ML20077D803

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Catawba Nuclear Station Unit 1 Cycle 6 Core Operating Limits Rept
ML20077D803
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 05/28/1991
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20077D807 List:
References
NUDOCS 9106050188
Download: ML20077D803 (1)


Text

  • ll l iu,i n,o

"'l ^ 7pll(, ,

l 1

na.m 3 e .s "I l-j;g, g, ot>xt powt:n May 28,1991 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Catawba Nuclear Station, Unit 1 Docket No. 50-413 Unit 1/ Cycle 6 Core Operating Limits Report Attached is the Catawba Nue'mr Station Unit 1 Core Operating Limits Report which documents the core operating limits so that a? pplicable limits of the Safety Analysis are met. This report ir ;bmitted per recLlcal Specification 6.9.1.9.

Very truly yourt, ,,

fs /U. G< -o c,~

Hal B. Tucker CRIJCOLRU191 ,

Attachment xc: (w/ attachment)

S. D. Ebneter Regional Administrator, Region II R. E. Martin, ONRR W. T. Orders Senior Resident Inspector QD s II 9106050188 9105:8 {

i PDR ALOCK 0500 M13 P JDR

- -_- -- __ -____-_ - __ ----_-_ -- - -