From: Miller L, Zupko J
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8308160336
Download: ML20077J386 (14)


Text

_ _ ___

AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-272 Unit Name Salem # 1 Date August 10, 1983 Completed by L. K. Miller Telephone 609-935-6000 Extension 4455 Month July 1983 Day Average Daily Power Level Day Average Daily Power Level-(MWe-NET) (MWe-NET) 1 1110 16 1087 2 1078 17 1087 3 1057 18 .088 4 1109 19 1074 5 1084 20 1108 6 1069 21 1037 7 1065 22 1052 8 1097 23 1080 9 1077 24 879 10 1089 25 1037 11 1090 26 1095 12 1090 27 1076 13 1063 28 1075 14 1080 29 1090 15 1042 30 1059 31 1066 .

P. 8,1-7 R1 I

Page 2 of 14 8308160336 830810 PDR ADOCK 05000272 , I R- PDR l

L OPERATING DATA REPORT Docket No. 50-272 Date August 10, 1983 Telephone 935-6000 Completed by' L. K. Miller Extension 4455 Operating Status

1. Unit Name Salem No. 1 Notes

! 2. Reporting Period July 1983

3. Licensed Thermal-Power (MWt) 3338 14 . Nameplate Rating (Gross MWe) 1135
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (Gross MWe)1124
7. Maximum Dependable Capacity (Net MWe) 1079
8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
9. Power Level to Which Restricted, if any (Net MWe) N/A
10. Reasons for Restrictions, if any N/A This Month Year to Date ' Cumulative 4
11. Hours in Reporting Period 744 5087 54096 l 12. No. of Hrs. Reactor was Critical 744 1958 29683.2 i 13. Reactor Reserve Shutdown Hrs. 0 2033.4 3006.5
14. Hours Generator On-Line 744 1724.3 28372
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 2475046.0 5538318 84708509
17. Gross Elec. Energy Generated (MWH) 829490 1868440 27833290
18. Net Elec. Energy Generated (1663) 796645 1752098 26346951
19. Unit Service Factor 100 _

33.9 52.4

20. Unit Availability Factor 100
  • 33.9 52.4
21. Unit Capacity Factor (using MDC Net) 99.2 31.9 45.1
22. Unit Capacity Factor (using-DER Net) 98.2 31.6 44.7
23. Unit Forced Outage Rate 0 58.6 31.0
24. Shutdowns scheduled over next 6 months (type, date and duration of_each)

N/A

25. If shutdown at end of Report Period, Estimated Date of Startup:

N/A

.26. Units in. Test Status (Prior'to Commercial Operation):

' Forecast Achieved Initial Criticality 9/30/76 12/11/76.

Initial Electricity 11/1/76 12/25/76

~ Commercial Operation 12/20/76 6/30/77 1-7.R2 L Page 3 of 14

UNIT SHUTDOWN AND POWER REDUCTIONS-' Docket No. 50-272 .

REPORT MONTH JULY 1983 Unit Name Salem No.l.

Date August 10, 1983 Completed by L.K. Miller Telephone 609-935-6000 Extension 4455 4

Method of Duration Shutting License Cause and Corrective-No. Date Type Hours Reason Down Event System Component Action to .

1 2 Reactor Report Code 4 Code 5 Prevent Recurrence-Traveling Screen /

Trash Rack Canal 83-134 7/03 F 7.8 B 5 ---

HF FILTER Screens l

l

!83-136 7/04 "

7.8 " HF FILTER

83-138 7/06 "

40.3

'83-140 7/08 7.3 *

!83-142 7/09 "

3.2 r 83-144 7/09 4.5 I 83-146 7/10 6.6

\ " " " " " " " "83-148 7/10 -" 2.6 1

1 83-150 7/13- 3.6 83-152 ~7/14 3.9

,1.83-154 7/14 5.0 l

1 2 Reason 3 Method 4 Exhibit G 5 Exhibit 1

} F: Forced. .A-Equipment Failure-explain 1-Manual Instructions Salem as 2 S: Scheduled B-Maintenance or Test 2-Manual Scram, for Prepara- Source C-Re fueling 3-Automatic Scram. tion of Data I D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee

'F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161) i Page 4 of 14

UNIT SHUTDOWN AND POWER REDUCTIONS Docket No. 50-272 -

REPORT MONTH JUNE 1983 Unit Name Salem No.1 Date July 10, 1983 -

Completed by L.K. Miller Telephone 609-935-6000 -

Extension 4455 83-156 7/14 6.1 Feedwater LP Heater 83-158 7/14 "

5.2 " " "

HB HTEXCH Tube Leaks Traveling Screens /

Trash Racks / Canal

" " " FILTER Screens83-160 7/15 "

23.6 HF

~"83-162 7/20 3.3 83-164 7/20 3.3 83-166 7/20 3.7 83-168 7/21 7.3

" " " " " " " " i 83-170 7/21 10.3 l 83-172 7/23 6.1

" l 83-174 7/23 6.4 83-176 7/24 13.7 83-178 7/24 "

4.6 A " "

HH HTEXCH Condensate Piping I

2 Reason. 3 Method 4 Exhibit G 5 Exhibit I

l. A-Equipment Failure-explain 1-Manual Instructions Salem as,

.F:-Forced S: cSched.uled B-Maintenance or Test 2-Manual Scram, for Prepara- Source 1 C-Re fueling 3-Automatic Scram, tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exan Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report

-G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161) i Page 5 of 14

-UNIT SHUTDOWN AND POWER REDUCTIONS Docket No. 50-272 .

REPORT MONTH JUNE 1983 Unit Name Salem No.1 +

Date July 10, 1983 -

Completed by. L.K. Miller Telephone 609-935-6000 -

Extension 4455 Traveling Screens /

Trash Racks / Canal 83-180 7/24 F 7.0 B 5 --- HF FILTER Screens83-182 7/25 5.8 Condenser Tube and 83-184 7.26 "

3.7 " " " "

HTEXCH Water Box Cleaning Traveling Screens /

Trash Racks / Canal 83-186 7/26 "

9.4 " " FILTER Screens83-188 7/28 "

3.3 ,83-190 7/28 2.5

> Condenser Tube and 83-192 7/30 "

9.4 " " " "

HTEXCH Water Box Cleaning

83-194 7/31 "

6.0 A " Condenser Tube Leaks 1 2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled B-Maintenance or Test 2-Manual Scram. for Prepara- Source C-Re fueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161) i Page 6 of 14 i

DOCKET NO: 50-272 MAJOR PLANT MODIFICATIONS UNIT NAME: SALEM 1 REPORT MONTH JULY 1983 DATE: August 10, 1983 .

COMPLETED BY: L. K. Miller TELEPHONE: (609)935-6000 Ext. 445$

  • DCR NO. PRINCIPLE SYSTEM SUBJECT Civil / Structure Installawiremeshc$rgonettingbetween lEC-1594 building wall and water storage-tank.

I 4

4 i

i 4

f i

I

(

  • DESIGN CHANGE REQUEST 8-1-7.R1 Page 7 of 14 i

MAJOR PLANT MODIFICATIONS DOCKET NO.: 50-272 REPORT. MONTH JULY 1983 UNIT NAME: Salem 1 DATE: August 10, 1983 COMPLETED BY: L.K. Miller TELEPHONE: 609/935-6000 X4455

  • DC R NO . 10CFR50.59 SAFETY EVALUATION lEC-1594 Installation of this DCR provides an additional measure of safety to protect the water storage tank in the event that a seismic action causes the building wall to fall. No unreviewed safety or environmental questions are involved.

l l

l l

1

  • Design Change Request i

l l

t l

Page 8 of 14 l

PSE&G SALEM GENERATING STATION SAFETY REIATED WORK ORDER IOG .

SALEM UNIT 1 WD ND DEPT WIT Bgum4ENT IDDrnrICATIN 924542 m 1 VALVE 1PR2 4

FAILURE DESCRIPTIW: VALVE LEAKS '111RCOGH. 830304 00RRBCTIVE ACTION: REPLACED SlYM, PLUG, A10 CAGE. 830305.

924544 2 1 RX MP BKR A FAILURE DESCRIPTIW: REPIACE W DEVICE AND PERNRM M30-2.

CORRECTIVE ACTION: INSTAR.im W DEVICE AND PEREORMED M30 SAT. 830305.

924545 10 1 RX 'IRIP BKR B FAILURE DESCRIPTIN: REPIACE W DEVICE AND PERFORM M30-2. 830305.

CORRBCTIVE ACTION: INSTAT.rm W DEVICE AND PERNRMED M30 SAT. 830305 924546 50 1 -RX BYPASS BKR A  ;

i FAIIDRE DESCRIPTIW: REPIACE W DEVICE AND PERNRM M30-2. 830305.

CNRBCTIVE ACTION: REPIACED W DEVICE AND PERFORMED M30 SAT. 830305.

924547 50 1 RX BYPASS BKR B i

I FAILURE DESCRIPPIW: REPIACE W DEVICE AND PEREORM M30-2. 830305.

CORRBCTIVE ACTIN: REPLPCED W DEVICE AND PERFORMED M30 SAT. 830306.

i 924573 30 1 L RX 'IRIP BKR A FAILURE DESCRIPTIN: PEREORM QPS GANGE 2 T M3Q-2. PEREORM W TRIP TEST 10 TIMES, OCE EVERY HALF HOUR. 830307.

CORRECTIVE ACTIW: PEREORMED CHANGE AIO TRIP TEST - SAT. 830307.

Page 9 of 14 i

PSE&G SALEM GENERATING S'IATIN SAFETY RELATED NORK @ DER IOG .

SAIE1 UNIT 1 WO NO DEPT LEIT Eg3IINENT IDENTIFICATIm 924578 10 1 RX TRIP BKR B FAILURE DESCRIPPIW: PEREDIN CffS GANGE 2 T M3Q-2 APO W TRIP TEST 10 TIMES CNCE EVERY HALF llOUR.

830308.

CORRECTIVE 7CTIW: PEREORMED CHANGE AND TEST - SAT. 830308 924579 E 1 RX 'IRP BPSS BKR A 3

FAIIURE DESCRIPTICN: PEREORM QIS GANGE 2 & M3Q-2 APO W TRIP TEST 10 TIMES EVERY HALF HOUR. 830308 Cu<RtL'nVE ICTION: PEREORMED CHANGE AND TRIP TEST - SAT. 830309.

924601 10 1 RX 'IRIP BKR A FAILURE DESCRIPTICN: PEREORM INSPECTIm T 28VDC AND 125VDC CCNTROL CIRCUITS. 830309.

Cut <teL'nVE ICTION: TESTED SAT AS PER M3C. 830326 1

924602 FD 1 RX 'IRIP BREAKER B FAILURE DESCRIPTICN: PEREORM INSPECTIN T 'IHE 28VDC AND 125 VDC COtiIROL CIRCUITS. 830309.

CRRECTIVE JCPION: TESTED SAT AS PER M3C. 830326 924603 10 1 RX 'IRIP BPSS BKR A FAILURE DESCRIPTICN: PEREORM Ihsm'nCN T 'IHE 28VDC AND 'IHE 125VDC CCNTROL CIRCUITS. 830309.

CWRECTIVE ICfION: PERFORMED M3C AND FOUND CIRCUIT 'IO BE E1JNCPINING C@PECFLY. 830413 924604 PO 1 RX TRIP BYPSS BKR B  :

i FAILURE DESCRIPTICN: PEREORM INSPECTICN T 'IHE 28VDC AND 125VDC CONTROL CIRCUITS. 830309.

CNRECTIVE JCTION: PEREORMED M3C AND FOUND CIRCUlTS 'IO BE E1JNCPICNING CORRBCPLY. 830413 Page 10 of 14

da - _a- *:

PSE&G SALEM GENERATING SIATION SAFE 1"I RELATED WOIE ORDER IOG .

SALEM UNIT 1 WO NO DEPT UNIT EQUIPMENT IDENTIFICATIm 932275 MD 1 ELECT PENEFRATIWS FAILURE DESCRIPTICN: PEREORM DEW POINE MEASUREMENT AND DOCUMENT EXISTING N2 PRESSURE CN PENEFRATIWS 3, 8, 25, 41, 49. 830305 CORRECTIVE PCfIW: DEN POINTS MEASURED AND ALL FITTINGS TIGfrENED OR QIECKED. NO LEAKAGE NOTED FULIIWING DAY. 830505 922516 CD 1 VALVES 12SW305 & 49 FAILURE DESCRII'fICN: VLV WILL NOT CPERATE CXERECTLY. 12SW HEADER PRESSURE UP TO 150 PSIG AND VLVS DID NOT OPEN. 830504 CORRECTIVE ACTICN: BLEW GJT INST SNSNG INS, EtXRO 12SW305 SIUCK SHUT. IT 'IEUMPS MISN OPND.

VARTFD CNTRLR SETPNT. OP OK. 830505 923826 OD 1 13 S/G LEVEL 01 1 FAILURE DESCRIPTIm: GANNEL READING ERRATIC. 830609.

Cun8Eur1VE ACTIW: ISOLATOR IIJ4-539A HAD BILWN CAPACI'IORS. REPI1CED 1 SOLA'IORS. 830609 923882 CD 1 BCD CCNfROL FAILURE DESCRIPTIW: W/mTRL RCDS @ 228 STEPS IND'D CN ALL OTTRL RM INS TP! WIN, STEP C CNTR INC 'IO 230 STEPS. 830608 CORRECTIVE AcrIm: SE7fPOINT CN 1DC442D DRIE'IED AND DID NOT TRIP. REPIACED CmPARA'IOR AND SET TRIP SET POINT. 830609 923927 OD 1 13 CHIILER FAILURE DESCRIPTICN: RECIRCULATIO4 PWP IS LFAKING OIL. 830602 CUKKu;nVE ACTION: REPINE MBCHANICAL SEAL, 2 OIL SEALS, GASKETS, 0-RING AND SHAFT SIEEVES. 830610 Page 11 of 14

PSE&G SALEM GENERATING STATION SAFETY REEATED WORK CEDER IOG SAIB4 UNIT 1

' WO NO DEPT WIT EQUIENENT TinNnrICATIN

- 923997 CD 1 VALVE OP, 12RH29 FAILURE DESCRIPTICN: AT RCS N.O.P. AND 12 RHR PWP I/S,12NI29 WILL CIOSE IF IHT IN NJTO. 830528 CORRECTIVB ACTION: REPICD DUAL CMPRPR 1EC-641B/D. ADIS'ID #! OUTPT TRIP 'IO 5.0/ RESET 4.96. #2 'IO 2.0/RFMP 2.04. 830601 .

932418 OD 1, AFP ROOM COTER FAILURE DESCRIFrIW: 00CLER HAS SERVICE WATER LEAK. 830501.

C N ACTION: FWD IEAK. RENDVED MILLSCALE AND PA'ICHED WITH BELZWA. 830502.

935360 CD 1 OcNr AIR IDCK EL130 FAILURE DESCRIPTIN: CU'IER DOOR FAILED LEAK RATE. 830427 CuceLnVE ACTIN: CRIGINAL SEAL WAS POSITINED IN DOOR. 830428 l

! 938285 CD 1 15 SW P W P STRAINER FAILURE DESCRIPTIW: STRAINER RUNS WITH A DELTA P OF 30 PSID. 830711 CCRM ACTICE: REPIJCED EHMENTS AND UPPER SHEKT. 830713 i-l - 938683 CD 1 13 SERVICE WIR PWP \

1 FAILURE DESCRIPTICN: MDIOR AMPS ARE VERY IIM AIO PWP DISCHARGE PRESSURE IS IEW. 830704 CWRECTIVE ACTION: REPIJCED PN WITH SPARE. 830707 Page 12 of 14 L----- - - - _ __________._ ___

JL , ,.

REFUELING INFORMATION DOCKET NO.: 50-272 COMPLETED BY: L.K. Miller UNIT NAME: Salem 1 .

DATE: August 10, 1983 TELEPHONE: 609/935-6000 EXTENSION: 4455 i Month July 1983

1. Refueling information has changed from last month:

YES NO X

2. Scheduled date for next refueling: August 4, 1984
3. Scheduled date for restart following refueling: October 21, 1984

}

f 4. A) Will Technical Specification changes or oth'er license j amendments be required?

l YES NO i NOT DETERMINED TO DATE 8/1/83 i

B) Has the reload fuel design been reviewed by the Station l Operating Review Committee?

YES NO X If no, when is it scheduled? July 1984 i 5. Scheduled date (s) for submitting proposed licensing action:

July 1984 (if required) i

! 6. Important licensing considerations associated with refueling:

j NONE i

7. Number of Fuel Assemblies:

A) Incore 193 B) In Spent Fuel Storage 212 l 8. Present licensed spent fuel storage capacity:- 1170 1

! Future spent fuel storage capacity: 1170 t

9. Date of last refueling that can be discharged to spent fuel pool assuming the present l

licensed capacity: September 1996 8-1-7.R4 Page 13 of 14 l

l

SALEM UNIT 1 OPERATIONS

SUMMARY

REPORT JULY 1983 Unit No. 1 began the month at 100% power and continued to maintain full power until July 14th, when power was reduced 7% during performance of a leak test on the feedwater heaters. On July 15th, the unit was again at full power and continued to operate at 100%

until July 24th, when power was reduced to approximately 57% for  ;

, repairs to No. 12 Feedwater pump high point vent. A new valve and 4

nipple were welded on and the unit was returned to full power operation. Unit No. 1 attained an average rated thermal power of 99.3% for the month of July.

l

?

I i

! Page 14 of 14 i

~

O PSIEG Public Service Electric and Gas Cornpany P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station August 10, 1983 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 In Compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of July 1983 are being sent to you.

Average Daily Unit Power Level Operating Data Report Unit' Shutdowns and Power Reductions Major Plant Modification Summary of Safety Related Maintenance Operating Summary Refueling Information Sincerely yours, J. M. Zupko, Jr.

General Manager - Salem Operations LKM:sbh cc: Dr. Thomas E. Murley Regional Administrator USNRC Region I l 631 Park Avenue King of Prussia, PA 19406