ML20077Q085
| ML20077Q085 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 07/31/1991 |
| From: | Denton R, Shanley L BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9108210054 | |
| Download: ML20077Q085 (12) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - - - - _
l s
f4 ALT IMORE OASAND ELECTRIC l
CHARLES CENT ER
- P O. BOX 1475
- BALTIMORE, MARYLAND 21203 1475 R L OLN10N osm % uANAoisi cui m c""$
August 13,1991 U.S. Nuclear Regulatory Commission Washington, DC 20555 A'ITENTION: Document Control Desk SUlijECT:
Calvert Cliffs Nuclear Power Plant Units 1 & 2; Dockets 50-317 and 50 318 July 1991 Oncratine Data Rermrts Gentlemen:
The subject reports are being sent to you as required by Technical Specification 6.9.1.6. Should you have any further questions regarding this matter, please contact Bruce hirowca at (301) 260-3989.
'e truly yours, l
?
3 S
RED /LBS/reu Attachments ec:
D. A. Brune, Esquire J. E. Silberg, Esquire R. A. Capra, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC R.1. McLean, DNR R.11artfield, NRC l
J. Wheelock, INPO l
J. II. Walter i
Resident inspector, NRC
,cc i
,, A v U 4 ' t 9108210039 'po?M,
ply; ADoct v500031e
[g 2f p
PDR l
li. S. Nuclear Regulatory Commission Augugt 13,1991
, Page 2 of 2 l
bec: J. A. Tiernan/A. J. Slusark C.11. Cruse P. E. Katz R. P. lleibel T. N. Pritchett bl. J. hilernicki W. A.'thornton bl. Gavrilas E.1. Bauereis R.11. Pond, Jr.
S.11. Buxbaum. Jr.
C. C. Lawterce, til A. R. Thornton.
L B. Russell J. R. lx mons R. hl. Douglass R. F. Ash W. R. Corcoran R. E. Denton R. C. DeYoung C. P. Johnson J. J. Connolly F. J. hiunno R. E. Nagel E. K. Dewley J. E. Ringsdorf, Jr.
J. F lehr P. G. Chabot/B.11. hirowca P. A. File /K. J. Allor
- 1. A. Liberatore/C. Behnke
- 13. S. hiontgomery D. Song G. L Adams A. B. Anuje G. l Detter G. J. Falibota L D, Graber D. V. Graf L O, Wenger P. A. Pieringer J.E.Daum
=
R. C. Jahr. son (2)
R. C. L Olsen F.Yost Technical Librarian File
i ese*************************************************************************
l
. UNIT 1 OPERATING DATA REPORT j
Docket No. 50-317 August 13, 1991 Prepared by Leo Shanloy Telephonet(301)260-6744 OPERATIN.G STA.T.US i
A f
- 1. UNIT NAME-Calvert Cliffs Unit 1
- 2. REPORTING PERIOD JULY 1991 3.
LICENSED THERMAL POWER (MWT) 2700 l
- 4. NAMEPLATE RATING (GROSS MWo) 918 5.
DESIGN ELECTRICAL RATING (NET MWo) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWo) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825
- 8. CHANGE IN CAPACITY RATINGS none
- 9. POWER LEVEL TO WHICH RECTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 744 5,087 142,284
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 333.3 3,237.0 99,753.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
- 14. HOURS GENERATOR ON LINE.
326.1 3,208.2 97,498.0
. 15..-UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 849,924 8,257,366 245,288,080
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH).
268,709
.2,752,636 81,583,403
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 256,522 2,636,385 77,526,562
- 19. UNIT SERVICE FACTOR 43.8 63.1 68.5
- 20. UNIT AVAILABILITY FACTOR 43.8 63.1 68.5-
- 21. UNIT CAPACITY FACTOR-(USING MDC NET) 41.8 62.8 66.0
- 22.. UNIT CAPACITY FACTOR (USING DER NET) 40.8
-61.3 64.5
- 23. UNIT-FORCED OUTAGE RATE 42.6 16.9 9.7
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
N/A 25.HIF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A
,~
-...m...,_.__,___.,__.__._.,._.,____,.,..-__
UNIT SIItTFDOWNS AND POWER REDUCTIONS DOCKETNO.91-317 UNIT NAME Catvert Gifh-U1 DATE Aormt 13.1WI COMPLETED BY tco Shanter TF1 FPHONE (vil)2Num REPORT SiONTTI Jnir 1991 MImIOD OF CAUSE & CORRECIWE SIIUTilNG LICENSEE DURATION DOWN EVENT SYSTB1 COMPONENT ACHONTO 4
CODES PREVENT RECURRENCE 3
REPORT s CODE N O.
DATE TYPEI (IIOURS)
REASON 2 RFACTOR Continued shutdown for scheduled maintenanw 9144 910701 S
176.0 B
N/A N/A outage.
914J7 910708 F
241.9 A
N/A N/A CB MOTORX Outage ertended duc to vibrations on 12A RCP.
Balance Shot corrected the probicm.
4 Exhibit G-Instructions 3 NietM 2 Reason:
1 F:
Forced 1-Manual for Preparation of Data S:
Scheduled A-Equipment Failure (Explain) 2-Manual Scram.
Entry Sheets for Liconse B4faintenance or Test 3-Automatic Scram.
Event Report (LER) File C-Refueling D-Regulatory Restriction 4-Other (Explain)
(NUREG4)l61)
E-Operator Training & License Examination 5 Exhibit I - Same Source F-Administrative G-Op-rational Error (Explain)
AVERAGE DAILY UNIT POWEP, LEVEL oco*********************************************************************
Docket No. 50-317 Calvert Cliffs Unit No. 1 August 13, 1991 Completed by Loo Shanley Tolophonet (301) 260-6744 JULY 1991 Avorago Daily Power Lovel Avorage Daily Power Lovel Day (MWo-No t)
Day (MWo-Not)
~~~ --------..................--------------------------
1 0
17 0
2 0
18 200 3
0 19 649 4
0 20 808 5
0 21 823 6
0 22 822 7
0 23 822 8
0 24 818 9
0 25 819 10 0
26 813 11 0
27 823 12 0
28 825 13 0
29 824 14 0
30 824 15 0
31 819 16 0
l
\\
I i
l
- DOCKET #50 317 CALVERT CLIFIL UNIT 1 August 13,1991 SUhthiARY OF OPERATING EXPERIENCE July 1991 i
'Ihe unit began the month shutdown in hiode 3 for a scheduled maintenance outage.
i RCS heatup was stopped on July 1 o evaluate excess vibrations on 12A RCP. The RCS was cooled t
down to Mode 5 on July 3. Dalance shot was added and 12A RCP was placed back in operation.
l RCS heatup was commenced on July 14 and Mode 4 was entered at 1340. Mode 3 was entered at 00'O on July 15.
The reactor was taken critical at 0245 on July 18 and the generator was paralleled to the gri<l at 0956.
10096 (815 MWe) was reached at 0810 on July 20.
i Power was reduced to (X)96 (750 MWe) at 2200 on July 25 for nuclear instrument calibration. 'lhe unit returned to 10096 (825 MWe) at 0500 on July 26.
The unit ended the month at 10096 power (825 MWe).
i f
h t
I i
+
f r
r h
i
n August 8, 1991 REFUEL.lHG liiFORMAT10LRE0urg 1.
Name of facility:
Calvert Cliffs Nuclear Power Plant, Unit No.1, 2.
Scheduled date for next refueling shutdown:
March 6, 1992.
3.
Scheduled date for restart following refueling:
May 17, 1992.
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The anticipated changes will effect consistency between the Unit 2 Cycle 9 Tech Specs and the Tech Specs for Unit 1 Cycle 11.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
Hovember f, 1991.
6.
Important licensing considerations associated with the refueling.
None identified at this time.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217.
(b) 1326.
Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) tne size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 1830.
(b) 2880.
9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 1992.
I
U111T 2 OPERATIl1G DATA REPORT Docket No. 50-318 August 13, 1991 Prepared by Leo Shanley Telephonet(301)260-6744 OPERATI!1G STATUS
- 1. UNIT NAME Calvert Cliffs Unit 2 2.
REPORTI!1G PERIOD JULY 1991 3.
LICENSED TilERMAL POWER (MWT) 2700 4.
NAMEPLATE RATIl1G (GROSS MWe) 918 5.
DESIGli ELECTRICAL RATJtJG (HET MWo) 845 6.
MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDAULE CAP'Y (NET MWo) 825
- 8. CllANGE Ill CAPACITY RATIllGS nono 9.
POWER LEVEL TO WilICll RESTRICTED n/a
- 10. REASONS FOR RESTRICTIOllS n/a Cumulativo This month Year-to-Dato to Date
- 11. I!OURS IN REPORTI!1G PERIOD 744 5,087 125,639
- 12. NUMBER OF llOURS REACTOR WAS CRITICAL 744.0 1,834.5 89,271.8
- 13. REACTOR RESERVE SliUTDOW!1 liOURS 0.0 0.0 1,296.6
- 14. !!OURS GENERATOR Oli LIllE 744.0 1,709.9 87,938.8
- 15. UNIT RESERVE SilUTDOWN llOURS 0.0 0.0 0.0
- 16. GROSS TilERMAL ENERGY GENERATED (MWil) 2,004,761 4,230,993 222,620,413
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWil) 637,290 1,350,976 73,635,608
- 18. ITET ELECTRICAL ENERGY GENERATED (MWil) 611,164 1,287,721 70,330,292
- 19. UNIT SERVICE FACTOR 100.0 33.6 70.0
- 20. UNIT AVAILABILITY FACTOR 100.0 33.6 70.0
- 22. UNIT CAPACITY FACTOR (USING DER 11ET) 97.2 30.0 66.2
- 23. UNIT FORCED OUTAGE RATE 0.0 21.7 5.7
- 24. SilUTDOWNS SCllEDULED OVER Tile NEXT SIX MO!1THS (TYPE, DATE AND DURATION):
Maintenanco/ Test, October 4, 1991 for 50 days
- 25. IF UNIT IS SilUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A
i UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKETNO-50-31x UNITNAME Calvert Cliffs-U2 DATE Aucust 13.1W1 COMPLETED BY Leo Shaniev TELEPHONE (30112604, m.
REPORT MONTII Jniv 1991 1
4 l.
METTIOD OF SilUT11NG UCENSEE CAUSE A CORRECI1VE DURAT10N DOWN EVENT SYSTEM COMPONENT ACTION TO 2
(IIOURS)
REASONI REACTOR 3 REPORT #
CODE 4 CODES PREVENT RECURRENCE NO.
DATli TYPEI There were no significant power reductions this month-i 1
i I
l 4
i i
4 l
i i
I i
t i'
i l
1 F:
Forced 2 Reason:
3 Method:
4 Exhibit G-Instructions S:
Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Ucense i
C-Refueling 3-Automatic Scram.
Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
(NUREG-0161) j' E-OperatorTraining & License Examination F-Administrative 5 ExhiH1 I-Same Source G-Operational Error (Explain) 1
--...--.,,.,...~,..,._,.r.,,_m.,
._,ry,,,,
-r-
.-.-w-,-.
...r.
v..r,--,_,.---..-..,_,
m.m.__._,,.-
4.
e AVERACE DAILY UNIT POWER LEVEL eee************************* *******************************************
Docket No. 50-318 Calvert Cliffs Unit No. 2 August 13, 1991 Completed by Loo Shanley Tolophonet (301) 260-6744 JULY 1991 Avorage Daily Power Lovel Average Daily Power Lovel Day (MWo-Not)
Day (MWo-Not)
_.t_____..____.....________.___________
1 741 5
17 823 2
757 18 827 3
824 19 827 4
828 2
20 821 5
830 21 825 6
827 22 824 7
829 23 825 8
829 24 817 9
826 15 815 10 828 26 829 11 826 27 828 12 828 28 830 13 830 29 831 14 826 30 834 15 825 31 832 16 822 i
DOCKET #50-318 CALVERT CLIFIL UNIT 2 August 13,1991 SUMh1ARY OF OPERATING EXPERIENCE July 1991 The unit began the month at 9696 power (740 h1We) with repairs being made to 21 IIcater Drain Tank liigh level Dump Control Valve. Repairs were completed and the unit returned to full power (810 h1We) at 2315 on July 2.
Power was reduced to 9396 (750 htWe) from 2325 on July 24 to (M42 on July 25 to clean 2311 Condenser Waterlm.
The unit ended the month at 10096 power (825 hiWe).
.~
i August 8, 1991 REFUELING INFORNATION RE0bEST 1.
Name of facility:
Calvert Cliffs Nuclear Power Plant Unit No. 2.
2.
Scheduled date for next refueling shutdown:
March 5, 1993.
j 3.
Scheduled date for restart following refueling: May 17, 1993.
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Not identified at this time.
5.
Scheduled date(s) for submitting proposed licensing action and i
supporting information.
November 17, 1992.
6.
Important licensing considerations associated with the refueling.
None identified at this time.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217.
(b) 1326.
Spent fuel pools are comon to Units 1 and 2.
8.
(a) The present licensed spent fuel. pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 1830.
(b) 2880.
9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 1992.
,