading Room 139'-0" 2A-43 2319 West Corridor 139'-0" 2A-59 2452 Clean Storage Area 155'-0" eenter2A-52 l 2462 Non-Radioactive Vent Equipment 155'-0" 2A-51 Room

[. 155'-0" 2A-23

\ 2466 West Cable Chase 2500 West Cable Chase 168'-2" 2A-23 FARLEY-UNIT 2 3/4 7-57

TABLE 3.7-6

(

LIST OF FIRE HOSE STATIONS 40XI!ia g 30ild'iAC l LOCATION (Room No.) ELEVATION C HOSE CABINET NO.

2103 83'-0" N2V43-D-103 2110 83'-0" N2V43-D-102 2161 100'-0" N2V43-D-110 2163 100'-0" N2V43-D-109 2184 100'-0" N2V43-D-124 2185 100'-0" N2V43-D-108 2186 100'-0" N2V43-D-131 2189 100'-0" N2V43-D-107 2208 121'-0" N2V43-D-128 2209 121'-0" N2V43-D-104 2210 121'-0" N2V43-D-126 2223 121'-0" N2V43-D-127 2234 121'-0" N2V43-D-125 2237 121'-0" N2V43-D-132 2312 139'-0" N2V43-D-114 2316 139'-0" N2V43-D-111 2319 139'-0" N2V43-D-116 2319 139'-0" N2V43-D-119

( 2332 139'-0" N2V43-D-113

\ 2334 139'-0" N2V43-D-117 2345 139'-0" N2V43-D-112 2404 155'-0" N2V43-D-122 2408 155'-0" N2V43-D-123 2446 155'-0" N2V43-D-105 2452 155'-0" N2V43-D-120 2452 155'-0" N2V43-D-121 2462 155'-0" N2V43-D-106 2502 175'-0" N2V43-D-101 2505 184'-0" N2V43-D-100 2602 139'-0" N2V43-D,-118 Aud{iag$(dig thhj GWrM BdId'ig Tonn& t Tm'm A Tmd Trdn B Tunned Bee Gbindl nose G66ek No.

N 2Y 43bcol P N2Y93DMIX N2Y 93'D 001 A N 2'( 43Dool 7 N 2.Y 43 Dm t T N2Y 43V eo1 B N1Y 43 bool K N1Y 43 DoolQ N 2V 43pcolTR N 2493 EcolZ N 2.'l g 3 D c ol c_ Ng,y q37)ooi t N1143m2. A 91Y 43D oo1 D M 2Y 43 Dool S N1143Dool M sty 93Dm2_ s N2Y 93 Dool T gfy It h NCY 93 booi N P32Y 93tml u.

( n 2.-/ 43D 00 i G N2Y 93 Tml V NW 43D %1H N2N 43 Dcol N FARLEY-UNIT 2 3/4 7-61