Monthly Operating Rept for Jul 1991 for Cooper Nuclear Station
ML20077M204
Person / Time
Site: Cooper 
Issue date: 07/31/1991
From: Kernes E, Meacham J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CNSS918759, NUDOCS 9108130225
Download: ML20077M204 (5)


Text

-

...m

--, ~ m.

_ m_

5

O is#

.{

1

-l r =;

OOPCH NUCL EAR 51 ATlON.

"i "" a0#4;n!"l^n*^ "'"

L Nebraska Public Power District n

CNSS918759 August 6, 1991 Document Control Desk

'U.'S. Nuclear Regulatory Commission Washington, D.C.

20555-

Subject:

Monthly Operating Status Report for July 1991_ Docket No.- 50-298.

Centlemen:

Enclosed 'for your.information and use is the Cooper Nuclear _ Station Monthly _

p p.3 Opercting Status Report for July 1991. _ The -report includes Operating ' Status,

~

Average. Daily Unit Tower-1.evel, -Unit Shutdown Data and a Narrative Summary of Operating Experience.

=Should you have any comments, or_ require additional information'regarding_this-report,.please contact me.

Sincerely,

+

l-a.sza v

l$

. M.-Meacham -

l Division Manager of-

- Nuclear _ Operations -

JMM:EAK: kap L

Enclosures-n

-cc:

'G. D. Watson w/enclosurea R. D Martin w/ enclosures L.--

l l

l

/

p I

9108130225 910731

/

i

-PDR' ADOCK 05000298 1

[R-PDR

~

-....~...a...

-.-.z.:....

, ~. -. _.., -,,- -... -.

..-a._.,,,...,-.-,.,..

OPERATING DATA REPORT DOCKET NO,

()$0-Q298 UNIT _GNS DATE

. Au nu s t-6.1991_.

- OfERATING STATUS TELEP110NE (402) 825-5766 1.

Unit Name:

Coooer Nuclear Station Notes 8

Reporting Period:

J.uly 1991.._.

3 Ucensed Thermal Power (MWt):

2381 4.

Nameplate Rating (Gross MWe):

83L 5.

Design Electrical Rating (Net MWe):,,,JJ8 6.

Maximum Dependaba Copacity (Gross MWe):,]87 7.

. Maximum Dependable Capacity (Net MWe):

764 B.

if Changes Occur in Capacity Ratings (ttems Number 3 Throcgh 7) Since Last Report, Give Reasons:

g.

Power Level T) Which Rosancted, if Any (Not MWe):

10.

Reasons For Restriction,l' Any,_

This Month Yr.-to-Date Cumulative 11.

Houra in Geporting Period 744.0 5.087.0 149.760 0 i

12.

Number of Hours Reactor Was Critical 744.0 4.Q(fl.

114.558.1 l

'3.

Peactor Reserve Shutdown Hours 0.0 0.0 0.0 1

14.

Hours Generator On Une 7441.

4.926 7 112.067.7 15.

Unit Reserve Shutdown Hours 0.0

, QQ_

0.0 16, Gross inermal Energ,/ Generated (MWH) 1.654.344 0 11.355.720 0 2E947.844.0 1P.

Gross Electric Energy Generated (MWH) 538.269 0 3.777.602.0 741,87.012.0

- 18, Net Electric Er. orgy Generated (MWH) 521.060.0 3.662.118.0 71.788.698.0 Ig.

Unit Service Factor 100.0 96 8 75.4 80.

Unit Availability Factor 100.0 -

96.8 75.4 21.

' Unit Capacity Factor (using MDC Net) 91 7 94.2 62.7 82.

Unit Capacity Factor (Using DER Net) 90.0 92.5,

61.6 83.

Unit Forced Outage Rate 00 0.0 4.6 84.

Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refuelina and Maintenance Outaae 14. scheduled October 1991. 8 weeks.gration.

1 25 If Shut Down At End of Report Period, Estimated Date of Startup-N/A 1

t '

es.

Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICAUTY INITIAL E'.ECTRICTTY COVMERG.AL OPERATION i

a

t-

.1
AVERAC3 DAILY UNIT POWER LEVEL DOCKET NO.

050-0298 UNIT CNS DATE Aucust 6, 1991 TELEPHONE

_Jf02).825-5766 MONTH JulV 1991_

DAY AVERAC "AILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i kv. e-Ne t)

(MWe-Nat) 1 735 17 732 3-729 18 728 3

729 19 722

4 730 20 7J_8

.5L 712 21 714 16 541 22 716 7

638' 23 710 8 =-

___7 31 -

24 693

.9~

755 25 707

' 10' 758 26 701

- 11.-

757 27-703

.12' 753 28-703

'13, 750 29 697 7

14.

747 30 639 15 743 31 272

16 738 I'NSTRUCTIONS

-On'this format, list tha average daily unit power level in MWe-Net for each

, day in the reporting month.

Compute to the nearest whole megawatt.

y r-e=+

+

r m

2 e.

,r.I e

w--

9Fp--

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

0504T/98 2

UNIT NAME CooperNuclearStalign

  • DATE-Amaust 7.1991 '

COMPLETED BY ' E. A. Kernes TELEPHONE.

(4021825-5766 REPORT MONTH July 1991 Method Of Ucensee S..

Cause & Corrective -

Duration Snutthg Event System

  • Ccmponent Actiento '

3 No.

Date Type.

(Hours)

' Reason 2 1

Down Reactor.'

Report Code Code Prevent Recurrence 9143 7-6-91 S

0 F

5

.N/A N/A N/A Intentional power reduction to periorm schedded testing and controtrod withdrawal 9144 73491 F

0 D

5 LER 91-007 LER not available at time of repor*

1 i

t i

l L

1 F: Forced 2

Reason:

3 Method-4 Exhu O - Instructionsfor S: Scheduled A-Eruipment Failure (Exphin) 1 - Manual Preparation of Data Entry B - Laintenance e Test 2 - Manual Scram Sheets for Ucensee Event C-Refueling 3-AutomaticFeram Report (LER) File (NUREG4161)

D-Regulatory Restriction 4 - Contnued l

E - Operator Training & License Examination 5 - Reduced Load 5 ExhNI-Same Source i

F-Administrative 6 - Other G - Operational Ltor (Explah)

H - Other (Explain)

~

.. ~

L'..

LOPERATIONSLNARRATIVE COOPER NUCLEAR STATION

-JULY 1991 1

1 MAXIMl'M' POWER OPEkATION WAS EXPERIENCED FOR THE CONTRO L

RODLCONFIGURATION IN EARLY' JULY.

A SIGNIFICANT POWER REDUCTION WAS UNDERGONE JULY-5-6 TO PERFORM ROUTINE i

-TESTING PROCEDURES"AND TO WITHDRAW CONTROL RODS, ALL-RODS OUT WAS ACHIEVED JULY 6. : FULL-POWER WAS ACHIEVED JULY 8.-

END-OF-CYCLE COASTDOWN BEGAN' JULY 12 AND MAXIMUM POWER'0PERATION CONTINUED UNTIL JULY 30.

POWER

WAS: REDUCED TO APPROXIMATELY-25% GN JULY 30-31~DUE TO DIESEL 1 GENERATOR OPERABILITY CONCERNS.- RETURN TO MAXIMUM-POWER OPERATION BEGAN ON JULY-31.

A CAPACITY FACTOR-OF 91.7% WAS ACHIEVED FOR THE MONTH OF1 JULY.