I V

.o.

PHILADELPHIA ELECTRIC COMPANY l

23ol MARKET STREET P.O. BOX 8699 PHILADELPHIA PA.19101 JOMPH W. G ALLAGHER stternsc rnoEcv on"oseantuany 1215) 841<O03 September 6, 1983 Docket Nos. 50-277 50-278 50-352 50-353 Mr.-Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Schedule for Submittals in Response To NRC Generic Letter 83-28

Reference:

1)

Letter, D. G. Eisenhut to all licensees of Operating Reactors et al, " Required Actions Based on Generic Implications of Salem ATWS Events (Generic Letter 83-28)",

July 8, 1983 2)

Letter, T. J. Dente to D. G. Eisenhut,

" Schedule for Submittal in Response to NRC Generic Letter 83-28",

September 2, 1983, BWROG 83-29

Dear Mr. Eisenhut:

This letter requests an extension of time for submittals in response to the NRC letter (Reference 1) for the BWR plants owned by - Philadelphia Electric Company.

Philadelphia Electric Company is a member of the BWR Owners' Group (BWROG), and we have endorsed the BWROG - response to NRC Generic Letter 83-28 (Reference 2).

We are participating in the Group's generic evaluation and in order to best utilize this BWROG ef fort, a time extension is needed to respond for Peach Bottom Units 2 and 3 and Limerick Units 1 and 2.

po?I al 8309130294 830906 fl 0 PDR ADOCK 05000277 P-PDR s

c

_ <e y n 41 Mr.hDarrell G. Eisenhut -

Page 2 4

This extension of time will be required to respond' to

~

those issues in Generic Letter 83-28 regarding Section 2.1, Equipment' Classification and Vendor Interf ace.(Reactor Trip System components)l and Section 4.5, Reactor Trip System

~ Reliability -(System Functional Testing).

iBecause'our BWR plants do.not share the des gn features

~

i which f ailed at the Salem ~ plant, we consider a, time extension to-

..have _no significant impact on public health 'and safety.

q,=

.While participating in the 'BWROG program, -we -will icontinue 'to;evaluatefour capabilities in more detail.

After

-completion of the' BWROG-developed guidelines f or assessing -plant capabilities ;in response to. Reference.1,_ we.will develop the NRC requested. documentation:of our' plant assessment and submit our response to these ' issues. to the NRC by February 29, 1984.

We -are also requesting an extension of time = for J

-responding to'Section 2.2.2 of the Generic Letter.

We are a member of a-INPO Nuclear - Utility Task Action Committee' (NUTAC) f ormed on September.1,1983, ' f or the specific purpose of defining an appropriate vendor-interface program for all other safety related_ components..In. view of our continuing participi tion in

-;the INPO-Significant Event 3 valuation & Information Network (SEE-

~IN)(program, which provides us with timelyf inf ormation regarding industry experiences and: potential-concerns, we believe that a-time' extension will have no-immediate impact on public health and 2

safety.

While participating' in the -NUTAC, we will concurrently -

-evaluate, in more detail,' our existing ~. capabilities 'for.

i

interfacing with:our, vendors. _After, completion of'the'NUTAC's eff orts, which Jis ~ expected to be complete ~ by LFebruary 1, 1984, we

.will' submit'ourfprogram description to the'NRC_by April 15, 1984.

If you have any comments or questions, please do not 0 hesitate to contact us..

very truly yours, 4

~

N f0 ) ~

- csc : -A'.

R.;.Blough, Site Inspector 3