Informs That Facility Will Use Rod Swap Methodology in WCAP-9863, Rod Bank Worth Measurements Utilizing Bank Exchange, Beginning in Cycle 4.Methodology Reduces Time Required for Rod Bank Worth Measurement
ML20077P459
Person / Time
Site: Beaver Valley
Issue date: 09/06/1983
From: Carey J
DUQUESNE LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
TAC-52364, NUDOCS 8309130392
Download: ML20077P459 (1)


Text

b des

'A@

Telephone (412) 393-6000 E."o.'*e'o'x f "

September 6, 1983 Shippingport, PA 15077-0004 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No.1 Division of Licensing Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Bank Worth Measurement Using Rod Swap Gentlemen:

This letter provides notification that Beaver Valley Power Station, Unit No. I will use the rod swap methodology described in WCAP-9863

" Rod Bank Worth Measurements Utilizing Bank Exchange", beginning with Cycle 4.

The referenced WCAP has been reviewed and found acceptable by the NRC Core Perfomance Branch as an alternate method of determining rod bank worth, reference NRC letter and safety evaluation:

C. O. Thomas, iRC to E. P. Rahe, Westinghouse, May 28, 1983.

The rod swap methodology is an improved method for measuring rod bank worth over the boron dilution method as greater concentrations of boron are maintained in the reactor coolant system which will increase the Margin of safety and will:

1.

Reduce the time required for rod bank worth measurement, 2.

Reduce the amount of water to be processed, and, 3.

Increase the shutdown margin.

Based on the above, we have detemined that the rod swap methodology provides a safer method of measuring rod bank worth, therefore, procedures are now being developed to incorporate the rod swap methodology into our startup testing program.

Very trul yours, J. J. Carey Vice President, Nuclear jg cc: Pir. Peter Tam, Project Manager o c a.

U. S. Nuclear Regulatory Commission

$g Phillips Building g,

Washington, DC 20555 g

U. S. Nuclear Regulatory Commission et c/o Document Management Branch r>8 Washington, DC 20555

\\

Mr. W.11. Troskoski, Resident Inspector og U. S. Nuclear Regulatory Commission I

Qan..

Beaver Valley Power Station

\\ g Shippingport, PA 15077 i