ML20077J454
| ML20077J454 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 08/08/1983 |
| From: | Cox S, Leonard H CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Baranow S STONE & WEBSTER, INC. |
| References | |
| 19830, NUDOCS 8308160422 | |
| Download: ML20077J454 (2) | |
Text
I 4
PRINCIPAL STAFF RA ENF Ol CORSum8IS
/-Q. i b 0/RA SCS V
- /RA e^o
(>
POW 8f 3'
/
Midland Project: Po Box 1963, Midland, MI 4864o e (517) 631465o OL
. FILE 4 4-7 August 8, 1983
.5D ' Y) 60 ' D D Mr Stan Baranow Program Manager CIO Stone and Webster Midland Energy Center PO Box 1963 Midland, MI 48640
SUBJECT:
MIDLAND ENERGY CENTER - REQUESTED DOCUMENTS FILE: 24.2 SERIAL: 19830 This is to confirm discussions between M J Schaeffer, M L Bupp and S K Cox of MPQAD-HVACA and Frank Bearham and Rick Scallon of Stone and Webster on request-ing the following documents:
i HlA Rev 2 PIPR H5A Rev 1 PIPR hlb Rev 0 PIPR H5B Rev 1 PIPR H2A Rev 0 PIPR H6 Rev 1 PIPR & Supplements H2B Rev 0 PIPR H7A Rev 1 PIPR & Supplements H2C Rev 0 PIPR H7B Rev 3 PIPR H3 Rev 0 PIPR H7C Rev 1 PIPR H4A Rev 3 PIPR H7D Rev 0 PIPR H40 Rev 2 PIPR H7E Rev 0 PIPR H4H Rev 0 PIPR H9 Rev 1 PIPR H4I Rev 0 PIPR H10 Rev 2 PIPR Bechtel Technical Specification M151A, Rev 15
/
MB-FP-17 Rev 2, Weldirig Procedure Qualification MB-FP-5 Rev 3, Installation MB-FP-3 Rev 2, Field Fabrication MB-FP-1 Rev 2, Requisition / Receipt Inspection MB-FP-7 Rev 1, Document Control Zack Quality Assurance Manual - 2nd Edition, Rev 0 M I 1 983 Bechtel Drawing C-843, Rev. 7-DESIGETED ORIGINAL 8308160422 930800 PDR ADOCK 05000329-e f
j A
PDR' Certified By 5'
Nt'
'/
f f
g/ ifL
7:
s-4
- SBar:n:w from HPLeonard Serial 19830 August 8, 1983
- Page 2 A copy of each of the above is attached for your use.
H P Leonard S K Cox General Superintendent Supervisor, Administrar, ion MPQAD-PAD MPQAD-HVACA HPL/SKC/en y~ v~m.m,.m cc:tf h isonf NRC (w/o att.)
DBM1115, Midland (w/o att.)
RAWells, Midland (w/o att.)
k 1
l i
i i
o t
+
I v
e v-v
" + -
'*