Comments on Intervenor Discovery Requests for Documents Re Contention 6.Available Items Will Be Forwarded.Request for Performance Appraisals of Util Officials Unacceptable. Related CorrespondenceML20077F180 |
Person / Time |
---|
Site: |
Catawba |
---|
Issue date: |
07/26/1983 |
---|
From: |
Raymond Gibson DUKE POWER CO. |
---|
To: |
Guild R PALMETTO ALLIANCE |
---|
References |
---|
NUDOCS 8308010174 |
Download: ML20077F180 (4) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F8231999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212M1931999-09-13013 September 1999 Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl ML20212A3751999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp Interval ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER ML20211M8191999-08-25025 August 1999 Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance ML20211A9641999-08-20020 August 1999 Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2 ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment1999-08-16016 August 1999 Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0321999-08-13013 August 1999 Forwards Insp Repts 50-413/99-04 & 50-414/99-04 on 990606- 0717.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210Q3751999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date,In Order to Register Individuals for Exam ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages IR 05000413/19980131999-08-0202 August 1999 Discusses Integrated Insp Repts 50-413/98-13,50-414/98-13, 50-413/98-16,50-414/98-16 & NRC Special Repts 50/413/99-11 & 50-414/99-11 Conducted Between Aug 1998 & May 1999.Six Violations Occurred,Based on OI Investigation & Insp ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units IR 05000413/19990101999-07-22022 July 1999 Discusses Insp Rept 50-413/99-10 & 50-414/99-10 on 990314- 0424 & Forwards Notice of Violation Re Failure to Comply with TS 3.7.13,when Misalignment of Two Electrical Breakers Rendered SSS Inoperable from 981216-29 ML20217G5241999-07-20020 July 1999 Forwards Exam Repts 50-413/99-301 & 50-414/99-301 on 990524- 27,0603,07-10 & 16.Of Fourteen SRO & RO Applicants Who Received Written Exams & Operating Tests,Eight Applicants Passed & Six Failed Exam 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept1999-07-19019 July 1999 Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept 05000414/LER-1999-001, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196L0371999-07-0808 July 1999 Approves Requested Schedule Change of Current two-year Requalification Examinations to non-outage dates.Two-year Cycle Will Start on 991001 & Will End on 020930 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach1999-07-0808 July 1999 Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 IR 05000413/19990031999-07-0101 July 1999 Discusses Insp Repts 50-413/99-03 & 50-414/99-03 Completed on 990605 & Transmitted by Ltr .Results of Delibrations for Violation Re Discovery of Potentially More Limiting Single Failure Affecting SGTS Analysis Provided 1999-09-08
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20205G8191999-03-30030 March 1999 Provides Comments on Revised Draft Rfa for Duke Power ML20108B1181996-04-23023 April 1996 Forwards Groundwater Monitoring Rept for Catawba Nuclear Station Conventional Wastewater Treatment Ponds from Samples Collected on 960304 ML20100C0651996-01-25025 January 1996 Informs That DPC Would Like to Raise Level of Standby Nuclear SW Pond from 572 Feet to 574 Feet to Provide Addl Cw Due to Operational Concerns ML20095D5321995-12-0101 December 1995 Approves Facility 950920 Request to Use Dimethylamine in Feedwater Sys to Reduce & Prevent Corrosion Fouling ML20094R9311995-11-30030 November 1995 Requests Approval to Begin Using Polyacrylate Dispersant for Siltation Control.Product Will Be Used in Plants Nuclear Svc Water & Low Pressure Svc Water Sys & Discharged at non- Toxic Concentrations to Lake Wylie from Outfall 001 ML20094R6721995-11-29029 November 1995 Forwards Groundwater Monitoring Rept for CNS Conventional Wastewater Treatment Ponds.Samples Collected on 950905,in Accordance W/Sampling & Analysis Plan ML20094F7841995-11-0303 November 1995 Provides Copy of Record Sheet for Tracking Communications Diesel Run Hs at Plant.W/O Encl ML20093E4321995-10-0505 October 1995 Confirms 950918 Telcon Re Response to Sc Dept of Health & Environ Control Air Permit Insp ML20092K2341995-09-20020 September 1995 Revises 941014 Request for Mods of Thermal Limitations for Outfall 001,changing Daily Average Temp Limitation of 95 F to Weekly Average Temp ML20092K2431995-09-20020 September 1995 Requests Approval to Begin Using Dimethylamine Which Will Be Discharged in non-toxic Concentrations.Product Will Be Used in Plant FW Sys in Order to Reduce & Prevent Corrosion Fouling.Chronic Toxicity Study on Pre-Tect 9002 Encl ML20092G8211995-09-12012 September 1995 Provides Toxicity Test Results for Outfall 002 ML20087J6461995-08-14014 August 1995 Requests 6-month Extension to Continue Use of Na Br in Cooling Towers at Facility,Per NRC ML20086M9641995-07-19019 July 1995 Forwards NPDES Supplemental Info Update to NPDES Permit Application,Proposed Rewrite of NPDES Permit & Supplemental Info,Description of Requested Permit Changes & Marked Up of Existing Permit Showing Changes ML20083N5641995-05-17017 May 1995 Imforms That Since mid-March,continuous Flow Observed Coming from Stormwater Outfall 17/18.Util Concluded That Source of Effluent at Stormwater Outfall 17/18,leakage from Conventional Waste Treatment Basins ML20083P9891995-05-16016 May 1995 Forwards Groundwater Monitoring Data for CNS Conventional Wastewater Treatment Ponds.Samples Collected on 950313,in Accordance W/Protocol Outlined in Sampling Analysis Plan ML20083M1901995-05-10010 May 1995 Requests That 950315 Approval Ltr from Sc Dept of Health & Environ Control,Approving Use of Listed Treatment Chemicals, Be Modified & Reissued for Listed Reasons ML20082N4311995-04-19019 April 1995 Describes Discovery & Corrective Actions Concerning Discharge of Cooling Tower Water Through Stormwater Outfall, Reported to Ft Lawn Ofc on 950321 ML20080P7371995-02-28028 February 1995 Submits Follow Up Rept on Authorized Discharge of Cooling Water to Lake Wylie That Occurred on 950222-23 at Plant & Informs of No Observed Environ Impact During Discharge. Underground Pipe Repaired & Cause Being Investigated ML20080K1601995-02-15015 February 1995 Requests Approval to Use Listed Addl Treatment Chemicals. Informs That Request Needed by 950324 in Order to Meet Schedule ML20078J0361995-01-31031 January 1995 Forwards Revised Ltr from York County Stating Willingness to Serve CNS - Cooling Tower Yard,Project Ws 4610001 Along W/ Revised Flow Test Data ML20077K2611995-01-0404 January 1995 Requests That Sodium Bromide Be Approved as Permanent Treatment Compound for Control of Algae in Cooling Towers at Catawba Nuclear Station ML20073E4351994-09-15015 September 1994 Responds to Requesting Approval to Extend Timeframe for Sodium Bromide Trial Test for Use in Cooling Towers ML20072H6001994-08-16016 August 1994 Forwards Updated CNS Conventional Treatment Ponds Groundwater Monitoring Program ML20071L5811994-07-28028 July 1994 Informs That Floating Aerator Test Canceled & Will Not Be Performed for Sanitary Treatment Sys,Per Request Made to & Approved by Industrial & Agriculture Wastewater Div of Sc Dept of Health & Environ Control in June 1993 ML20069G9531994-06-0202 June 1994 Forwards Approval Ltr from DHEC Authorizing Use of Sodium Bromide in Cooling Towers.Internal DHEC Memo from V Beaty Giving Rept on Review of Toxicity Data Util Supplied to Sc on Sodium Bromide Also Encl ML20070M5851994-04-22022 April 1994 Submits Written follow-up Notification for Release of Ethylene Glycol on 940413.Caused by Technician Error.Pond Routinely Monitored for Adverse Environ Consequences & None Observed ML20070M1761994-04-15015 April 1994 Updates State of Sc on Status of SG Chemical Metal Cleaning Project Previously Scheduled to Occur This Summer.Decision Made Not to Perform Chemical Cleaning on Catawba Unit 2 SGs During Upcoming Outage ML20063K5961994-02-17017 February 1994 Forwards Approval from South Carolina Dept of Health & Environ Control to Use Treatment Chemicals for Steam Generator Chemical Metal Cleaning to Occur Later This Yr ML20062N4121993-12-28028 December 1993 Requests Approval to Use Ethylenediamine (EDA) & Ammonium Carbonate for Use in Cleaning Sgs.Info on EDA & Ammonium Carbonate Required by Permit (Part Iii,Item 9) Encl ML20059B1431993-12-21021 December 1993 Forwards 931213 Memo from South Carolina Dept of Health & Environ Control Approving Months of Mar,June,Sept & Dec as Months to Perform Toxicity Monitoring for Outfalls 001 & 002 ML20059C6391993-12-13013 December 1993 Ack Receipt of Re Biomonitoring at Outfalls 001 & 002 Required by NPDES Permit SC0004278.Agrees W/Request to Conduct Quarterly Biomonitoring Sampling During Third Month of Each Quarter Based on Review of Ltr ML20057D6341993-09-30030 September 1993 Requests Reduction in Toxicity Monitoring Requirements for Outfalls 001 & 002.Summary of Toxicity Monitoring History for Outfalls Listed ML20056H1461993-08-31031 August 1993 Discusses Plans to Change Util to Molybdate Based Corrosion Inhibitor Program Per Part III Item A.9 ML20056H1431993-08-31031 August 1993 Requests Trial Alternate Method Be Approved by State for Drainage of Cooling Towers at Util ML20044H1141993-05-27027 May 1993 Requests Permission to Use Sodium Bromide,On Trial Basis,To Control Biological Growth During Summer Months.Sodium Bromide Effective in High Ph Water & Need for Sulphuric Acid Should Almost Completely Be Eliminated ML20073E6061991-04-26026 April 1991 Forwards NPDES Discharge Monitoring Rept for Catawba Nuclear Station for Mar 1991. on 910321,overflow from Manway Discharged Into Standby Nuclear Svc Water Pond. Repairs Made to Clogged Line ML20077E0631991-04-18018 April 1991 Advises That on 910415,small Amount of Diesel Fuel Contamination Found While Drilling Cathodic Protection Well. Groundwater Monitoring Well Will Be Installed Where Well Drilled for Cathodic Protection Well ML20043B5701990-05-22022 May 1990 Forwards Description of Several Items Associated W/Facility Wastewater Treatment Sys Previously Not Mentioned in NPDES Permit Application ML19354E8791990-01-25025 January 1990 Forwards Application for NPDES Permit for Storm Water Discharge at Plant ML19324C2881989-11-0707 November 1989 Forwards Addl Info to Draft Renewal of NPDES Permit SC0004278 within 60 Days,Per 890707 Request.Info Should Be Considered as Supplemental to 881108 Application for Renewal of Permit ML20248F2951989-09-29029 September 1989 Notifies That on 890901,18.6 Lb of Hydrazine Released to Atmosphere.Caused by Blade of Handtruck Piercing Bottom of Drum While Transporting Hydrazine from Warehouse to Usage Point.Employees Evacuated ML20206C1521988-11-0808 November 1988 Forwards Application for Renewal of NPDES Permit SC0004278, Per 40CFR122.21 ML20153F4381988-08-30030 August 1988 Comments on Draft NPDES Permit Mod for Plant.Components of Draft Mod Acceptable W/Listed Exceptions ML20198B7371985-10-31031 October 1985 Advises That Documents Filed W/Nrc,Except for Legal Documents,Will No Longer Be Provided Since ALAB-813 Became Final Agency Action on 851025.Related Correspondence ML20133K4051985-10-0808 October 1985 Advises That Radiological Emergency Response Plan in Support of Fixed Nuclear Facilities Approved.W/O Ltr to NRC Indicating Approval of State & Local Plans & Preparedness ML20133K4091985-10-0808 October 1985 Advises That Emergency Response Plan Approved,Conditional Upon Verification of Alert & Notification Sys.W/O Ltr to NRC Indicating Approval of State & Local Plans & Preparedness ML20107L7211984-11-0808 November 1984 Confirms 841106 Telcon Re Answers to Applicant Interrogatories on EPJ-3 for Which Conservation Council Lead Intervenor.Interrogatories Filed on 841005 & Responses Due on 841029.Related Correspondence ML20088A6901984-04-0909 April 1984 Forwards Planning Research Corp Rept, Assumptions Underlying Departure Times for Evacuation of Emergency Planning Zone. W/O Encl.Related Correspondence ML20087N6541984-03-29029 March 1984 Forwards Applicant Supplemental Answers to Carolina Environ Study Group & Palmetto Alliance 840329 First Set of Interrogatories,Consisting of Answers from Agencies Included in Emergency Planning.Related Correspondence ML20087C4581984-03-11011 March 1984 Forwards Applicant Interrogatories & Request to Produce Documents Re Diesel Generator Contention,Per 840223 Order. Related Correspondence 1999-03-30
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML20043B5701990-05-22022 May 1990 Forwards Description of Several Items Associated W/Facility Wastewater Treatment Sys Previously Not Mentioned in NPDES Permit Application ML19354E8791990-01-25025 January 1990 Forwards Application for NPDES Permit for Storm Water Discharge at Plant ML19324C2881989-11-0707 November 1989 Forwards Addl Info to Draft Renewal of NPDES Permit SC0004278 within 60 Days,Per 890707 Request.Info Should Be Considered as Supplemental to 881108 Application for Renewal of Permit ML20248F2951989-09-29029 September 1989 Notifies That on 890901,18.6 Lb of Hydrazine Released to Atmosphere.Caused by Blade of Handtruck Piercing Bottom of Drum While Transporting Hydrazine from Warehouse to Usage Point.Employees Evacuated ML20206C1521988-11-0808 November 1988 Forwards Application for Renewal of NPDES Permit SC0004278, Per 40CFR122.21 ML20153F4381988-08-30030 August 1988 Comments on Draft NPDES Permit Mod for Plant.Components of Draft Mod Acceptable W/Listed Exceptions ML20198B7371985-10-31031 October 1985 Advises That Documents Filed W/Nrc,Except for Legal Documents,Will No Longer Be Provided Since ALAB-813 Became Final Agency Action on 851025.Related Correspondence ML20133K4091985-10-0808 October 1985 Advises That Emergency Response Plan Approved,Conditional Upon Verification of Alert & Notification Sys.W/O Ltr to NRC Indicating Approval of State & Local Plans & Preparedness ML20133K4051985-10-0808 October 1985 Advises That Radiological Emergency Response Plan in Support of Fixed Nuclear Facilities Approved.W/O Ltr to NRC Indicating Approval of State & Local Plans & Preparedness ML20107L7211984-11-0808 November 1984 Confirms 841106 Telcon Re Answers to Applicant Interrogatories on EPJ-3 for Which Conservation Council Lead Intervenor.Interrogatories Filed on 841005 & Responses Due on 841029.Related Correspondence ML20088A6901984-04-0909 April 1984 Forwards Planning Research Corp Rept, Assumptions Underlying Departure Times for Evacuation of Emergency Planning Zone. W/O Encl.Related Correspondence ML20087N6541984-03-29029 March 1984 Forwards Applicant Supplemental Answers to Carolina Environ Study Group & Palmetto Alliance 840329 First Set of Interrogatories,Consisting of Answers from Agencies Included in Emergency Planning.Related Correspondence ML20087C4581984-03-11011 March 1984 Forwards Applicant Interrogatories & Request to Produce Documents Re Diesel Generator Contention,Per 840223 Order. Related Correspondence ML20086T2921984-03-0202 March 1984 Forwards Exercise Evaluator Document Used in Conjunction w/840215-16 Emergency Mgt exercise,NUREG-0654,Rev 1 & Portion of Community Issues Survey Dealing W/Emergency Planning.W/O Encls ML20080J7451984-02-0707 February 1984 Forwards Listed Documents,Per 840125 Discovery Request. Related Correspondence ML20079N4711984-01-24024 January 1984 Responds to 840123 Telephone Inquiry Re Termination Date for Discovery on Emergency Planning Contentions.All Discovery Must Be Completed by 840206.Copy of Student Emergency Plan Booklet Encl.Related Correspondence ML20079J3391984-01-20020 January 1984 Advises of Separate Transmittal of Requested Documentation Re Lamination & Foreman Override.Related Correspondence ML20079H9801984-01-17017 January 1984 Forwards Documents Requested During 840116 Visit to General Ofcs.W/O Encl.Related Correspondence ML20079F8251984-01-16016 January 1984 Informs That Listed Documents Added to 840106 Compilation of Documents Available for Review.Related Correspondence ML20082S4611983-12-0909 December 1983 Responds to Request for Documents from Util & State & Local Govts Re Discovery on Emergency Planning Contentions. Documents Available in Util Ofc.Related Correspondence ML20082D7061983-11-17017 November 1983 Informs That Once Documents Requested at 831021 Conference Re Discovery on Emergency Planning Contentions Compiled, Request Will Be Reviewed to Determine Which Documents Fall within Scope of Contentions.Related Correspondence ML20078G0181983-10-0404 October 1983 Requests 831017 Meeting in Charlotte,Nc to Discuss Discovery Needs Re Emergency Planning Contentions & Projected Schedule for Completing Discovery for All Parties Before 840201. Related Correspondence ML20080P1201983-09-29029 September 1983 Ack Receipt of Requesting Info on Util Spent Fuel Mgt Plans.Area Is Ever Changing So Precise Mix of Options Util Will Adopt Is Difficult to Predict.Flexibility Must Exist in Future.Related Correspondence ML20024F3011983-09-0606 September 1983 Forwards Util Const Project Evaluation for 830927-1014. Evaluation Is Self Evaluation Using INPO Criteria.Evaluation Is Sent Per ASLB 830901 Order Confirming Rulings Announced at 830831 Conference Call.W/O Encl.Related Correspondence ML20076C9831983-08-17017 August 1983 Forwards State of Sc Technical Radiological Emergency Response Plan & Sc Operational Radiological Emergency Response Plan Per Statement of 830808 Prehearing Conference. W/O Encl ML20076C8021983-08-17017 August 1983 Forwards Documents Re Emergency Plans.W/O Encl.Related Correspondence ML20076C7961983-08-17017 August 1983 Forwards Documents Re Emergency Plans.W/O Encl.Related Correspondence ML20076C8271983-08-16016 August 1983 Requests Update of Util Precautions Re Safe Transshipment of Spent Fuel Through State of Sc.Related Correspondence ML20077F1801983-07-26026 July 1983 Comments on Intervenor Discovery Requests for Documents Re Contention 6.Available Items Will Be Forwarded.Request for Performance Appraisals of Util Officials Unacceptable. Related Correspondence ML20024B7341983-07-0606 July 1983 Advises of Availability of Welding Inspector Supervisors to Be Deposed.Written Notices of Deposition Must Be Served. Related Correspondence ML20099B4361983-07-0101 July 1983 Advises That Util Employees Receiving Notices of Deposition Will Be Available for Deposition Between 830701 & 15.Related Correspondence ML20072H5661983-06-23023 June 1983 Discusses Palmetto Alliance Notices of Depositions.Some Individuals Unavailable on Dates Proposed.Related Correspondence ML20079R1751983-06-15015 June 1983 Submits Position on Conduct Re Dispositions of Util Employees Ordered by ASLB 830613 Memorandum & Order.Related Correspondence ML20071L9461983-05-24024 May 1983 Forwards 830517 & 20 Ltrs from Hb Tucker to Jg Davis & HR Denton,Respectively,Per Request.W/O Encl ML20071L9651983-05-24024 May 1983 Lists post-discovery Administrative Matters Requiring Resolution.Remaining Documents Should Be Identified in Response to ASLB 830513 Order,By 830531 ML20023C0381983-05-0505 May 1983 Discusses 830502 Telcon Re Recording of Applicant & Palmetto Alliance Depositions on Contentions 27,16,8,44,6 & 7.Draft Stipulation Encl ML20073T0411983-05-0404 May 1983 Forwards Notices of Deposition for W Mcafee,Nr Hoopingarner & M Lowe Re Palmetto Alliance Contentions.Related Correspondence ML20073R6441983-04-29029 April 1983 Forwards Documents Identified in Per 830428 Telcon.W/O Encls.Related Correspondence ML20073J7841983-04-14014 April 1983 Forwards List of Documents Re Util 820525 Presentation to NRC Concerning Resolution of Insp Concerns.Documents Will Be Made Available for Copying & Insp.Related Correspondence ML20069F5981983-03-18018 March 1983 Forwards Dj Abernethy,Cw Graves & Jc Wolfmeyer Interrogatory Affidavits.Jl Elliott Job Title Should Be Changed to Principal engineer,mechanical-nuclear Div.Related Correspondence ML20071D5271983-03-0707 March 1983 Forwards Affidavit of Nondisclosure to Be Signed in Order to Receive B&W Proprietary Document in Response to Palmetto Alliance Interrogatory 2 on Contention 44.Related Correspondence.W/O Encl ML20079J3351982-12-23023 December 1982 Requests Complete Copy of Palmetto Alliance & Carolina Environ Study Group Objections to ASLB 821201 Order & Motion for Reconsideration or Certification ML20038A6421981-11-0202 November 1981 Discusses Info Requested & Items Discussed at 811030 Meeting.Related Correspondence 1990-05-22
[Table view] |
Text
. .. _
4 ^
Cr .
,BELATEQ CORRESPONDENd k DUKE POWER GOMPANY terd ccc 9
LEGAL DEPARTMENT ,
E O. Box 30180 GHARLOTTE. N. G. ese4e ge g go g > m g Q omeedm9s-me ato e onesow W .,
]
,o V~'
July 26,1983 Robert Guild, Esq. /
Palmetto Alliance /
2135 Devnae Street MMC []- '/
Columbia , S . C . 29205 FROD.N& UTIL. FAC,.. .w:.s*:c'"M
Dear Mr. Guild:
During the course of the recent depositions on Contention 6, various witnesses mentioned documents or reports which you indicated you were'not aware of and which had not been made available to you during the course of discovery. As you requested, many of these documents were provided to you during the depositions. These documents were not made available to you because they were not requested under any of your discovery requests , and in some instances, they are not relevant to Contention 6. You became aware of these documents during the course of the depositions because you conducted basic discovery depositions instead of limiting the scope of the depositions as indicated in the Board's Orders of June 13 and June 20, 1983.
The Board's June 13, 1983 Order denied Palmetto's motion for additional discovery " insofar as it seeks several additional months of unrestricted discovery. " (p.1) The Board granted Palmetto's motion "to the limited extent of allowing it to conduct depositions of . . . personnel who may have knowledge of matters relating to quality assurance and control in welding at Catawba . " (p. 6-7) The Board noted that " Palmetto has foregone its
. opportunity for exploratory depositions on [ Contention 6]," and allowed "an additional period of time for Palmetto to take depositions concerning quality assurance in welding." (p.2)
. In its June 20,1983 Order, the Board narrowed Contendon 6 to three areas:
"(1) the Hoopingarner and McAfee concerns; (2) the welding concerns; [and]
l (3) concerns first surfacing between [May 27, 1983] and the hearing." (p.6)
The Board noted that this narrowing of Contention 6 was consistent with the l June 13 Order which " authorized a more limited time for Palmetto to take depositions concerning quality assurance in welding." (p. 6) The Board did not precisely define the welding concerns, but referred to the attachments to your motion for additional discovery , time.
You have intimated that Applicants are somehow at fault because these documents are just now coming to your attention. These documents in all likelihood would have come to your attention earlier if you had either
. requested them during discovery or had deposed these same witnesses earlier.
. We initially objected to questions that were broad and general in scope, and not clearly related to " quality assurance and quality control in welding at Catawba . " Because the Board Chairman was unavailable for any expedited rulings on the scope of the depositions, and in an effort to minimize the 8308010174 830726 DR ADOCK 05000413 PDR gh
1 disruptions and delay that would result from limiting the depositions to quality assurance in welding, we decided to allow Duke witnesses to respond to the more_ general questions . As indicated above, the witnesses identified documents that you were not aware of.
Some of the. documen.ts you requested were made available to you during the
- course of the depositions. I have compiled a list of these documents from my deposition notes wnich -is set forth as attachment A to this letter. This list includes documents made available to you in response to the broad request for documents included in your Notice of deposition.
With respect to documents which we declined to produce, I requested that you make a list of those documents so that we could review these requests and attempt to resolve these matters without the necessity of a Board ruling. You have provided me a list of six requests. We are responding to these requests as follows:
- 1. Any new procedures, or revisions in existing procedures, used by welding inspectors - to identify construction deficiencies and conditions .
i adverse to quality , determine the cause of these conditions and the corrective actions to be taken, that have not already been provided by the Applications during the course of these depositions.
We are uncertain as to the scope of this request. - We assume that you want to know how construction deficiencies are identified and the procedures used to resolve or correct these identified deficiencies. In other words, you are
( interested in changes in how the welding inspector goes about doing his job.
~'
All procedQres that were revised as a result of the welding inspector concerns and the task force recommendations were provided to you earlier. There were other procedure changes which did not result from the task force efforts, but were the result of the ongoing review and revision of all QA procedures.
These procedures will be made available to you and are set forth on an attachment B to this letter.
- .x
! N '2. The "INPO Self-Initiated Evaluation of Catawba, Design and Construction 1- Criteria ," (the self-evaluation , by whatever name, conducted around October of 1982).
i We object to producing the entire evaluation report because it'goes far beyond p the present scope of Contention 6. In addition, this evaluation did not result -
from the welding inspector concerns, and is not in any significant way related to those concerns. We will produce for you those parts of the evaluation
! which ' deal with quality assurance and quality control as it may affect or
- mention welding inspection at Catawba. We will also produce general information from the evaluation so tliat you might understand the scope of the evaluation. We will similarly make available the same' kind of information from i
an INPO practice audit which was not mentioned during the course of depositions and has not been requested by you.
- 3. Documents describing the " Performance Management Plan" including implementing forms and worksheets.
We will make available to you a copy of the manual which describes the Performanc~e Management Plan. We are making this document available to you L
. o .
because it may help you understand the performance evaluation and recourse of Mr. G. E. Ross, which was made available to you during the course of Mr.
. Davison's deposition. By making this manual available to you, we do not waive our objection to including within the scope of Contention 6 the performance evaluations of various Duke officials. During the course of the depositions, we declined to reveal the specific evaluations of Duke management officials, and as indicated below, we decline to make available the performance appraisal of Mr. Davison or other Duke management officials.
- 4. Any documents which analyze trends in the issuance of NCI's, R-2A's, M-4's, R-6's or other identified procedures which identify deficiencies in construction that have been used by welding inspectors from 1974 to the ns s present. , , ,
These trending documents were not requested during the course of discovery in the case. I have been advised that these documents are quite voluminous.
We will review the trending documents and will make available to you the documents which identify trends in welding. A review of .the documents is underway, and as soon as that review is complete, we will forward to you copies of any documents which identify trends in welding.
( 5. Any documents reflecting the activities, mission , or reports of the NCI u Review Team headed by Mr. W.H. Bradley, including Mr. Bradley's log and correspondence.
We ma.de available to you earlier the document which describes the non-conformance evaluation team and the check list used by the team. You asked questions of Mr. Grier, Mr. Bradley, Mr . Dick , and Mr. Markle concernirig- this evaluation team. We have also made available to you the Bradley correspondence as chairman of the evaluation team which relates to welding non-conforming items, and Mr. Markle was available and answered questions concerning this correspondence. We will also make available to you
. the log referred to during the course of Mr. Bradley's deposition. We will not make any of the other documents relating to this team available. As we indicated during the course of depositions, this team was not formed as a result of the welding inspector task forces, the documents were not requested by you in discovery, and the documents that we have not produced are beyond the scope of the depositions which were limited to quality assurance in welding at Catawba.
~
- 6. Documents reflecting the performance / work evaluations of Mr.
L.R. Davison made by his superiors from the time Mr. Davison took on supervisory duties with regard to the welding inspectors till the present.
This type of request seeks to open up an entirely new area of discovery in this case, and we object to making the performance appraisal of Mr. Davison or other Duke officials available.
_. - .. = .. . . ~ . ~. -
.- ' . l. .
The items that we are making available are included with this letter to the extent that have been able to identify and copy them to date. Those items not included will be forwarded to you as soon as possible.
rely yours, Ronald L. Gibson c: George M. Johnson w/ encl. , ,
J. Michael McGarry w/ encl; Service List w/o encl.