ML20077H557

From kanterella
Jump to navigation Jump to search
RO 83-062/0:on 830619,carbon Dioxide Panels in Emergency Shutdown Room,Lower Cable Spreading Room & Upper Cable Spreading Room Removed from Svc for Planned Maint Work.Fire Watches Established.Sys to Be Restored by 830830
ML20077H557
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/01/1983
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RO-83-062-0, RO-83-62, NUDOCS 8308110065
Download: ML20077H557 (2)


Text

_ -.

4 Q

'1e?O.

E f MISSISSIPPI POWER & LI N 'M,,

c Helping Builri Mississippi sf

.jp,,

P. O. E O X 16 4 0, J A C K S O N, M I S S I S S I P PI 3 9'2 95

~Cy August 1, 1983 4g,

  • /p PAJCLEAR PRODUCTION DEPARTMENT Office of Inspection A Enforcee.ent U. S. Nuclear Regulatory Commission Region 11 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30303 Attention:

Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Special Report 83-062/0 -

Carbon Dioxide Panels Removed From Service to Allow Planned Maintenance Work AECM-83/0434 on June 19, 1983, Carbon Dioxide (CO ) Panels in the emergency shutdown 2

room, lower cable spreading room, and upper cable spreading room were removed from service for planned work in accordance with a design change package.

Dtiring testing of the design change on June 23, 1983, the manual isolation valve to the main header of the CO system w a el sed per testing 2

instructions. Fire watches were established in applicable areas of the Auxiliary and Control Buildings in accordance with Technical Specification 3.7.6.3.

The work is expected to be completed and system restored by August 30, 1983. This condition has no affect on the health and safety of the public and does not constitute a threat to plant safety. This Special Report is submitted due to exceeding the fourteen (14) day Limiting Condition for Operation time limit of Technical Specification 3.7.6.3.

Yours truly, L. F. Dale Manager of Nuclear Services EBS/SHH: sap l

cc:

(See Next Page) y7 0FI'1M 1G081i0065 830801 l

PDR ADOCK 05000416 gd(

l S

PDR l

Member Middle South Utilities System

AECM-83/0434

  1. E MITJZIEZIPPI POWER 0 LIGHT COMPANY cc: Mr. J. B. Richard Mr. R. B. McGehee Mr. T. B. Conner l

Mr. G. B. Taylor l

Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555

!