OPERATING DATA REPORT DOCKET NO.
050-298 DATE 7/1/83 _
COMPLETED BY P. L. Ba1. linger TELEPHONE 402-825-3811 OPERATING STATUS Notes
- 1. Unit Name:
Cooper Nuclear Station
- 2. Reporting Period:
June 1983
- 3. Licensed Thermal Power (MWt):
2381
- 4. Nameplate Rating (Gross MWe):
836
- 5. Design Electrical Rating (Net MWe): 778
- 6. Maximum Dependable Capacity (Gross MWe): 787
- 7. Maximum Dependable Capacity (Net MWe):
764
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr..to.Date Cumulative
- 11. Hours In Reporting Period 770.0 4_143.0 78.888.0
- 12. Number Of Hours Reactor Was Critical 0.0 2.850.1 64.221.0
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On.Line. _ _
0.0 2.840.4 63.212.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 0.0 6.227.904.0 126.289.206.0
- 17. Gross Electrical Energy Generated (MWH) 0.0 2.083.668.0 40.015.896.0
- 18. Net Electrical EnerEy Generated (MWH) 0.0 2.011.673.0 38,585,133.0
- 19. Unit Service Factor 0.0 65.4 80.1
- 20. Unit Availability Factor 0.0 65.4 80.1 4
0.0 60.6 64.0
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 0.0 59.5 62.9
- 23. Unit Forced Outage Rate n0 0.7 3.7
' 24. Shutdowns Scheduled Over Next 6 Months IType. Date,and Duration of Each1:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
Aunust -1.
1983
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved - /
INITIA L CRITICALITY k
INITIAL ELECTRICITY
>l COMMERCIAL OPERATION h
8300110312 8
i l
R 1
m
.,_a f
-- h L.-
r-+..
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
050-298 UNIT Cooper Nuclear Station DATE 7-1-83 COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811
~ MONT}{
June DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
g7 0
2 0
gg 0
3 0
39 0
4 0
0 20 5
0 21 0
6 0
22 0
_ 7 0
23 0
g 0
24 0
9 0
0 25 10 0
26 0
11 0
27 0
12 0
28 0
0 13 29 14 0
30 0
13 o
3 16 0
INSTRUCTIONS On this format. list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
J e
1 J
1 DOCKET NO. 050-298 UNITSilUIDOWNS AND' POWER REDUCTIDNS UNIT NAME Cooper Nucienr Station DATE 7-1-83 COMPLETED BY P. L. Ballincer REPORT MONTI{
June TELEPHONE 402-825-3811 "L
c jg 3
jYh Licensee
,E t,
$"1, Cause & Corrective Action to No.
Date g
E ij N*
,3 s $
Event p
gg b
yE 5
jg Report #
ui U Prevent Recurrence g
i d
83-3 830430 S
720 C
2 N/A N/A N/A 1983 Refueling and Maintenance.
i i
3 4
Reason l :
I 2
Method:
Exhibit G-Instructions F: Forced S: Scheduled A Equipment Failure (Explain)
I-Manual for, Preparation of Data B. Maintenance or Test 2-Manual Scram.
Entry S'icets for Licensee C-Refueling 3 Automatic Scram.
Event ReporI(LER) File (NUREG-D Regulatory Restriction 4 Other (Explain) 0161)
E. Operator Training & License Examination F Administrative S
Exhibit I Same Source G-Operational Error (Explain) 19/77)
Il-Other (Explain) 1
.:=a
~
, no n
' l OPERATIONS NARRATIVE Cooper Nuclear Station June 1983 s
f.
The 1983 Refueling Outage continued through the month of June. A program to weld overlay the crack found on reactor. recire piping is underway.- A tentative start up date of August 1, 1983 is planned.
4 i
'f i
i-i i
e k
I 1
i i
i h
i h
t
' y s 'o r
F h
" *hh[$3!b$$fs!!$'h^ "
Nebraska Public Power District CNSS830414 July 1, 1983 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Monthly Operation Status Report for June 1983 Docket No. 50-298 Gentlemen:
Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for June 1983. The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown data, and a Narrative Summary of Operating Experience.
Should you have any comments or require additional information regarding this report, please contact me.
Sincerely, f f Mo%
P. V. Thomason Acting Station Superintendent Cooper Nuclear Station PVT:cg Enclosure cc: