PHILADELPHIA ELECTRIC COMPANY l
23ol MARKET STREET P.O. BOX 8699 PHILADELPHIA PA.19101 JOMPH W. G ALLAGHER stternsc rnoEcv on"oseantuany 1215) 841<O03 September 6, 1983 Docket Nos. 50-277 50-278 50-352 50-353 Mr.-Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Schedule for Submittals in Response To NRC Generic Letter 83-28
Reference:
1)
Letter, D. G. Eisenhut to all licensees of Operating Reactors et al, " Required Actions Based on Generic Implications of Salem ATWS Events (Generic Letter 83-28)",
July 8, 1983 2)
- Letter, T. J. Dente to D. G. Eisenhut,
" Schedule for Submittal in Response to NRC Generic Letter 83-28",
September 2, 1983, BWROG 83-29
Dear Mr. Eisenhut:
This letter requests an extension of time for submittals in response to the NRC letter (Reference 1) for the BWR plants owned by - Philadelphia Electric Company.
Philadelphia Electric Company is a member of the BWR Owners' Group (BWROG), and we have endorsed the BWROG - response to NRC Generic Letter 83-28 (Reference 2).
We are participating in the Group's generic evaluation and in order to best utilize this BWROG ef fort, a time extension is needed to respond for Peach Bottom Units 2 and 3 and Limerick Units 1 and 2.
po?I al 8309130294 830906 fl 0 PDR ADOCK 05000277 P-PDR s
c
_ <e y n 41 Mr.hDarrell G. Eisenhut -
Page 2 4
This extension of time will be required to respond' to
~
those issues in Generic Letter 83-28 regarding Section 2.1, Equipment' Classification and Vendor Interf ace.(Reactor Trip System components)l and Section 4.5, Reactor Trip System
~ Reliability -(System Functional Testing).
iBecause'our BWR plants do.not share the des gn features
~
i which f ailed at the Salem ~ plant, we consider a, time extension to-
..have _no significant impact on public health 'and safety.
q,=
.While participating in the 'BWROG program, -we -will icontinue 'to;evaluatefour capabilities in more detail.
After
-completion of the' BWROG-developed guidelines f or assessing -plant capabilities ;in response to. Reference.1,_ we.will develop the NRC requested. documentation:of our' plant assessment and submit our response to these ' issues. to the NRC by February 29, 1984.
We -are also requesting an extension of time = for J
-responding to'Section 2.2.2 of the Generic Letter.
We are a member of a-INPO Nuclear - Utility Task Action Committee' (NUTAC) f ormed on September.1,1983, ' f or the specific purpose of defining an appropriate vendor-interface program for all other safety related_ components..In. view of our continuing participi tion in
-;the INPO-Significant Event 3 valuation & Information Network (SEE-
~IN)(program, which provides us with timelyf inf ormation regarding industry experiences and: potential-concerns, we believe that a-time' extension will have no-immediate impact on public health and 2
safety.
While participating' in the -NUTAC, we will concurrently -
-evaluate, in more detail,' our existing ~. capabilities 'for.
i
- interfacing with:our, vendors. _After, completion of'the'NUTAC's eff orts, which Jis ~ expected to be complete ~ by LFebruary 1, 1984, we
.will' submit'ourfprogram description to the'NRC_by April 15, 1984.
If you have any comments or questions, please do not 0 hesitate to contact us..
very truly yours, 4
~
N f0 ) ~
- csc : -A'.
R.;.Blough, Site Inspector 3