ML20077F629

From kanterella
Jump to navigation Jump to search
Corrects NRC Forwarding Insp Repts 50-413/91-09 & 50-414/91-09 Re Failure to Realign Essential Power Supplies While Removing DG 1B from Svc.Response to Violation 50-413/91-11-01 Will Be Provided by 910620
ML20077F629
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 06/12/1991
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9106200019
Download: ML20077F629 (1)


Text

'

ll l

lo te n w r n m

Ilu li it n e u

, p u y, p+ -

.% :, r t v o find ! !

Di lo, 3 C.NN/ I",

\\ " le i r 17:s!l U ' 1;;l DUKE POWER June 12,1991 U. S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, D.C. 20555

Subject:

Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413, 414 NRC Inspection Report Nos. 50-413, 414/91-09 Violations 50-413/91-09-01 and 50-414/91-09-02 Correction to Cover Letter My June 5,1991 cover letter transmitting the response to Violations 50-413/91-09-01 and 50-414/91-09-02 incorrectly stated Item B of the 50-41?i91-09-01 response addressed Violatior' 50-41'/M-Il-01 issued May 21,1991. Item B addresses a violation identified in Inspectio : Report 50-413, 414/91-11 invo'ving the fai'. ore to realign essential power supplies when removing the IB Diesel Generator from service. This violation was considered an additional example of Violation 50 413/91-09-01 and was not cited.

Violation 50-413/91-11-01 involved a failure to follow pro:edures while restoring the l A Diesel Generator to service resulting in a diesel fuel oil spill of approximately 1500 gallons in the diesel room. A response to Violation 50-413/91-11-01 will be provided by June 20,1991.

Very truly yours.

(lff 6,. 4kan-

/

ws Hal B. Tucker xc: Mr. S. D. Ebneter Regional Administrator, Region II Mr. W. T. Orders Senior Resident Inspector Mr. R. E. Martin, ONRR 9106200019 910612 ADOCK0500g, ggj PDR a

/fo