ML20077E610

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to North Anna Unit 1 Cycle 9 Startup Physics Test Rept
ML20077E610
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/04/1991
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20077E614 List:
References
91-302, NUDOCS 9106110108
Download: ML20077E610 (1)


Text

m.__.___..._..__.-.-._____... . ..____._ __ _ _ ._ _ .m __--. _ _

e YI!f GINI A 151.I:CTifl(' ANI) I'OWI:H COM l'A N Y ll I C it M O N D, VI I(O I N I A 2112 61 Junc 4, 1991 United States Nuclear Regulatcry Commission Serial No.91-302 Attention: Document Control Desk NL&P/JYR:Jmj Washington, D.C, 20555 Docket No. 50-338 License No. NPF-4 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT 1 i CYCLE 9 STARTUP PHYSICS TESTS REPORT As required by North Anna Technical Specification 6.9.1 enclosed are five copies of the Virginia Electric and Power Company Technical Report NE-840, " North Anna Unit w_/ 1, Cycle 9 Startup Physics Tests Report," This report summarizes the results of the physics testing program performed after initial criticality of Cycle 9 on March 7,1991.

The results of the physics tests were within required design tolerances and applicable Technical Specification limits.

7 V3.ryjruly oury 1 /

j p!! V

. LT$towart Senior /Vice President - Nuclear .

Enclosures cc: United States Nuclear Regulatory Commission Region ll 101 Marietta Street, N.W.

Suite 2900 Atlanta, GA 30323 Mr. M. S. Lesser NRC Senior Resident inspector  :

I

, North Anna Power Station L

l a

j fs, g DR ODOCK 0500o333 PDR hkh

--