.e DUKE Powen GOMPANY 18.0. HOx 33180 CIIAHLOTTE, N.C. 28242 IIAL 15. TL*CKER TE LEPHONE
_;=a==
July 22, 1983 no4) amsai v
Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:
Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Docket Nos. 50-369, 50-370
Dear Mr. Denton:
McGuire Nuclear Station, Unit 2, Facility Operating License NPF-17 requires that Duke Power Company provide "...the upgra ed post-trip review procedures for NRC staff review" (Paragraph 2.C.(12)d.).
By letter dated May 20, 1983 Duke notified the NRC staff that the " Reactor Trip", " Unit Fast Recovery" and
" Controlling Procedure for Unit Startup" procedures were changed to require that the evaluation conducted by the Performance Group be completed prior to restart following a reactor trip. Accordingly, a copy of each of these proce-dures is hereby submitted.
It should be noted that future changes in this area are likely as a result of requirements issued in Generic Letter 83-28 " Required Actions Based on Generic Implications of Salem ATWS Events".
Any additional changes relative to post-trip review will be described in the report required by Sections 1.1 and 1.2 of the enclosure to Generic Letter 83-28.
Please advise if there are any questions regarding this matter.
Very truly yours,
// b etc 1 B. Tucker CAC:php cc:
Mr. James P. O'Reilly, Regional Administrator Mr. W. T. Orders U. S. Nuclear Regulatory Commission NRC Resident Inspector Region II McGuire Nuclear Station 101 Marietta Street NW, Suite 2900 Atlanta, Georgia 30303
\\