Monthly Operating Rept for May 1991 for Oyster Creek
ML20077F485
Person / Time
Site: Oyster Creek
Issue date: 05/31/1991
From: J. J. Barton, Corcoran T
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C321-91-2163, NUDOCS 9106190066
Download: ML20077F485 (7)


Text

.- y

  • d, GPU Nuclear Corporation 5 43 Muclear
en:r388 Forked River, New Jersey 08731-0388 609 971-4000 Wr:ter's Direct D;al Number:

June 11,1991 C321-91-2163 U.S.

Nuclear Regulatory Corra.ission ATTN: Document Control Desk Washington, D.C.

20555 Dear Sir

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Monthly Operating Report In accordance with the Oyster Creek Nuclear Generating Station Operating License No. DPR-16, Appendix A, Section 6.9.1.C, enclosed are two (2) copies of the Monthly Operating Data (gray book information) for the Oyster Creek Nuclear Generating Station.

If you should have any questions, please contact Brenda DeMarchant, Oyster Creek Licensing Engineer at (609) 971-4642.

ncerely, f

J.!J ' arton VIc President and Director 09 er Creek 1J JJB/BDEM: jc Enclosures cc:

Administrator, Region 1 Senior NRC Resident Inspector Oyster Creek NRC Project Manager (MOR) 9106190066 910531

[

l FDR ADOCK 05000219 R

PDR GPU Nuclear Corporation is a subsidiary of General Pubhc Util;t es Corporation

/

lf

MONTHLY OPERATING REPORT - MAY 1991 During May, Oyster Creek continued the 13R refueling outage.

L_-._______

I tiQ1LTHLY OPERATING REPORT MAY 1991 The following Licensee Event Reports were submitted during the month of May, 1991:

None

...m AVERAGE DAILY POWER LEVEL NET MWe DOCKET #.

50219-UNIT.

. OYSTER CREEK #1 REPORT DATE.

. JUNE 7, 1991 COMPILED BY

. JOHN H.

SEDAR TELEPHONE #.

.609-971-4698 l

i MONTH:

MAY, 1991 Dhi tfd Dhl US 1.

0 16.

0 2.

0 17.

0 3.

0 18.

0 4.

0 19.

0 5.

0 20.

0 6.

0 21.

0 7.

0 22.

0 8.

0 23.

0 9.

0 24.

0 10.

0 25.

0 11.

0 26.

0 12.

0 27.

0 13.

-0 28.

0 14.

0 29.

0 15.

0 30.

0 31.

O NRC_RPT.WPD/14

Oyster Creek Stotion #1 Docket No. 50-219 REFUELING INFORMATION - MAY, 1991 Name of Facility:

Oyster Creek Station #1 Scheduled date for next refueling shutdown: November 27, 1992 Scheduled date for restart following refueling: June 18, 1991 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Yes Technical Specification Change Request 180 was submitted to the NRC on 5-07-90.

This submittal was made in accordance with GL 88-16 to incorporate cycle specific parameters in a core operating limits report.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

1.

General Electric Fuel Assemblies Fuel design and performance analysis methods have been approved by the NRC.

2.

Exxon Fuel Assemblies - No major changes have been made nor are there any anticipated.

560 The number of fuel assemblies (a) in the core

=

(b) in the spent fuel storage pool = 1708 44 (c) in dry storage

=

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Present Licensed Capacity:

2600 The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

The reracking of the fuel pool is now complete.

All ten (10) racks are now installed.

Discharge capacity to the spent fuel pool will be available through the 1994 refueling outage.

1 NRC_RPT.WPD/13

)

OPERATING DATA REPORT OPERATING STATUS j

l

1. DOCKET:

50-219

2. REPORTING PERIOD:

5/91

3. UTILITY CONTACT:

JOHN SEDAR (609)971-4698 4.

LICENSED THERMAL POWER (MWt):

1930 5.

NAMEPLATE RATING (GROSS MWe):

687.5x0.8=550 6.

DESIGN ELECTRICAL RATING (NET MWe):

650 7.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

642 8.

MAXIMUM DEPENDABLE CAPACITY (NET MWe):

620 9.

IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

NONE

10. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NONE

11. REASON FOR RESTRICTION, IF ANY:

NONE MONTH LKAB CUMULATIVE

12. REPORT PERIOD HOURS 744.0 3623.0 187919.0
13. HOURS RX CRITICAL 0.0 1111.0 120176.2
14. RX RESERVE SHUTDOWN HRS 0.0 0.0 918.2
15. HRS GENERATOR ON-LINE 0.0 1109.2 117022.2
16. UT RESERVE SHTDWN HRS 0.0 0.0 1208.6
17. GROSS THERM ENERGY (MWH) 0 2099088 196994044
18. GROSS ELEC ENERGY (MWH) 0 707030 66312953
19. NET ELCT ENERGY (MWH)

-3324 670098 63630130

20. UT SERVICE FACTOR 0.0 30.6 62.3
21. UT AVAIL FACTOR 0.0 30.6 62.9
22. UT CAP FACTOR (MDC NET) 0.0 29.8 54.6
23. UT CAP FACTOR (DER NET) 0.0 28.5 52.1
24. UT FORCED OUTAGE RATE 0.0 0.0 11.5
25. FORCED OUTAGE HRS 0.0 0.0 15270.0
26. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION):

CURRENTLY SHUT DOWN FOR CYCLE 13 REFUELING OUTAGE.

27. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:

JUNE 18, 1991 NRC_RPT.WPD/15

UNIT 53UTDOWN3 AND POWER REDUCTIONS DOCKET NO.

50-219 UNIT NAME Ovster Creek DATE May, 1991 COMPLETED BY T. Corcoran TELEPHONE 971-4986 REPORT MONTH May, 1991 METHOD OF SHUTTING TYPE F: Forced DURATION DOWN THE REACTOR OR NO.

DATE S: Scheduled (Hours)

REASON (1)

REDUCING POWER (2)

CORRECTIVE ACTIONS / COMMENTS 104 910216 S

744 C

1 Shutdown for 13R Refueling Outage i

Summary :

(2) METHOD (1) REASON Operator Train!

' License Exam 1.

Manual a.

Equipment Failure (Explain) e.

2.

Manual Scram f.

Administrative b.

Maintenance or Test c.

Refueling g.

Operational Err <r gExplain) 3.

Automatic Scram 4.

Other (Explain) h.

Other (Explalat d.

Regulatory Restriction

_ _ -