Text
g-Ent:rgy optretioni,Inc.
_ NNTERGY r
eo.ao 7se Pcet Gbson.MS 39150 Te; 601437 2800 C. R. Hutchinson Vce Pres +nt Orcrate r; Oryd G# tArAv Stavo January 13, 1995 U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C. 20555 Attention:
Document Control Desk
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-95/00006 Gentlemen:
In accordance with the requirement of Technical Specif. cation 6.9.1.10, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for December 1994.
If you have any questions or require ad 'tional information, please contact this office.
Yours truly
/
S-CR C
attachments:
1.
Operating Status 2.
Average Daily Power Level 3.
Unit Shutdown and Power Reductions cc:
(See Next Page)
._r
-4 x
9501230289 941231
\\
PDR ADDCK 05000416
\\
.R PDR
~
. ]
Attachmsnt 1 to GNRO-95/OOOO6 DOCKET NO 50-418 V
.DATE 01/11/95 COMPLETED BY S. D. Lin TELEPHONE (601) 437-8793 l
1 OPERATING STATUS I
1.
Unit Name: GGNS UNIT 1 2.
Reporting Period: December 1994 3.
Licensed Thermal Power (MWt): 3833 MWT 4.
Nameplate Rating (Gross MWe): 1372.5 MWE f
5.
Design Electrical Rating (Net MWe): 1250 MWE
- 6. ' Maximum Dependable Capacity (Gross MWe): 1190 MWE 7.
Maximum Dependable Capacity (Net MWe): 1143 MWE 8.
If changes occur in Capacity Ratings (Items 3 through 7) Since Last Report. Give Reason:
N/A 9.
Power Level To Which Restricted, if Any (Net MWe):
N/A l
- 10. Reasons For Restrictions, if Any:
N/A This Month Yr to Date Cumulative
- 11. Hours in Reporting Period 744 8.760 89.418 l
- 12. ?? umber of Hours Reactor was Critical 744.0 8.464.5 73.151.1
- 13..-sactor Reserve Shutdown Hours O
O O
- 14. Hours Generator On-Line 744.0 8.286.5 70.348.4
- 15. Unit Reserve Shutdown Hours O
O O
- 16. Gross Thermal Energy Generated (MWH) 2.845.051 31.043.457 248.843.495 1
- 17. Gross Electrical Energy Ganerated (MWH) 932.150 10.013.995 79.321.499
- 18. Net Electrical Energy Generated (MWH) 895.417 9.614.754 75.988.141
- 19. Unit Service Factor 100.0 94.6 80.8
- 20. Unit Availability Factor 100.0 94.6 80.8
- 21. Unit Capacity Factor (Using MDC Net) 105.3 9E.O 78.4 l
- 22. Unit Capacity Factor (Using DER Net) 98.3 87.8 71.2
- 23. Unit Forced Outage Rate 0.0 5.4 8 4._
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Bgfueling Outaas # 7 beginnina on 04/15/94 @ 0000 hour0 days <br />0 hours <br />0 weeks <br />0 months <br /> for a duration of 40 davs i
- 25. If Shut Down At End of Report Period. Estimated Date of Startup-
- 26. Units in Test Status (Prior to Commercial Operation).
Forecast Achievnd INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84-COMMERCIAL OPERATION 07/01/85 l
.7 Attachmsnt 2 to GNRO-95/OOOO6 DOCKET NO 50-418 DATE 01/11/95 COMPLETED LY S. D. Lin TELEPHONE (6011 437-8793 MONTH December 1994 t
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
?
1 1210 17 1199 2
1205 18 1211 3
1188 19 1212 4
1195 20 1204 5
1195 21 1201 0
1200 22 1208 s
7 1187 23 1210 8
1183 24 1204 9
1190 25 1217 10 1191 26 1215 i
11 1219 27 1210
)
12 1221 28 1204 13 1214 29 1202
{
14 1209 30 1201 15 1203 31 1204 16 1198 1
- to GNRO-954)0006 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-416 UNIT NAME GGNS Unit I DATE 01/11/95 COMPLETED BY S. D. Lin TELEPHONE (601M37-6793 REPORT MONT11 December 1994 No.
Date Type (1)
Duration Reason Method Of Licensee System Code Component Cause & Corrective Action To Hours (2)
Shutting Down Event Report #
(4)
Code Prevent Recurrence (C&CA)
Reactor (5)
(3) lNone l
l l
l l
l l
[
l 2
3 4
5 F: Forced Reason:
Method:
Exhibit G - Instructions for Preparation of Exhibit 1 - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG-0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Training &
5-Reduced load Licensing Examination 6-Other F-4dministrative usWtional Error (Explain)
H-Other (Explain) l l
E--- ---- - -- ----- -- ---..---
- -