ML20077H709

From kanterella
Jump to navigation Jump to search
Interim Significant Deficiency Rept SD 413-414/82-22 Re Personnel Air Locks.Air Locks Will Be Repaired & Completed by 830923 Instead of 830729 as Originally Planned
ML20077H709
Person / Time
Site: Catawba  
Issue date: 07/27/1983
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8308110231
Download: ML20077H709 (1)


Text

-

.USNRC pr.m Dunn PoWRnrGoMPu2N >.

v.o. nox saim> '

- V U C M CliAHIEFrTE. N.C. 28242 II AL 11. TI'CMl!R TEI2Pasone

,,; ""l"/,*,1 Juh2dfl0L9$3 AlQ ;

(7** "# ~*"

Mr.. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 Re: Catawba Nuclear Station Units 1 and 2 Docket Nos. 50-413 and 50-414

Dear Mr. O'Reilly:

In the Corrective Action section of Significant Deficiency Report SD 413-414/82-22, dated November 12, 1982, it was stated that the deficiencies in the personnel air locks would be tepaired by July 29, 1983. Due to the finding of more defects in the air locks than had been anticipated the work is now going to be complete by September-23, 1983.

Very truly yours, f4B. G L~Apf,y llal B. Tucker RWO/php cc: Director INPO Records Center Office of Inspection and Enforcement Suite 1500 U. S. Nuclear Regulatory Commission 1100 Circle 75 Parkway Washington, D. C. 20555 Atlanta, Georgia 30339 NRC Resident Inspector' Mr. Robert Guild, Esq.

Catawba Nuclear Station Attorney-at-Law P. O. Box 12097 Palmetto Alliance Charleston, South Carolina 29412 21351s Devine Street-

. Columbia, South' Carolina 29205 O',.

gyV,r 3 0> C B308110231 830727 l

PDR ADOCK 05000413 PDR S