ML20078B589
| ML20078B589 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 09/30/1994 |
| From: | Hutchinson C, Lin S ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GNRO-94-00125, GNRO-94-125, NUDOCS 9410260129 | |
| Download: ML20078B589 (5) | |
Text
. _ _ _ _ _ _ _ _ - _.
.e
= ENTERGY
""n2' ?~"""*' '"*'
P <1 Gnat US 39150 t
Te. 601437 2ffl()
C, R. Hutchin soi;
, t n.
4
(\\ i:r:
October 14, 1994 m: w-v %
U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C. 20555 Attention:
Document Control Desk
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-94/00125 Gentlemen:
In accordance with the requirement of Technical Specification 6.9.1.10, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for September 1994, if you have any questions or require additional information, please contact this office.
You truly, HgMC ents:
1.
Operating Status 2.
Average Daily Power Level 3.
Unit Shutdown and Power Reductions cc:
(See Next Page)
J f
- 4 A
N b# VLb g
9410260129 940930 PDR ADOCK 05000416 k i R
Octobe.r 14, 1994 GNRO-94/00125 Page 2 of 3 l
cc:
Mr. R. H. Bembard (w/a)
Mr. D. C. Hintz (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. Stewart D. Ebneter (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region li 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. P. W. O'Connor, Project Manager i
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 i
Washington, D.C. 20555
_ - - _ _ _ to GNRO-94/00125 DOCKET NO 50-416 DATE 10/06/94 COMPLETED BY S. D. Lin TELEPHONE (601) 437-6793 OPERATING STATUS 1.
Unit Name: GGNS UNIT 1 2.
Reporting Period: Seotember 1994 3.
Licensed Thermal Power (MWt): 3833 MWT 4.
Nameplate Rating (Gross MWe): 1372.5 MWE 5.
Design Electrical Rating (Net MWe): 1250 MWE 6.
Maximum Dependable Capacity (Gross MWe): 1190 MWE 7.
Maximum Dependable Capacity (Net MWe): 1143 MWE 8.
If changes occur in Capacity Ratings (items 3 through 7) Since Last Report. Give Reason:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A j
This Month Yr to Date Cumulative
- 11. Hours in Reporting Period 720 6.551 87.207
- 12. Number of Hours Reactorwas Critical 720.0 6.284.7 70.971.4
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 675.8 6.123.2 68.183.1
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2.495.629 22.826.762 240.644.333
- 17. Gross Electrical Energy Generated (MWH) 791.700 7.350,243 76.657.747
- 18. Net Electrical Energy Generated (MWH) 759.082 7.056.918 73.428.305
- 19. Unit Service Factor 93.9 93.5 80.3
- 20. Unit Availability Factor 93.9 93.5 80.3
- 21. Unit Capacity Factor (Using MDC Net) 92.2 94.3 77.7
- 22. Unit Capacity Factor (Using DER Net) 84.3 86.2 70.6
- 23. Unit Forced Outage Rate 6.1 6.5 6.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation).
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85
I
', to GNRO-94/00125 DOCKET NO 50-416 DATE 10/06/94 COMPLETED BY S.D.Lin TELEPHONE (601) 437-6793 1
MONTH September 1994
)
l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL j
(MWe-Net)
(MWe-Net) l 1
0 17 1175
(
2 421 18 1183 3
1144 19 1187 4
1086 20 1182 5
1164 21 1183 6
1141 22 1180 7
1164 23 1197 8
1171 24 1127 9
1172 25 1198 10 1159 26 1188 11 137 27 1180 12 774 28 1179 13 1144 29 1175 14 1128 30 1178 15 1177 31 N/A 16 1135
e
.. u 1 to GNRO-94/00s25-UNIT SIIUTDOWNS AND POWER REDUCTIONS t
l l
DOCKET NO.
50-416 l
UNIT NAME GGNS Unit 1 DATE 10/06/94 COMPLETED BY S. D. Lin TELEPilONE (6011437-6793 REPORT MONTH September 1994 No.
Date Type (1)
Duratiort Reason Method Of Licensee System Code Component Cause & Corrective Action To Hours (2)
Shutting Event Report #
(4)
Code Prevent Recurrence (C&CA)
Dowr. Reactor (5)
(3)94-007 940824 F
28.7 A
4 NA NA NA Reactor remained shut down for work on main generator coohng water pipes to obtain generator balance.
94 008 940911 F
0 A
6 NA NA NA Reactor power reduced to approximately 10% to take main generator offline for repairing ground-r'ault detection wiring damaged by fallen lighting fixture.
I 2
3 4
5 F: Forced Reason:
Method:
Exlubit G - Instructions for Preparation of Exhibit 1 - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG-0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continced E-Operator Training &
5-Reduced load Licensing Examination 6-Other F-Administrative G-Operational Error (Explain)
H-Other (Explain)
-.