ML20077Q196
| ML20077Q196 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 07/31/1991 |
| From: | Blosser J, Mccann R UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| ULNRC-2462, NUDOCS 9108210111 | |
| Download: ML20077Q196 (6) | |
Text
__-___ _____ _ ______ - ___ _ __ _ _ _ _ _ _
c,ba,= Pun!
r u o?!s n.c Fuu t/~
- e.
August 6, 1991 I
Uwox E,uzenue a
Nuclear Regulatory Commission 1-Document Control Desk j
Washington, DC 20555 a
t ULNRC-2462 i
4 l
Dear Sir:
e a
DOCKET NUMBER 50 483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTilLY OPERATING REPORT JULY 1991 The enclosed Monthly Operating Report for July, 1991 is submitted i
j pur:uant to section 6,9.1.8 of the Callaway Unit 1 Technical Specifications, 1
l Yst D, Blosser Manager, Callaway Plant hpty <1pYtG" JDB/DEY/RDA/1AM/RJM/ crc Enclosure cc:
Distribution attached 9108210111 910731
{DR ADOCK 050004s3
/
\\
k
1
+
=
. cc distribution for ULNRC. 2462 '
with enclosures Mr.. Richard Hague, Chief Project Section lA U. S. Nuclear Regulatory Commission Region III
-799 Roosevelt Road Glen Ellyn, IL 60137
- Mr. M.-D. Lynch (2 copies)
- Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 1 White' Flint, _ North, Mail Stop 13E21 11555 Rockville, MD 20852.
NRC Resident Inspector Manager, Electric Department
. Missouri:Public Service Commission P.O. Box 360 Jefferson City, MO 65102 y
1 i
l
. ~.. -... - -,. _. _ _ _ _ _..., _ _,..
. ~,
... ~. - -. -.. -. ~..
~. ~....
_. ~.. -
+. -
-1 1
DOCKET NO.'
-50 483 UNIT NAME CALLAWAY UNIT 1 DATE.
8-06-91 L
COMPLETED BY R. J. McCann TELEPHONE 314/676-8243
'PART A.
OPERATIONS
SUMMARY
The plant operated at approximately 100% power for the entire month with.
the following exceptions.
On 7/8/91, load was reduced to 80% to replace condencate pump seal water return hoses. Full power operation resumed on 7/9/91.
On 7/13/91, load was reduced to 84% to repair the mechanical seal flange on the
'A' condensate pump. Full power operation resumed on 7/14/91.
PART B PORV_AND SAFETY VALVE
SUMMARY
None l.
l-I' Page 1 of 4
~
... - ~ - -..
.. - ~... _. - _ ~. - -...
.~..-c
-... _ ~ - -... ~.. -
W'
[
t PADT C
~
AVERAGE DAILY UNIT POWER LEVEL
);
DOCKET No 50-483 UNIT Callaway Unit 1-DATE 8 06,
j' COMPLETED BY.
R. J. McCann I
i TELEPHONE 314/676-8243 t
2 l
MONTH: JULY 1991 h.
AVERACE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe) t
)
1 1120 17 1147 l:
2 1140 18 1146 i
l_
3
'1149 19 1140 4
1150 20 1124 4
7 l
5 1135 21 1127 6
1100 22 1120 i'
}-
7 1117 23 1141 4.
8 1139 24 1157
[.-
9 1118 25
-1156 10 1143 26 1157 i.
11 1138 27 1151' L
r-12
-1140 28 1131 13 987 29 1153 I'
14
'1058 30 1155 i
11 5 1150 31
-1148
-16 1151 e
i 1
~
J-i l'
i Page 2 of 4 i
i
{.-
1.
I-Part D OPERATING DATA REPORT DOCKET NO.
50 483 UNIT NAME CALIMAY UNIT 1 DATE 8-06-91 COMPLETED =BY R. J. McCANN TELEPil0NE 314/676-8243 OPERATING STATUS (11Q M) 1.
REPORTlkG PERIOD July 1991 GROSS HOURS IN REPORTING PER100: 744 5087 57,948.5 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-het): 1125 DESIGN ELECTRICAL RATING (MWe-Net): 1171 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe Net):
?
4 REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL.....
744.0 5087.0 50,432.4 6.
REACTOR RESERVE SHUTDOWN HOURS...........
0 0
0 7.
HOURS GENERATOR ON LINE..................
744,0 5087.0 49,210.2 8.
UNIT RESERVE SHUTDOWN HOURS..............
0 0
0
- 9.. GROSS THERMAL ENERGY GENERATED (MWH).....
2,592,727 17,879,913 163,767,508
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH).
882,734 6,141,524:
55,753,105
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)...
841,995 5,867,290 52,967,467 12.' REACTOR SERVICE FACTOR...................
100,0 100.0 87.0 t
i
- 13. REACTOR AVAILABILITY FACTOR..............
100.0 -
100.0 87.0
- 14. UNIT SERVICE FACT 0R......................
100.0 100.0 84.9
- 15. UNIT AVAILABILITY FACTOR.................
100.0 100.0 B4.9 l
- 16. UNIT CAPACITY FACTOR (Using MDC).........
100.6 102.5 81.2 l
[-
- 17. UNIT CAPACITY FACTOR (Usino Design MWe)..
96.6 98.5 78.1 l
- 18. UNIT FORCED OUTAGE RATE..................
0.0 0.0 3.1
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 20. D SHUY DOWN AT END GF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
j Page 3 of 4 I
PART E UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKEl NO.
50-483 UNIT MAME CALLAWAY UNIT 1 DATE 8-06-91 COMPLETED BY R. J. McCann TELEPHONE 314/676-8243 e
i REPORT MONTH: JULY 1991 F
METHOD OF T (PE SHUTTING DOWN t
F: FORCED DURATION THE REACTOR OR No.
DATE S: SCHEDULED tHOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS /CDMMENTS t
7 7/08/91
.S
,O B
1 On 7/08/91, load was reduced to 80% to replace condensate purp seat water return hoses. Full power operation restsned i
on 7/9/91.
8 7/13/91 s
0 8
1 On 7/13/91, toad was reduced to 84% to repair the mechanicat l
seat flange on the
'A' condansate ptsnp. Full power operation i
resumed on 7/14/91.
SUMMARY
l REASON METH00 A: EQUIPMEtn FAILURE (EXPLAIN) 1: MANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C. REFUELING 3: AUTOMATIC SCRAM
- l D: REGULATORY RESTRICTION 4: OTHER (EXPLAIN)
[
E: OPERATOR TRAINING AND LICENSE EXAMINATION j.
F: ADMINISTRATIVE G: OPERA 110NAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN) 1 l
'i i
Page 4 of 4 1