Interim Significant Deficiency Rept 74 Re 4 Kv Switchgear Malfunctions.Initially Reported on 830225.Deficiency Corrected in All But One Breaker.Uncorrected Breaker Returned to Brown-Boveri for Insp.Final Rept by 831125
ML20077M777
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 08/25/1983
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, SDR-174, NUDOCS 8309120416
Download: ML20077M777 (2)


Text

._____

2830598090 l

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 (2151841-4502

... = : = 1.

AUG 251983 Mr.' Thomas E. Marley, Director United States Nuclear Regulatory Ccanaission Office of Inspection and Enforoement, Region I 631 Park Avenue King of Prussia, PA 19406

SUBJECT:

Significant Deficiency Report #74 Interim Report on 4kV Switchgear Deficiency Linarick Generating Station, Units 1 and 2 NBC Construction Fermits Nos. CPPR-106 & 107 56-35L 50-3 53

REFERENCES:

(1)

Telecon of February 25, 1983 P. K. Pavlides (PECO) to R. Architzel and D. Johnson (USNRC)

(2)

Interim report of March 24, 1983 (3)

Interim report of April 28, 1983 D.D.Duvall(Brown-BoveriElectric,Inc.)to Victor Stello, Jr. (USNRC)

(4)

Interim report of June 17, 1983 FIIE:

QUAL 2-10-2 (SDR #74)

Dear Mr. Murley:

In compliance'sith 10CFR50 55(e), this is an interim report on the subject deficiency. Two interim reports (References 2 & 4) were previously submitted to your office by PECO whereas the Reference 3 interim report was submitted to Mr.

Victor Stallo, Jr.'s office in Washington, D.C. by Brown-Boveri Electric, Inc.

The deficiency has been corrected in a n but one breaker, either by adding the emitted spring to the operating mechanism or, in a few cases, by replacing the existing spring. One breaker has continued to misoperate and it has been g )b" 0309120416 830825

/

PDR ADOCK 05000352 hl 0, 6

2830598090 Mr. Thomas E. Murlety returned to Brown-Boveri for comprehensive testing and inspection.

We expect this process to be completed c.nd tire final report submitted to you by November 25, 1983 Sincerely, 3

O'

')' A ** %,

Copy to: Director of Inspection and Enforcement United States Nuclear Regulatory Ccamission Washington, D.C.

20555

8. K. Chaudhary, Resident NRC Inspector (Limerick)

DCD/ac

. -.