Forwards Second Interval ISI Plan Catawba Nuclear Station Unit 1, Rev 0.Isometric Drawings & Sys Flow Diagrams Requested by NRC to Support Review of Plan & Requests for Relief 94-04 & 94-05 Included as Part of Plan
ML20077K846
Person / Time
Site: Catawba 
Issue date: 12/29/1994
From: Rehn D
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20077K849 List:
References
NUDOCS 9501110118
Download: ML20077K846 (3)


Text

,..

pygr s.,.

. ll-I DukeherCompany D.L Ron Catauha Nuclear Generation Department

%ce President 4800 ConcordRoad (803)L113205 Omce York,SC29N5 =

(803)8313C6 Fax DUKEPOWER December 29,1994 U.S. Nuclear Regulatory Commission

. A+terition: Document Cor. trol Desk Washington, D.C. 20553

Subject:

Catawba Nuclear Station, Unit 1 Docket No. 50-413 Submittal of Second Ten-Year Inservice Inspection (ISI) Plan Gentlemen:

Please find attached a copy of the subject plan which covers the second ten-year inspection interval for Catawba Unit 1, which is scheduled to begin on June 29,1995. The i

plan is divided into two parts: (1) General Requirements and (2) Catawba Unit 1

{

Specifics.

s Also included is a copy of all isometdc drawings and system' flow diagrams that were requested by the NRC to support review of the plan.

Finally, Requests for Relief Nos. 94-04 and 94-05 are aise included as part of the plan.

Relief Request 94-04 seeks relief from the pressurizer support skirt surface examination requirements. Relief Request 94-05 requests a deferral ofreactor vessel outlet nozzle examinations from the first to the last period of the second ten-year interval. The request allows the examinations to be done in conjunction with the second interval ten-year reactor vessel examination.

If you have any questions concerning this material, please call L.J. Rudy at (803) 831-3084.

Very truly yours,

}L dff D.L. Rehn

$hhh fI PDR 1

l \\

mm e s,a

. [-].? Q %
?. Qa.p f
_.yfig g.f g $M n ;{-

g,,

c s.

...m a r>

m

.-...:.m.m m

m p'

~

-pf c

[

,r

_ g.

t J.

Document Control Desk j

Page 2 -

December 29,1994

'i it LJR/s a

l Attachments i

. xc:

S.D. Ebneter, Regional Administrator Region il(without attachments)

?

R.J. Freudenberger, Senior Resident Inspector (without attachments)

R.E. Martin, Senior Project Manager ONRR(with attachments) r t

{

e i

i I

i t

f l

t ii I

l l

.~

O V

Document Control Desk Page 3 December 29,1994 bxc (without attachments):

Z.L. Taylor L.J. Rudy J.O. Barbour Document Control File 801.01 Group File 801.01 NCMPA-1 r

NCEMC PMPA SREC l

ELL-EC050 i

i l

i i

)

i 4

P b