OPERATING DATA REPORT DOCKET NO.
50 244 "17 7' 1903 DATE COMPLETED BY M
- E. M'-- -P-O Andrew E. McNamara" TELEPilONE OPERATING STATUS Ext. 301 at Ginna
- 1. Unit Name:
GINNA STATION. UNIT #1 Notes The annual Refueling June, 1983 and Maintenance Shutdown
- 2. Reporting Period:
1520 ended on 6/25/83 @ 0015.
- 3. Licensed Thermal Power (MW:):
490 Reactor Power levels were
- 4. Nameplate Rating (Gross MWe):
gradually escalated in steps 470
- 5. Design Electrical Rating (Net MWe):
to approximately 95% on 7/30.
490
- 6. Maximum Dependable Capacity (Gross MWe):
470
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, if Any (Net MTe):
- 10. Reasons For Restrictions, if Any:
This Month Yr. to-Date Cumulative 720.00 4,343.00 119.159.00
- 11. Ilours In Reporting Period
- 12. Number of Ilours Reactor Was Critical 314.17 2,315.25 89.201.40_,,
0 0
1,631.32 *
- 13. Reactor Reserve Shutdown llours 143.75
.2.141.75 87.121.88
- 14. Ilours Generator On-Line 0
0 8.5
- 15. Unit Reserve Shutdown llours 153,007 3,074,479 1.19,657,033
- 16. Gross Thermal Energy Generated (MWil)
- 17. Gross Electrical Energy Generated (MTil) 48,556 1,003.813 38.970.610
- 18. Net E!cetrical Energy Generated (MTil) 45,349 952,895~
36,938,957 19.97%
49.31%
73.11%
- 19. Unit Service Factor 19.97%
49.31%
73.12%
- 20. Unic Availability Factor 13.40%
46.68%
67.78%
- 21. Unit Capacity Factor (Using MDC Net) 13.40%
46.68%
67.78%
- 22. Unit Capacity Factor (Using DER Net) 0%
.91%
8.36%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Dare of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 0 Cummulative Total commencing January 1, 1975 8308110236 830707 PDR ADOCK 05000244 R
e '
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT
- 1, Ginna Station DATE July 7, 1983 COMPLETED BY
/7~ R
- f. Ath/o -
m_;__
Andrew E.
McNamara TELEPilONE 1 (315) 524-4446 Ext. 301 at Ginna MONTil
. Tune, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
17.
2.
18.
3.
19.
4.
20.
5.
21.
6.
22.
7.
23.
8.
24.
9.
25.
101 10.
26.
224 11.
27.
309 12.
28.
364 13.
29.
440 14.
30.
452 15.
31.
XXXXX 16.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
9 DOCKET NO.
50-244 t! NIT NAME _.81 Girna Station t
UNIT SHUTDOWN AND POWER REDUCTIONS DATE July _ 7, 1983 COMPLETED liY
_f. MlP5*1
_e Andrew E. M'cNai:iara REPORT MONTil June, 1983 ELEPIIONE 1 (315) 524-4446 Ext. 301 at Ginna n
N e
u C
Cause 8. Corrective Licensee e,
- j No.
Da te jj
}.cjj o2 e
=
Event
- g i
Action to g
>=
y Z_
y e ;5 e Report #
- j
!u Prevent Recurrence 2
g U
O Annual Refueling and Maintenance 83-2 3/26/83 to S
2,181.5 B,C 6/25/83 Outage ends at 0015 on date indicated l
1 2
3 4
F: Forced Reason:
Method:
Exhibit G -Ins suctions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data Il-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
E G-Operational Error (Explain) 4...
<nev. in u II-Other (Explain)
Exhibit 1 - Same Source
e NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT Ginna Station, Unit #1 DATE Julv 7, 1983 COMPLETED BY E % eE.>Pr1 Andrew E.
McNhmara 1
TELEPHONE 1 (315) 524-4446 EXT. 301 at Ginna MONTH June, 1983 The Annual Refueling and Maintenance Shutdown ended at 0015 on 6/25/83.
The Reactor Power Level was gradually escalated in steps to ~ 95% on 7/30.
Prior to the unit going on line, problems were experienced, as follows:
On G/18, experienced a Reactor Trip on Intermediate range low power.
On 6/19, after tie breakers were closed and unit had been on line, experienced a Turbine Trip (manual).
Total on line time was ~ one minute.
On 6/20 commenced a series of problems with the EH System that culminated in the unit startup.
On 6/25, the Reactor Power Level was gradually escalated in steps to the 95% level mentioned in the first paragraph.
Page 5 GINNA STATION Maintenance Report Summary June, 1983 During the month of June, routino inspections and maintenance were completed, along with maintenance scheduled during the Refueling Outage which was completed on 6/25/83.
Safety-related maintenance included:
1.
Maintenance activities to support Steam Generator Secondary Side Ilydrostatic Testing, and Steam Generator Crevice Cleaning.
2.
Upgrade of Boric Acid pipinq heat tracing.
l 3.
Inspection and maintenance of flydraulic Snubbers and Spring Hangers.
4.
Equipment airlock and personnel airlock inspection and minor maintenance.
5.
1C and ID Standby Auxiliary Feedwater Pump inspection and minor maintenance.
6.
Inspection and checkout of pressurizer heater connections.
7.
Repair of SGB-5, "B"
8.
Changeout of Pressurizer manway cover gasket.
9.
Rod Position Indication Calibrations.
10.
Control Rod testing.
11.
Delta T and T Avg. Zero Calibrations.
12.
"A" and "B"
Reactor Coolant Pump vibration checks.
13.
Incore and Excore calibrations and Axial Offsets.
14.
Steam Generator maintenance included secondary side water lancing before and after crevice cleaning, TV inspections of secondary side, closeup of Steam Generator primary and secondary manways and installation of secondary side blowdown tube lane blocking devices.
t
1 ROCHESTER GAS AND ELECTRIC CORPORATION
- 89 EAST AVENUE, ROCHESTER, N.Y.14649 t(LtpeONE
" " ~ ' "
GI?JtiA STATION July 7, 1983 Director, Of fice of Management Information and Program Analysis U.S.
tlUCLEAR REGULATORY COMMISSION Washington, DC 20555
Subject:
Monthly Report for June, 1983 Operating Status Information R.
E. Ginna lluclear Power Plant Unit ?Jo. 1 Docket IJo. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of June, 1983 Very truly yours, Bruce A.
Snow Plant Superintendent BAS /kdg Attachments cc: