ML20078A695

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Matl Traceability of 1R72 Sys Class IE Electrical Penetrations.Initially Reported on 830824.Twenty-six Penetrations Contain Bulkhead Matl Which May Not Meet Procurement Requirements.Next Rept by 831202
ML20078A695
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 09/15/1983
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, RDC-81(82), NUDOCS 8309230378
Download: ML20078A695 (2)


Text

-

~1p 4

.s t ',

s i L in

,1 1 :. . i g5g

  • m -

.m e

  • O ,i i t g ,  !

P.o. box 5000 . CLEVELAND. OHIO 44101 - TELEPHONE (216) 622-9800 - tLLUMINATING BLDG. - 55 PUBLIC SoVARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCLEAR September 15, 1983 Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuc1 car Power Plant Docket Nos. 50-440; 50-441 1k72 System Electrical Penetrations Supplied by Westinghouse Electric Corporation [RDC 81(82)]

Dear Mr. Keppler:

This letter serves as the interim report pursuant to 10CFR50.55(e) concerning material traceability for the IR72 System Class 1E Electrical Penetrations furnished by Westinghouse Electric Corporation. Mr. J. Konklin of your office was notified on August 24, 1983, by Mr. E. Riley of The Cleveland Electric Illuminating Company that this problem was being evaluated. This report contains a description of the deficiency and measures being taken to complete our evaluation for significance.

Description of Deficiency Westinghouse Electric Corporation supplied Class IE electrical penetrations to the Perry Nuclear Power Plant (PNPP) under procurement specification 563.

This specification requires that materials for pressure retaining parts of the electrical assembly be in accordance with ASME Section III, Subsection NE. It has been identified that twenty-six penetrations contain bulkhead material which may not meet procurement requirements of ASME Section III as required.

Completion of Reportability Evaluation Further investigation is required to determine a disposition. At present, a September 21, 1983, meeting has been scheduled with the Westinghouse Electric Corporation subvendor from which the subject material was procured. Results of the meeting will determine further course of action.

8309230378 830915 PDR ADOCK 05000440 PDR S SEP 191983 10

r

, ~.

Mr. Jamea G._K;ppler. Szpterbar 15, 1983 We are presently planning to submit our final report on this subject by December 2, 1983.

Please call if there are any additional questions.

Sincerely, Murray R.

[

.delman f Tb Vice President Nuclear Group MRE:pab cc: Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 U.S. Nuclear Regulatory Commission c/o Document . Management Branch Washington, D.C. 20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 l