Advises of Complete Implementation of Spds,Per Generic Ltr 89-06 & TMI Action Items I.D.2 on 910628
ML20077J920
Person / Time
Site: Peach Bottom  
Issue date: 07/30/1991
From: Beck G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TASK-1.D.2, TASK-TM GL-89-06, GL-89-6, NUDOCS 9108050246
Download: ML20077J920 (2)


Text

._

J e

e PillLADELPillA ELECTRIC COMI%NY NUCLEAR GROUP HEADQUARTERS 955-65 CHESTERBROOK BLVD.

WAYNE, PA 19087 5691 (215) 640-6000 NUCLEAR ENGINEERINO & SERVICES DEPARTMENT July 30, 1991 Docket Nos.

50-277 50-278 License Nos.

DPR-44 DPR-56 U.S.

Nuclear Regulatory Commission Attn Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Response to Generic Letter 89-06, " Task Action Plan Item I.D.2 - Safety Parameter Display System"

REFERENCE:

Letter from G.

Y. Suh (NRC) to G.

A.

Hunger, Jr.

(PEco) dated April 23, 1990

Dear Sir:

In the referenced letter you requested that we notify you upon the full implementation of the Safety Parameter Display System (SPDS) at Peach Bottom Atomic Power Station, Units 2 and 3.

The SPDS has been implemented in accordance with our commitments as follows:

Implemented Committed Unit 2 6/28/91 6/30/91 Unit 3 6/28/91 7/31/92 If you have any questions, please contact us.

Very truly yours, l

/ cMf G.

J.

eck, Manager Licensing Section Nuclear Engineering & Services 600 i

n os %..gn woooy.

.(i, 4 Fiono pca e

FDR

July 30, 1991 Page 2 9

cci T. T. Martin, Administrator, Region I, USNRC J. J.

Lyash, USNRC Senior Resident Inspector, PB

.