ML20077F629
| ML20077F629 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 06/12/1991 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9106200019 | |
| Download: ML20077F629 (1) | |
Text
'
ll l
lo te n w r n m
Ilu li it n e u
, p u y, p+ -
.% :, r t v o find ! !
Di lo, 3 C.NN/ I",
\\ " le i r 17:s!l U ' 1;;l DUKE POWER June 12,1991 U. S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, D.C. 20555
Subject:
Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413, 414 NRC Inspection Report Nos. 50-413, 414/91-09 Violations 50-413/91-09-01 and 50-414/91-09-02 Correction to Cover Letter My June 5,1991 cover letter transmitting the response to Violations 50-413/91-09-01 and 50-414/91-09-02 incorrectly stated Item B of the 50-41?i91-09-01 response addressed Violatior' 50-41'/M-Il-01 issued May 21,1991. Item B addresses a violation identified in Inspectio : Report 50-413, 414/91-11 invo'ving the fai'. ore to realign essential power supplies when removing the IB Diesel Generator from service. This violation was considered an additional example of Violation 50 413/91-09-01 and was not cited.
Violation 50-413/91-11-01 involved a failure to follow pro:edures while restoring the l A Diesel Generator to service resulting in a diesel fuel oil spill of approximately 1500 gallons in the diesel room. A response to Violation 50-413/91-11-01 will be provided by June 20,1991.
Very truly yours.
(lff 6,. 4kan-
/
ws Hal B. Tucker xc: Mr. S. D. Ebneter Regional Administrator, Region II Mr. W. T. Orders Senior Resident Inspector Mr. R. E. Martin, ONRR 9106200019 910612 ADOCK0500g, ggj PDR a
/fo