Interim Deficiency Rept DER 83-09 Re Low Pressure Safety Injection Pump a Suction Strainer Containing Foreign Matl & Torn Strainer in Pump B.Initially Reported on 830216.Final Rept Expected by 830921
ML20077F868
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 07/18/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-27333-RQT, DER-83-09, DER-83-9, NUDOCS 8308030108
Download: ML20077F868 (2)


Text

1

.  ?,

s

.( ,

. RECBym 1:p*v. -

Arizona Public Service Company P.o. BOX 21666

RJ) l'4 .

July 18, 1983 2;r,. pjf p.~-Q ANPP-27333-RQT/BSK U. S. Nuclear Regulatory Commission E0!OtJ ' 7, ..

Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension for Report - DER 83-09 A 50.55(e) Potentially Reportable Deficiency Relating to Unit 1 LPSI Pump "A" Suction Strainer Contains Foreign Material, And Pump "B" Strainer is Torn.

File: 83-019-026, D.4.33.2

Reference:

(A) Telephone Conversation Between T. Young and G. Duckworth on February 16, 1983.

(B) ANPP-23238 dated March 14, 1983 (Interim Report)

Dear Sir:

The NRC was notified of a Potentially Reportable Deficiency in Reference (A), and an Interim Report. was transmitted by Reference (B) . At that time, it was estimated that a Final Report would be available by July 15, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by September 21, 1983, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, dL) . o (L E. E. Van Brun , Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/RQT:ru cc: See Page 2 8309030100 830718 PDR ADOCK 05000528 S PDR l\ f197

.U. S. Nuclear Regulatory Commission Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington,.D. C. 20555 T. G. Woods, Jr.

G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum P. P. Klute/D. D. Green

~A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 l

--p =- ,y- g u c- , , . + ,- - = -m ., 9 - - - - . y ww .gy. -c. 1-